Professional Documents
Culture Documents
S02 3G RPLS2 - v2-0 The Physical Layer
S02 3G RPLS2 - v2-0 The Physical Layer
S02 3G RPLS2 - v2-0 The Physical Layer
=
=
15
0
j s, s j
b AI a
s
AICH signature pattern (fixed)
Acquisition Indicator
+1 if signature s is positively confirmed
-1 if signature s is negatively confirmed
0 if signature s is not included in the
set of available signatures
42 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Nokia Parameters Related to the PRACH and AICH
In RAN1, Node B L1 shall be able to simultaneously scan 12 RACH sub-channels with 4 signatures per sub-channel from UEs situating up
to 'Cell radius' distance from the Node B site. 'Cell radius' is the maximum radius of the cell and it is given from the RNC to the Node
B. In RAN1, the maximum value for the 'Cell radius' is 20 km.
WCEL: PRACHRequiredReceivedCI
This UL required received C/I value is used by the UE to calculate the initial output power on PRACH according to the Open loop power
control procedure. This parameter is part of SIB 5.
[-35 dB..-10 dB]; step 1 dB; default -25 dB
WCEL: PowerRampSteponPRACHPreamble
UE increases the preamble transmission power when no acquisition indicator is received by UE in AICH channel. This parameter is part
of SIB 5.
[1dB..8dB]; step 1 dB; default: 2 dB
WCEL: PowerOffsetLastPreamblePrachMessage
The power offset between the last transmitted preamble and the control part of the PRACH message.
[-5 dB..10 dB]; step 1 dB; default 2dB
WCEL: PRACH_preamble_retrans
The maximum number of preambles allowed in one preamble ramping cycle, which is part of SIB5/6.
[1 ... 64]; step 1; default 8.
43 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Nokia Parameters Related to the PRACH and AICH
WCEL: RACH_tx_Max
Maximum number of RACH preamble cycles defines how many times the PRACH pre-amble ramping procedure can be
repeated before UE MAC reports a failure on RACH transmission to higher layers. This message is part of SIB5/6.
[1 ... 32]; default 8.
WCEL: PRACHScramblingCode
The scrambling code for the preamble part and the message part of a PRACH Channel, which is part of SIB5/6.
[0 ... 15]; default 0.
WCEL: AllowedPreambleSignatures
The preamble part in a PRACH channel carries one of 16 different orthogonal complex signatures. Nokia Node B
restrictions: A maximum of four signatures can be allowed (16 bit field).
[0 ... 61440]; default 15.
WCEL: AllowedRACHSubChannels
A RACH sub-channel defines a sub-set of the total set of access slots (12 bit field).
[0 ... 4095]; default 4095.
44 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Nokia Parameters Related to the PRACH and AICH
WCEL: PtxAICH
This is the transmission power of one Acquisition Indicator (AI) compared to CPICH power. This parameter is part of SIB
5.
[-22 ... 5] dB, step 1 dB; default: -8 dB.
WCEL: AICHTraTime
AICH transmission timing defines the delay between the reception of a PRACH access slot including a correctly detected
preamble and the transmission of the Acquisition Indicator in the AICH.
0 ( Delay is 0 AS), 1 ( Delay is 1 AS) ;default 0.
WCEL: RACH_Tx_NB01min
In case that a negative acknowledgement has been received by UE on AICH a backoff timer TBO1 is started to determine
when the next RACH transmission attempt will be started. The backoff timer TBO1 is set to an integer number NBO1 of 10
ms time intervals, randomly drawn within an Interval 0 s NB01min s NBO1 s NB01max (with uniform distribution).
[0 ... 50]; default: 0.
WCEL: RACH_Tx_NB01max
[0 ... 50]; default: 50.
45 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
eamble Max
eamble
N
N
Pr ,
Pr
Overload Detection in the Random Access
Signature SubRach
eamble Max
N N N =
8
5
Pr ,
time
RachOverLoadBS
RachNormalLoadBS
RACH for NRT RAB
not allowed
RACH for NRT RAB
allowed
RNC
WinRACHnormalLoadBS
(time measured in RACH indication periods)
WinRACHoverLoadBS
(time measured in RACH indication periods)
46 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Nokia Parameters Related to the PRACH and AICH
WCEL: RACHCapacity
RACH Capacity defines the HW capacity reserved for a RACH transport channel in the Node B. RACH Capacity is given
as a number of decoded RACH messages in a 10 ms radio frame.
2, 4, 8; default: 2
WCEL: RRIndPeriod
The parameter defines the reporting period of the Radio Resource Indication messages, which are used for cell based load
measurements. The Node B informs the RNC about the current load at the radio interface from the radio resource point of
view and the load of every RACH in each cell.
[100 ... 2000] ms, step 100 ms; default: 200 ms
WCEL: RACHloadIndicationPeriod
The parameter defines the reporting period of the PRACHs in a Node B. The Node B may report load figures to the RNC
in every Nth (N=1-20) NBAP Radio Resource Indication message. Value 0 of the parameter means that the BTS does not
report the load information for RACH.
[0 ... 20], step 1; default 1
47 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Nokia Parameters Related to the PRACH and AICH
WCEL: RachOverLoadBS
This parameter defines the threshold when RACH is considered to be in overload.
[0 ... 100] %, step 1 %; default 100%
WCEL: WCEL: WinRACHoverLoadBS
Parameter defines the comparison window size for RACH overload detection in RACH load indication periods.
[0 ... 100], step 1; default 1
WCEL: RachNormalLoadBS
This parameter defines the threshold when RACH is considered to be in normal load.
0 ... 100] %, step 1 %; default 100%
WCEL: WinRACHnormalLoadBS
Parameter defines the comparison window size for RACH normal load detection in RACH load indication periods.
[0 ... 100], step 1; default: 5
48 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Part VI
Common Packet Channel
49 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Downlink Dedicated Physical Channel (DPCH)
Node B
UE
No response
by the
Node B
PCPCH (access preamble)
PCPCH (access preamble)
PCPCH (access preamble)
No response
by the
Node B
AP-AICH (possitive indication)
PCPCH (collision detection preamble)
CD/CA-ICH (possitive acknowledgement)
PCPCH (power preamble & data)
50 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
A
P
A
P
t
p-p
t
p-p
t
p-cdp
CD/CA
AP-AICH CD/CA-ICH
t
p-a1
t
cdp-pcp
t
a1-cdp
t
cdp-a2
CPCH Timing
Power Control
Preamble
(0 or 8 timeslots)
data
DPCCH for CPCH
Example with Tcpch=0
adopted from TS 25.211 V3.12.0
51 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
PCPCH Timing
Slot 0 Slot 1 Slot 2 Slot 14
10 ms Frame
TPC
bits
Pilot bits
TFCI
bits
CPCH Control Command
(CCC) bits
SP = 512
DPCCH for CPCH.
Slot 0 Slot 1 Slot 2 Slot 14
10 ms Frame
TPC
bits
Pilot bits TFCI bits
Data 1 bits
DPDCH with C
CH,SF,SF/4
,
with SF = 4..256
DPCCH with C
CH,256,0
FBI bits
PCPCH message part
52 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
PCPCH Access & Collision Detection Preamble
Node B
UTRAN
BCCH
UE
RNC
P
i
P
i
P
i
P
i
Preamble Signature
(16 different versions)
16 bits
256 repetitions
PCPCH Preamble Scrambling Code
512 groups 80 (64) preamble scrambling
codes
available signatures for random access
available preamble scrambling codes
available spreading factor
available sub-channels
etc.
53 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Nokia and the CPCH
CPCH will be supported with RAN 2.
Following Layer 1 parameters are required
Access preamble (AP) scrambling code
Access preamble signature set. The maximum number of these is 16. These can be shared with RACH or separate.
AP slot sub-channels group.
Collision detection (CD) preamble scrambling code.
CD preamble signature set. The number of these is 16 and can be shared or separate with RACH.
CD preamble slot sub-channels group
CD-AICH preamble channelisation code
CPCH scrambling code
CPCH channelisation code (variable, depends on bitrate)
DPCCH DL channelisation code
54 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Part VI
Dedicated Physical Channel
Downlink
55 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Downlink Dedicated Physical Channel (DPCH)
Slot 0 Slot 1 Slot 2 Slot 14
10 ms Frame
TPC
bits
Pilot bits
TFCI
bits
(optional)
Data 2 bits Data 1 bits
DPDCH DPDCH DPCCH DPCCH
Radio Frame
0
Radio Frame
1
Radio Frame
2
Radio Frame
71
Superframe = 720 ms
17 different slot formats
Compressed mode slot format for changed SF
& changed puncturing
56 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Downlink Dedicated Physical Channel (DPCH)
TS TS
maximum bit rate
TS TS TS
discontinuous transmission with lower bit rate
Multicode usage:
TS TS TS
TS TS TS
DPCH 1
DPCH 2
DPCH 3
57 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Power Offsets for the DPCH
Node B RNC
DCH Data Frame
Iub
UE
Uu
PO1
NBAP: RADIO LINK SETUP REQUEST
TPC
bits
Pilot bits
TFCI
bits
(optional)
Data 2 bits Data 1 bits
PO3 PO2
Power offsets
TFCS
DL DPCH slot format
FDD DL TPC step size
...
P0x: 0..6 dB
step size: 0.25 dB
58 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Nokia Parameters Related to DPCHs
RNC: PowerOffsetDLdpcchPilot
The parameter defines the power offset for the pilot symbols in relative to the data symbols in dedicated downlink physical
channel
[0 6 dB]; step size 0.25 dB; default: 3 dB for 12.2 kbps
RNC: PowerOffsetDLdpcchTpc,
The parameter defines the power offset for the TPC symbols relative to the data symbols in dedicated downlink physical
channel
[0 6 dB]; step size 0.25 dB; default: 3 dB for 12.2 kbps
RNC: PowerOffsetDLdpcchTfci,
The parameter defines the power offset for the TFCI symbols relative to the data symbols in dedicated downlink physical
channel.
[0 6 dB], step size 0.25 dB; default: 3 dB for 12.2 kbps
More details about the load management can be found in the course 3G RPLS 3.
59 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Downlink Inner Loop Power Control
DPC_MODE = 0
unique TPC command
per TS
DPC_MODE = 1
same TPC over 3 TS,
then new command
two modes
cell
TPC
TPC
est
per
1 TS / 3 TS
60 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Downlink Inner Loop Power Control
UTRAN behaviour
P(k) = P(k - 1) + P
TPC
(k) + P
bal
(k),
current
DL power
power
adjustment
new
DL power
Correction term
for RL balancing
toward CPICH
P
time
P
TPC
P
bal
IF
Limited Power Increase Used = 'Not used'
P
TPC
(k) =
+ A
TPC
, if TPC
est
(k) = 1
- A
TPC
, if TPC
est
(k) = 0
A
TPC
step size: 0.5, 1, 1.5 or 2 dB
mandatory
61 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Downlink Inner Loop Power Control
UTRAN behaviour
P(k) = P(k - 1) + P
TPC
(k) + P
bal
(k),
current
DL power
power
adjustment
new
DL power
Correction term
for RL balancing
toward CPICH
P
time
P
TPC
P
bal
IF
Limited Power Increase Used = 'used'
DL_Power_Averaging_Window_Size
P
TPC
Power_
Raise_
Limit
K-1
TPC
est
(k) = 1 => P
TPC
(k) = 0
otherwise as
see preceding
slide
K
time
62 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Timing Relationship between Physical Channels
SFN mod 2 = 0 SFN mod 2 = 1
P-CCPCH
AICH access
slots
0 1 12 8 2 11 7 5 9 6 4 13 10 3 14 0
SCH
n
th
S-CCPCH
t
S-CCPCH,n
k
th
S-CCPCH
t
DPCH,k
0..38144
(step size 256)
0..38144
(step size 256)
63 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Radio Interface Synchronisation
UE
cell
1
T
0
=
1024
chips
cell
2
= target
cell for HO
Tm =
timing difference
range: 0..38399
Res.: 1 chip
SRNC
(Frame Offset, Chip Offset)
Relative timing
between DL DPCH
and P-CCPCH
range: 0..38144
res.: 256 chips
Offset
between DL DPCH
and P-CCPCH
range: 0..38399
res.: 1 chip
(Frame Offset)
(TM)
64 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Part VI
Dedicated Physical Channel
Uplink
65 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Uplink Dedicated Physical Channels
Slot 0 Slot 1 Slot 2 Slot 14
10 ms Frame
TPC
bits
Pilot bits
TFCI bits
(optional)
Data 1 bits
Radio Frame
0
Radio Frame
1
Radio Frame
2
Radio Frame
71
Superframe = 720 ms
DPDCH
DPCCH FBI bits
7 different
slot formats
6 different slot formats
Compressed mode slot format for
changed SF & changed puncturing
Feedback Indicator for
Closed loop mode transmit diversity, &
Site selection diversity transmission (SSDT)
66 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Discontinuous Transmission and Power Offsets
DPCCH
DPDCH
DPCCH
DPDCH
DPCCH
DPDCH
TTI TTI TTI
UL DPDCH/DPCH Power Difference:
DPCCH
DPDCH
=
|
d
|
c
=
Nominal Power Relation Aj
two methods to determine the gain factors:
signalled for each TFCs
calculation based on reference TFCs
67 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
UL Inner Loop Power Control
time
SIR
est
SIR
target
TPC TPC_cmd
in FDD mode:
1500 times per second
68 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
UL Inner Loop Power Control
PCA2 PCA1 PCA2
algorithms for processing power control commands
TPC_cmd
PCA1
TPC_cmd for each TS
TPC_cmd values: +1, -1
step size A
TPC
: 1dB or 2dB
PCA2
TPC_cmd for 5
th
TS
TPC_cmd values: +1, 0, -1
step size A
TPC
: 1dB
UL DPCCH power adjustment: A
DPCCH
= A
TPC
TPC_cmd
km/h
0
~ 3 ~ 80
Rayleigh fading can be compensated
69 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Power Control Algorithm 1
Example: reliable transmission
Cell 1
Cell 2
Cell 3
TPC
1
= 1 TPC
3
= 0
TPC
3
= 1
TPC_cmd = -1
70 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Power Control Algorithm 2 (part 1)
TPC_temp
0
0
0
0
1
0
0
0
0
0
0
0
0
0
-1
if all TPC-values = 1
TPC_temp = +1
if all TPC-values = 0
TPC_temp = -1
otherwise
TPC_temp = 0
71 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Power Control Algorithm 2 (part 2)
TPC_temp
1
TPC_temp
2
TPC_temp
3
Example:
=
N
i
i
N
1
TPC_temp
1
N = 3
-1 -0.5 0 0.5 1
TPC_cmd = -1 1 0
72 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Initial Uplink DCH Transmission
reception
at UE
trans-
mission
at UE
T
0
DPCCH only,
always based on PCA1
DPCCH & DPDCH
PCA based on RRC
0 to 7 frames for
power control preamble
DPCCH only DPCCH & DPDCH
DPCCH_Initial_power = CPICH_RSCP + DPCCH_Power_offset
73 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Part VII
Downlink Shared Channel
74 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Physical Downlink Shared Channel (PDSCH)
Slot 0 Slot i Slot 14
10 ms Frame
Data DPDCH
TFCI with PDSCH
association
DPCH
PDSCH
10 ms DPCH Frame 3 TS 15 TS DSCH arrival window
SF = 256..4
75 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Physical Downlink Shared Channel (PDSCH)
PDSCH Root Channelisation Tree
e.g.
SF=128 SF=256 SF=64 SF=32
PDSCH root
channelisation code
PDSCH 1
PDSCH 2
UE 1
SF = 32
UE 2
SF = 64
UE 1
SF = 64
UE 3
SF = 64
UE 1
SF = 64
UE 3
SF = 64
UE 2
SF = 128
UE 2
SF = 128
UE 3
SF = 128
76 NOKIA topic: The Physcial Layer / July 2003 /Markus Wimmer
Physical Downlink Shared Channel (PDSCH)
BS
MS2
MS3
MS1
MS4
DSCH
Associated
DCH's
Bit rate
Power
DSCH
Associated
DCH's
DSCH bit rate
depends on location
DCH bit rate
is constant
DSCH power is
about constant
Challenges:
No SHO => effect to coverage and capacity?
Fast allocation => bursty interference and resource reservation.
Power control from DCH.
DSCH is major change for BS and RNC.
Iub resource usage => need for statistical multiplexing.
Possibilities:
Fast allocation => more efficient code and other resource usage.
User prioritization easy.
Shorter end-user delay. (Set-up delay is the same than in DCH!)
Better controllable in overload situations.
Higher peak bitrates can be used.