BOREHOLE NO: 49 BORING METHOD: Shell & Auger / Rotary Drilling DATE OF COMMENCEMENT: 09.05.08 DATE OF COMPLETION: 10.05.08 CASING DEPTH (m) N VALUE STRATA DEPTH (m) 0.00 SAMPLE & INSITU TESTS DEPTH (m) TYPE NO. Size: 150mm/Nx SITE: Durgapur Steel Plant (SAIL) LOCATION : CO-ORDINATE: X + 9098, Y + 18935 ORIENTATION: Vertical DESCRIPTION BORELOG: 49 SHEET: 1 RL: 81.372m DEPTH: 15.60m

1.00 2.00

D D

1 2

2.30

Filled up soil comprising of coal dust and other heterogeneous materials

2.50 2.95 4.00 4.45 5.50 5.95

P U P

1 1 2

17 33 39 5.80

Very stiff to hard, brownish grey sandy clay with kankar

7.00 7.85 8.50 8.95 9.50 9.70 10.50 10.60

P P P P

3 4 5 6

46 52 >100 >100 10.60

Very dense, brownish yellow silty sand

DRILLING FROM 10.60 11.60 12.60 13.60 14.60 TO 11.60 12.60 13.60 14.60 15.60 NET RUN 1.00 1.00 1.00 1.00 1.00 REC. % Nil Nil Nil Nil Nil RQD. % Nil Nil Nil Nil Nil

INSITU TEST TYPE P7 P8 P9 P10 P11 N VALUE >100 >100 >100 >100 >100 15.60

Highly weathered sandstone

and

decomposed

feldspathic

Water Level Observation Water Lev. Date Time Below GL.

D Disturbed Sample
Remarks Borehole is terminated at 15.60m below existing ground level. SWL

B Bulk Sample
3.90 m B. G. L.

W Water Sample U Undisturbed Sample P Standard Penetration Test