Lap - PMM411 - Des 2013 - 2
Lap - PMM411 - Des 2013 - 2
WO - Procs Train B
WO - Procs Train C 1 2 3 4 5 6 2013113875 C1-E-2 2013110466 C2-KT-1 2013083234 C0-PIPE-0 2013112912 C4-PSV-57 2013112775 C2-E-7 2013112772 C2-E-7 2 3 3 3 3 3
C1E-2 gas leak at End cover east side Flange HPsteam trap C2KT-1 bad leak Pipe shoe support B/D line Tr"C" bergeser posisinya (mau jatuh) The 3/4" Union Coupling U/S Of C4-PSV-57 leak.
C IP
C C
02/12/2013 Completed 03/12/2013 Completed 04/12/2013 Completed 04/12/2013 Completed 06/12/2013 Completed 06/12/2013 Completed
- Replaced 3/4" Union Coupling U/S Of C4-PSV-57 C Tighten Bolt Channel To Shell of C2-E-7 . C Repair Leak Bleeder 3/4" of C2-E-7 .
The Channel To Shell of C2-E-7 Leak. The Bleeder 3/4" of C2-E-7 Leak.
WO - Procs Train D - Install Scaffolding For Repair Vacuum Breaker. - - Replaced 2" Butterfly Valve & Vacuum Breaker ( Scaffolding 1 X 6M ).
1 2013110222
D4-E - 1A
IP
IP
IP
100
02/12/2013
05/12/2013 Completed
Sar