WEEKLY STATUS WO PMM 411 ( Train A / B / C / D )

Periode : 30 Nov ~ 06 Des 2013


STATUS No. WO N0 EQP No. PRTY WORK ORDER DESCRIPTION 30 Procs Train A / B / C / D WO - Procs Train A 1 Nov ~ Des 2 3 4 5 6 ACTUAL WORK PERFORMANCE PROG % START DATE COMPL'D DATE REMARK

WO - Procs Train B

WO - Procs Train C 1 2 3 4 5 6 2013113875 C1-E-2 2013110466 C2-KT-1 2013083234 C0-PIPE-0 2013112912 C4-PSV-57 2013112775 C2-E-7 2013112772 C2-E-7 2 3 3 3 3 3
C1E-2 gas leak at End cover east side Flange HPsteam trap C2KT-1 bad leak Pipe shoe support B/D line Tr"C" bergeser posisinya (mau jatuh) The 3/4" Union Coupling U/S Of C4-PSV-57 leak.

C IP

C C

Tighten Bolt End Cover of C1-E-2 ( Scaffolding 1 X 8M )

100 100 100 100 100 100

02/12/2013 03/12/2013 03/12/2013 04/12/2013 06/12/2013 06/12/2013

02/12/2013 Completed 03/12/2013 Completed 04/12/2013 Completed 04/12/2013 Completed 06/12/2013 Completed 06/12/2013 Completed

- Repair steam trap C2KT-1. - Scaffolding 1 X 8M & 1 X 12M ).


Reposition Pipe shoe support B/D line Tr"C (

- Replaced 3/4" Union Coupling U/S Of C4-PSV-57 C Tighten Bolt Channel To Shell of C2-E-7 . C Repair Leak Bleeder 3/4" of C2-E-7 .

The Channel To Shell of C2-E-7 Leak. The Bleeder 3/4" of C2-E-7 Leak.

WO - Procs Train D - Install Scaffolding For Repair Vacuum Breaker. - - Replaced 2" Butterfly Valve & Vacuum Breaker ( Scaffolding 1 X 6M ).

1 2013110222

D4-E - 1A

The vacuum breaker of 4E - 1A is passing

IP

IP

IP

100

02/12/2013

05/12/2013 Completed