. GRAEVINA: HOTELSKI KOMPLEKS BABIN KUK OZNAKA PROJEKTA: SNOP-C BK BROJ PROJEKTA: 12270-2009.
FAZA: IZRADIO:
IZVEDBENI PROJEKT FAKULTET ELEKTROTEHNIKE I RAUNARSTVA Zavod za visoki napon i energetiku Unska 3, 10000 ZAGREB Prof.dr.sc. Tomislav Tomia Dubravko Dajevi, dipl.ing
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 1
INVESTITOR: GRAEVINA: VRSTA DOKUMENTACIJE: NAZIV PROJEKTA: PROJEKT IZRADIO: OZNAKA PROJEKTA: BROJ PROJEKTA:
DUBROVNIK BABIN KUK d.d. HOTELSKI KOMPLEKS BABIN KUK IZVEDBENI PROJEKT SUSTAV ZA KONTROLU VRNOG OPTEREENJA NADOGRADNJA SUSTAVA SNOP FER, Zagreb, Unska 3 Zavod za visoki napon i energetiku SNOP-C BK 12270-2009
SADRAJ
KNJIGA 1
0. 1. 2. 3. 4.
NASLOVNI LISTOVI I SADRAJ OPI DOKUMENTI PODLOGE TEHNIKI OPIS SPECIFIKACIJA OPREME
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List:
1 1
1.0
Listova:
1. OPI DOKUMENTI
Izvadak iz sudskog registra Uvjerenje projektanta Imenovanje glavnog projektanta Izjave Prikazi mjera zatite na radu i zatite od poara Program kontrole i osiguranja kvalitete
IMENOVANJE
PROJEKTANTA
Zagreb, 23.02.2009.
Temeljem lanka 180. Zakona o prostornom ureenju gradnji (NN br.76/07) Prof.dr.sc. TOMISLAV TOMIA, dipl.ing upisan u Imenik ovlatenih inenjera elektrotehnike pod red.br. 76 (Klasa: UP/I-310-34/99-01/76, Urbroj: 314-01-99-1 od 01.09.1999.) imenuje se za projektanta PROJEKT: GRAEVINA: INVESTITOR: Teh. broj: SUSTAV ZA KONTROLU VRNOG OPTEREENJA NADOGRADNJA SUSTAVA SNOP Hotelski kompleks Babin kuk - Dubrovnik DUBROVNIK BABIN KUK d.d. 12270-2009.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List:
1 2
1.4
Listova:
Temeljem lanka 192. Zakona o gradnji (NN br. 76/07), te Pravilnika o sadraju izjave projektanta o usklaenosti projekta s odredbama posebnih zakona i drugih propisa (NN br. 98/99) PROJEKTANT Prof.dr.sc. Tomislav Tomia, dipl.ing s rjeenjem broj UP/I-310-34/99-01/76 od 01.09.1999. o upisu u Imenik ovlatenih inenjera elektrotehnike pod rednim brojem 76 daje
IZJAVU
O USKLAENOSTI PROJEKTA
PROJEKT: GRAEVINA: INVESTITOR: TEH. BROJ: SUSTAV ZA KONTROLU VRNOG OPTEREENJA NADOGRADNJA SUSTAVA SNOP Hotelski kompleks Babin kuk - Dubrovnik Dubrovnik Babin kuk d.d. 12270-2009.
Ovaj projekt usklaen je s: Zakonom o prostornom ureenju i gradnji (NN br. 76/07) Zakonom i zatiti od poara (NN 58/93, 33/05) Zakonom o zatiti na radu (NN 59/96, 94/96, 114/03) Zakonom o normizaciji (NN 163/03) Zakonom o zatiti prirode (NN 30/94, 72/94) Zakonom o zatiti okolia (NN 82/94) Zakonom o vodama (NN 107/95) Zakonom o mjernim jedinicama (NN 58/93) Pravilnikom o tehnikim mjerama za pogon i odravanje elektroenergetskih postrojenja (SL 19/68) Pravilnikom o tehnikim normativima za elektrine instalacije niskog napona (SL 53/88, 54/88) Pravilnikom o tehnikim normativima za elektroenergetska postrojenja nazivnog napona iznad 1000 V (SL 4/74, 13/78) Pravilnik o tehnikim normativima za zatitu niskonaponskih mrea i pripadajuih trafo stanica (Sl. list br. 13/78) Pravilnikom o tehnikim normativima za projektiranje i izvoenje prikljuaka i ormara i zgradama (Sl. list br. 35/74) Pravilnikom o tehnikim normativima za niskonaponske elektrine instalacije (Sl. list br. 53/88, 31/89 i 53/91) Pravilnikom o tehnikim normativima za zatitu elektroenergetskih postrojenja od prenapona (SL 7/71 i 47/76) Pravilnikom o tehnikim propisima o gromobranima (SL 13/78) Pravilnikom o tehnikim normativima za zatitu od statikog elektriciteta ( SL 62/73) Pravilnikom o temeljnim zahtjevima za zatitu od poara elektroenergetskih postrojenja i ureaja (NN 146/05)
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List:
2 2
1.4
Listova:
Pravilnikom o najviim doputenim razinama buke u sredini u kojoj ljudi borave i rade (NN 37/90) Opim uvjetima za opskrbu elektrinom energijom (NN 14/06) Tehnikim uvjetima za izbor i polaganje elektroenergetskih kabela nazivnog napona od 1 kV do 35 kV (BIL 22/93) Tehnikim mjerama zatite elektroenergetskih postrojenja i objekata od malih ivotinja (BIL 55/96) Pravilnikom o odravanju elektrodistribucijskih objekata i postrojenja (HEP, Direkcija za distribuciju, 1992.)
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List:
1 1
1.4
Listova:
Temeljem lanka 14. stavak 3 i 4. Zakona o zatiti od poara (NN 58/93, NN 33/05) izdaje se
ISPRAVA
kojom se potvruje da: PROJEKT: GRAEVINA: INVESTITOR: TEH. BROJ: SUSTAV ZA KONTROLU VRNOG OPTEREENJA NADOGRADNJA SUSTAVA SNOP Hotelski kompleks Babin kuk - Dubrovnik Dubrovnik Babin kuk d.d. 12270-2009
sadri sva tehnika rjeenja za primjenu pravila zatite od poara kojima e predmetna graevina u potpunosti zadovoljavati kad bude u upotrebi. Zagreb, oujak 2009.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List:
1 1
1.4
Listova:
Temeljem lanka 93. stavak 4. Zakona o zatiti na radu (NN br. 59/96, 94/96, 114/03) izdaje se
ISPRAVA
kojom se potvruje da: PROJEKT: GRAEVINA: INVESTITOR: TEH. BROJ: SUSTAV ZA KONTROLU VRNOG OPTEREENJA NADOGRADNJA SUSTAVA SNOP Hotelski kompleks Babin kuk - Dubrovnik Dubrovnik Babin kuk d.d. 12270-2009.
sadri sva tehnika rjeenja za primjenu pravila zatite na radu. Zagreb, oujak 2009. Zagreb, svibanj 2008.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 4
1.5
SUSTAV ZA KONTROLU VRNOG OPTEREENJA NADOGRADNJA SUSTAVA SNOP Hotelski kompleks Babin kuk - Dubrovnik Dubrovnik Babin kuk d.d. 12270-2009.
PRIKAZ TEHNIKIH RJEENJA ZA PRIMJENU PROPISA ZATITE NA RADU I MJERA ZATITE OD POARA
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 4
1.5
1.5.1 Prikaz tehnikih rjeenja za primjenu propisa zatite na radu Obzirom na neophodnost provoenja mjera sigurnosti na predmetnom objektu za vrijeme izvedbe i koritenja instalacija razlikujemo slijedee mjere: RADOVI NA IZVEDBI ELEKTROENERGETSKOG POSTROJENJA Osiguranje gradilita Da bi se postigla djelotvorna zatita svih radnika na gradilitu potrebno je ustrojiti organizaciju gradilita, skladinog prostora, transporta materijala i alata, te kretanja radnika po gradilitu. Gradilite mora biti osigurano od nekontrolirana pristupa ljudi na gradilite. Po zavretku grubih radova potrebno je ukloniti sve predmete koji bi ometali slobodno kretanje radnika na gradilitu ili koji bi mogli ugroziti sigurnost izvoenja radova. Osiguranje radnika Radnici moraju biti opremljeni odgovarajuim alatom i priborom potrebnim za izvoenje radova, te imaju obvezu koritenja odgovarajuih osobnih zatitnih sredstava i zatitnih naprava. Radnici moraju obavljati poslove dunom pozornou sukladno pravilima i propisima struke i zatite na radu, te drugim pozitivnim propisima. Radnici su duni prije poetka rada pregledati mjesto rada, te o eventualno uoenim nedostacima izvijestiti poslodavca, a prije naputanja mjesta rada ostaviti mjesto rada i sredstva za rad u takvom stanju da nikoga ne ugroavaju. Izvoenje instalacije Instalacije treba u cijelosti izvesti prema vaeim propisima, normama i uputama iz ove tehnike dokumentacije. Instalacije u smislu zatite od elektrinog udara moraju biti izvedene sa: - zatitom od direktnog dodira - zatitom od indirektnog dodira. Zatita od direktnog dodira mora biti izvedena zatitom dijelova pod naponom izoliranjem primjenom odgovarajuih izolacionih materijala, ugradnjom opreme u zatitna kuita i koritenjem zatitnih pregrada, te dopunskom zatitnom mjerom zatite od direktnog dodira pomou zatitnog ureaja diferencijalne struje, tamo gdje je to neophodno. Zatita od indirektnog dodira mora biti izvedena zatitnom mjerom automatskog isklapanja napajanja koritenjem zatitnih ureaja nadstrujne, a u skladu s primijenjenim sistemom uzemljenja mree na koju se prikljuuje objekt. Zatitni ureaji nadstruje predvieni su tako da obuhvaaju zatitu od preoptereenja strujnih krugova i zatitu od kratkog spoja.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
3 4
1.5
Cjelokupna instalacija mora se izvesti vodovima ili kabelima ija izolacija odgovara radnom naponu 0.6/1kV. Svi spojevi na mjestu grananja u instalaciji izvode se u instalacijskim razvodnim kutijama s poklopcem. Razdjelnici el. energije moraju biti opremljeni vratima koja se zakljuavaju i na taj nain onemoguavaju pristup neovlatenim osobama. Oprema u razdjelnicima mora biti oznaena prema oznakama strujnih krugova. Shema spoja mora biti smjetena unutar razdjelnika. Na vanjskoj strani razdjelnika mora se nalaziti natpis koji upozorava na opasnost od elektrine struje. Na instalaciji je potrebno izvesti zatitno uzemljenje i izjednaenje potencijala. KONTROLA I POPRAVAK ELEKTROENERGETSKOG POSTROJENJA Pri radu na novoj instalaciji ili na odravanju postojee instalacije treba se pridravati osnovnih pravila sigurnosti pri radu s elektrinom strujom: 1. 2. 3. 4. 5. iskljuenje napajanja vidljivi prekid osiguranje protiv ponovnog namjernog ili sluajnog ukljuenja utvrivanje beznaponskog stanja zatitno uzemljivanje i kratko spajanje ograivanje od dijelova pod naponom i primjena zatitne opreme
Kontrolu instalacije obavlja ovlateni kvalificirani radnik uz odgovarajue mjere zatite i ispitne ureaje. Popravak instalacije obavlja ovlateni kvalificirani radnik u beznaponskom stanju, a na vrata razdjelnika mora staviti natpis sa upozorenjem da se obavljaju radovi na instalaciji. Prije poetka radova na instalaciji treba ispitati je li napajanje strujnog kruga izvedeno sa jedne ili vie napojnih toaka kako bi se iskljuili osigurai svih napojnih toaka i omoguio nesmetan rad odnosno popravak na instalaciji. Nakon obavljenog popravka instalacije istu je potrebno ispitati i dovesti u potpunu funkcionalnu ispravnost. KORITENJE ELEKTROENERGETSKOG POSTROJENJA Na ulaznim vratima prostorije u kojima je smjeteno elektroenergetsko postrojenja potrebno je postaviti natpise s upozorenjem na opasnost od elektrine struje. Unutar prostorije na uoljivom mjestu potrebno je postaviti jednopolnu elektrinu shemu postrojenja. Sva polja razvodnih ormara te upravljako-signalna oprema moraju imati odgovarajue oznake. Ispred svih razvodnih ormara postaviti izolacijske tepihe u duljini ormara irine 1 m.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
4 4
1.5
1.5.2 Prikaz predvienih mjera zatite od poara Svi kabeli i vodii imaju PVC izolaciju. U instalaciji nema gorivih materijala. Sav materijal je atestiran i ima pojedinane ili tipske ateste o kontroli kvalitete. Napojni kabel i svi ostali vodovi su dimenzionirani s obzirom na dozvoljeni pad napona i strujno optereenje. U normalnom pogonu pregrijavanje vodia nije mogue, jer struja normalnog optereenja ne prelazi trajno dozvoljenu struju. Svi strujni krugovi i troila su zatieni od razornog djelovanja struja kratkog spoja i zemljospoja zatitnim ureajima brze karakteristike okidanja. U sluaju kratkog ili dozemnog spoja, zatitni ureaj e pouzdano iskljuiti oteeno troilo prije no to se pojave opasne struje kratkog spoja. Izvedena je instalacija izjednaenja potencijala svih metalnih masa. Sve prostorije moraju biti opskrbljene aparatima za gaenje poara prahom (S) odnosno ugljinim dioksidom (CO2).
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 4
1.6
SUSTAV ZA KONTROLU VRNOG OPTEREENJA NADOGRADNJA SUSTAVA SNOP Hotelski kompleks Babin kuk - Dubrovnik Dubrovnik Babin kuk d.d. 12270-2009.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 4
1.6
1.6.1 Program kontrole i osiguranja kakvoe OPI UVJETI Ovi tehniki uvjeti su tehnika pojanjenja za ovu vrstu instalacija i sastavni su dio projekta i shodno tome obavezujui za izvoaa. Elektrine instalacije koje su predmet ovog projekta moraju se izvesti prema nacrtima iz projekta, tehnikom opisu i trokovniku shodno vaeim Hrvatskim propisima i pravilima struke. Za sve promjene i odstupanja od ovog projekta mora se pribaviti pismeno odobrenje od nadzornog inenjera odnosno projektanta. Izvoa je obvezan prouiti tehniku dokumentaciju prije poetka radova, te pismeno zatraiti pojanjenja od projektanta, odnosno pismeno dati svoje primjedbe. Sav materijal koji e se koristiti pri izvedbi radova mora odgovarati Hrvatskim standardima. Izvoa ne smije ugraditi materijal koji nije specificiran trokovnikom, osim ako se sa tom izmjenom pismeno suglasi projektant. Svi radovi moraju biti kvalitetno izvedeni. Svi radovi koji bi se tokom izvedbe ili kasnije pokazali nekvalitetnim moraju se ponovo izvesti o troku izvoaa. Izvoa mora pribaviti dokaze o kvaliteti svih ugraenih proizvoda i opreme, te dokaze o kvaliteti izvedenih radova, a posebno dokaze o kvaliteti vezane za zatitu od poara. Kabeli se polau po naznaenoj trasi u planu instalacija potujui pri tome poloaj postojeih i projektiranih instalacija. Pri odmatanju kabela treba pripaziti da se kabel ne oteti ili usue. Pri polaganju kabela treba se pridravati propisanog radijusa savijanja. Nulti i zatitni vodii ne smiju biti osigurani, a moraju se razlikovati od faznih vodova po boji. U elektrinom smislu vodii moraju predstavljati neprekinutu cjelinu. Nastavljanje vodova smije se izvoditi iskljuivo kabelskim spojnicama. Razdjelnice, svjetiljke i drugi instalacijski materijal treba prije montae ispitati na tehniku ispravnost. Svi elementi u razvodnim ormarima moraju biti postavljani pregledno i oznaeni prema propisom definiranim oznakama, a elementi na vratima natpisnim ploicama. Pri izvedbi radova osobitu panju posvetiti ve postojeim instalacijama kako ne bi dolo do oteenja. Sva orua i strojevi za izvedbu radova, kao i orua i strojevi koji e se koristiti u projektiranom objektu moraju biti atestirani i provjereni u odnosu na sigurnost u eksploataciji.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
3 4
1.6
Tijekom izvoenja postrojenja obvezno osigurati projektantski i struni nadzor. MJERENJA, ATESTI I INSPEKCIJSKI PREGLEDI Pri isporuci opreme dostavljaju se potvrde o kvaliteti isporuene opreme, atesti i ispitna izvjea o pojedinanim ispitivanjima kojima se dokazuje da je oprema izraena i ispitana sukladno vaeim propisima. Razvodni ormari - atesti o tipskom ispitivanju Kabeli atesti proizvoaa ispitna izvjea nakon polaganja
Konstruktivni dijelovi postrojenja dokazi o kvaliteti materijala bravarije izjava o galvanskoj povezanosti svih metalnih masa izvjee o mjerenju otpora pogonskog i zatitnog uzemljenja
1.6.2. Primjenjeni propisi na elektroenergetskim postrojenjima - Zakon o prostornom ureenju i gradnji (NN br. 76/07) - Zakon o zatiti od poara (NN br. 58/93, NN 33/05) - Zakon o zatiti na radu (NN 59/96 i 94/96) - Pravilnik o zatiti na radu pri koritenju el. energije (NN br. 9/87) - Zakon o preuzimanju Zakona o standardizaciji Republike Hrvatske (NN br. 53/91) - Pravilnik o tehnikim normativima za zatitu niskonaponskih mrea i pripadnih transformatorskih stanica (SL br. 13/78) - Pravilnik o tehnikim propisima o gromobranima (SL br. 13/68 i 21/90) - Pravilnik o tehnikim normativima za niskonaponske elektrine instalacije (SL br. 53/88, 31/89 i 53/91) - Pravilnik o tehnikim normativima za zatitu od statikog elektriciteta (SL. br. 62/73) Primijenjene norme: - HRN N.A0.826 Elektrine instalacije zgrada, Termini i definicije - HRN N.B2.741 Elektrine instalacije zgrada, Zatita od elektrinog udara - HRN N.B2.742 Elektrine instalacije zgrada, Zatita od toplinskog uinka - HRN N.B2.743 Elektrine instalacije zgrada, Nadstrujna zatita - HRN N.B2.730 Elektrine instalacije zgrada, Ope karakteristike i klasifikacija - HRN N.A5.070 Stupnjevi zatite elektrine opreme ostvarene pomou zatitnih kuita - HRN N.A9.001 Klasifikacija elektronskih i elektrinih ureaja s obzirom na zatitu od elektrinog udara - HRN N.B2.752 Elektrini razvod, trajno dozvoljene struje
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
4 4
1.6
- HRN N.B2.754 Elektrine instalacije zgrada, Uzemljenje i zatitni vodii - HRN N.B2.771 Elektrine instalacije zgrada, Prostorije s kadom ili tuem - HRN N.C0.006 Elektroenergetika, Oznaavanje izoliranih vodia i kabela - HRN N.C0.010 Elektroenergetika, Boje za oznaavanje i sustavi oznaavanja ila kabela i izoliranih vodia za napone do 1000V - HRN EN 60529 2000 Stupnjevi zatite osigurani kuitima (IP code) -
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List:
1 1
2.0
Listova:
2.
PODLOGE
ELEKTROENERGETSKO NAPAJANJE KOMPLEKSA BABIN KUK SUSTAV ZA NADZOR OPTEREENJA - SNOP ANALIZA POTRONJE EL. ENERGIJE PROJEKTNI PROGRAM
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 8
2.1
2.1
SADRAJ
2.1 ELEKTROENERGETSKO NAPAJANJE KOMPLEKSA BABIN KUK .......................... 2 2.1.1 TS 10/0,4 kV - kotlovnica...................................................................................... 3 2.1.2 TS 10/0,4 kV - gospodarski centar ....................................................................... 3 2.1.3 TS 10/0,4 kV - Plakir ............................................................................................ 3 2.1.4 TS 10/0,4 kV - President ...................................................................................... 5 2.1.5 TS 10/0,4 kV - Argosy .......................................................................................... 6 2.1.6 TS 10/0,4 kV - Tirena ........................................................................................... 7 2.1.7 GRO 0,4 kV - Mineta .......................................................................................... 8
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 8
2.1
2.1
TS Argosy
GRO Mineta
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
3 8
2.1
Hotelski kompleks Babin kuk koji obuhvaa 5 hotela: President, Argosy, Tirena, Plakir i Mineta i gospodarski centar, napaja se iz srednjenaponske 10 kV mree. Glavni napojni kabel 10 kV dovodi el. energiju u rasklopite koje se nalazi u sklopu kotlovnice hotela Plakir. Iz tog rasklopita napajaju se transformatorske stanice TS 10/0,4 kV, koje se nalaze u sklopu pojedinih hotela kao to prikazuje Slika 2.1.1. Hotel Mineta nema vlastitu transformatorsku stanicu 10/0,4 kV, ve se njegov glavni razvodni ormar - GRO napaja iz TS Tirena preko niskonaposkog kabelskog voda 0,4 kV. Jednopolnu shemu elektroenergetskog sustava prikazuje Slika 2.1.2. 2.1.1 TS 10/0,4 kV - kotlovnica TS sadri etiri transformatorske elije: - elija br. 1 - ugraen je transformator snage 630 kVA - transformator je fiksno kompenziran kondenzatorskom baterijom 45 kVAr. - elija br. 2 - ugraen je transformator snage 1000 kVA. - elija br. 3 - ugraen je transformator snage 630 kVA . transformator je fiksno kompenziran kondenzatorskom baterijom 45 kVAr. - elija br. 4 - ugraen je transformator snage 1000 kVA. Transformatori br. 1 i br. 3 rade u paraleli i napajaju kotlovnicu. Mjesto preuzimanja el. energije je na 10 kV. Mjerna elija sadri strujne transformatore prijenosnog omjera 20/5 A i naponske transformatore 10000/100 V (k = 400). Mjerna garnitura za hotel sadri trosistemsko brojilo tip IskraEMECO MT831. Prema elektroenergetskoj suglasnosti zakupljena snaga iznosi 150 kW. 2.1.2 TS 10/0,4 kV - gospodarski centar TS sadri jednu trafo-eliju u koju je ugraen transformator snage 1000 kVA. Transformator je fiksno kompenziran kondenzatorskom baterijom 55 kVAr. Mjerna elija sadri strujne transformatore prijenosnog omjera 30/5 A i naponske transformatore 10000/100 V (k = 600). Mjerna garnitura sadri trosistemsko brojilo tip IskraEMECO MT831. Prema elektroenergetskoj suglasnosti zakupljena snaga iznosi 510 kW. TS slui za napajanje niskonaponskih potroaa u sklopu gospodarskog centra, koji preuzimaju el. energiju na 0,4 kV. 2.1.3 TS 10/0,4 kV - Plakir Hotel je trenutno u rekonstrukciji koja je obuhvatila i dislokaciju postojee TS. Prije rekonstrukcije TS je sadravala jednu eliju s transformatorom snage 1000 kVA.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
4 8
2.1
HOTEL
POTROACI
TS GOSP. CENTAR
TS PLAKIR
HOTEL
TS KOTLOVNICA
RASKLOPITE
TRG. CENTAR
TS ARGOSY
Slika 2.1.2.
TRG. CENTAR
TS PRESIDENT
= sustav SNOP
TS TIRENA
GRO MINCETA
L ET OH
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
5 8
2.1
2.1.4 TS 10/0,4 kV - President TS sadri jednu trafo-eliju u koju je ugraen transformator snage 1000 kVA. Transformator je fiksno kompenziran kondenzatorskom baterijom 55 kVAr. Mjesto preuzimanja el. energije je na 10 kV. Mjerna elija sadri strujne transformatore prijenosnog omjera 30/5 A i naponske transformatore 10000/100 V (k = 600). Mjerna garnitura sadri trosistemsko brojilo tip IskraEMECO MT831. Prema elektroenergetskoj suglasnosti zakupljena snaga iznosi 550 kW.
TS PRESIDENT
30/5 A
SNOP President
1000 kVA
55 kVAr
450 kVAr
CHILLER 133 kW
CHILLER 133 kW
CHILLER 23 kW
HOTEL NEPTUN
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
6 8
2.1
2.1.5 TS 10/0,4 kV - Argosy TS sadri dvije trafo-elije: U eliji br. 1 ugraen je transformator snage 630 kVA i slui je za napajanje trgovakog centra Argosy. Transformator je fiksno kompenziran kondenzatorskom baterijom 50 kVAr. Mjerna elija za trafo 1 sadri strujne transformatore prijenosnog omjera 20/5 A i naponske transformatore 10000/100 V (k = 400). Mjesto preuzimanja el. energije je na 10 kV. Mjerna garnitura za hotel sadri trosistemsko brojilo tip IskraEMECO MT831. Prema elektroenergetskoj suglasnosti zakupljena snaga iznosi 180 kW. U eliji br. 2 ugraen je transformator snage 1000 kVA i slui za napajanje hotela Argosy. Transformator je fiksno kompenziran kondenzatorskom baterijom 50 kVAr. Mjerna elija za trafo 2 sadri strujne transformatore prijenosnog omjera 30/5 A i naponske transformatore 10000/100 V (k = 600). Mjesto preuzimanja el. energije je na 10 kV. Mjerna garnitura za hotel sadri trosistemsko brojilo tip IskraEMECO MT831. Prema elektroenergetskoj suglasnosti zakupljena snaga iznosi 360 kW.
TS ARGOSY
20/5 A 30/5 A
SNOP Argosy
630 kVA
1000 kVA
50 kVAr
50 kVAr
100 kVAr
360 kVAr
CHILLER 125 kW
CHILLER 125 kW
TRG. CENTAR
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
7 8
2.1
2.1.6 TS 10/0,4 kV - Tirena TS sadri dvije trafo-elije: U eliji br. 1 ugraen je transformator snage 630 kVA i slui je za napajanje trgovakog centra Tirena. Transformator je fiksno kompenziran kondenzatorskom baterijom 50 kVAr. Mjerna elija za trafo 1 sadri strujne transformatore prijenosnog omjera 20/5 A i naponske transformatore 10000/100 V (k = 400). Mjesto preuzimanja el. energije je na 10 kV. Mjerna garnitura za hotel sadri trosistemsko brojilo tip IskraEMECO MT831. Prema elektroenergetskoj suglasnosti zakupljena snaga iznosi 470 kW. U eliji br. 2 ugraen je transformator snage 1000 kVA i slui za napajanje hotela Argosy. Transformator je fiksno kompenziran kondenzatorskom baterijom 50 kVAr. Mjerna elija za trafo 2 sadri strujne transformatore prijenosnog omjera 30/5 A i naponske transformatore 10000/100 V (k = 600). Mjesto preuzimanja el. energije je na 10 kV. Mjerna garnitura za hotel sadri trosistemsko brojilo tip IskraEMECO MT831. Prema elektroenergetskoj suglasnosti zakupljena snaga iznosi 360 kW.
TS TIRENA
20/5 A 30/5 A
SNOP Tirena
630 kVA
1000 kVA
5o kVAr
40 kVAr
450 kVAr
150 kVAr
SNOP Minceta
800/5 A
CHILLER 125 kW
CHILLER 132 kW
CHILLER 132 kW
CHILLER 132 kW
TRG. CENTAR
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
8 8
2.1
S obzirom da se rashladni agregati za hotel Tirena (125 + 132 kW) i hotel Mineta (2 x 132 kW) napajaju iz niskonaponskih sabirnica transformatora 1, koji je predvien za napajanje trgovakog centra, potronja rashladnih agregata mjeri se posebnim kontrolnim brojilima ugraenim u TS Tirena: 1. Brojilo: T31 CT 2. Brojilo: MT300 3. Brojilo: MT300 agregati CARRIER 125 kW + CIAT 132 kW agregat CIAT 132 kW agregat CIAT 132 kW ST: 600/5 A ST: 300/5 A ST: 300/5 A
2.1.7 GRO 0,4 kV - Mineta Glavni razvodni ormar GRO hotela Mineta napaja se iz 0,4 kV razvoda u sklopu TS Tirena preko kabelskog dovoda 2x4x120 mm2 Cu. Kontrolna mjerna garnitura nalazi se u sklopu GRO i sadri strujne transformatore 800/5 A. U GRO su ugraena kontrolna brojila tip: T31 CTP za djelatnu snagu s impulsnim izlazom 2400 imp/kWh te brojilo jalove snage tip: T31 CTRP.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 6
2.2
2.2
SADRAJ
2.2 SUSTAV ZA NADZOR OPTEREENJA - SNOP........................................................ 2 2.2.1 SNOP suelje ....................................................................................................... 2 2.2.2 SNOP konfiguracija .............................................................................................. 2 2.2.3 Aplikacija SNOP ................................................................................................... 5 2.2.3.1 Osnovni prikaz .............................................................................................. 5
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 6
2.2
2.2
Postojei sustav za nadzor optereenja - SNOP instaliran je u objektima: hotel President hotel Argosy hotel Tirena hotel Mineta.
Sustav SNOP sastoji se od suelja prema mjernoj garnituri elektrinog brojila s impulsnim izlazom, PLC ureaja te PC raunala. 2.2.1 SNOP suelje Suelja i PLC ureaji ugraeni su u plastine ormarie (Slika 2.2.1) koji su instalirani u transformatorskim stanicama navedenih objekata. Shemu spajanja SNOP suelja s mjernom garniturom prikazuje Slika 2.2.2.
PLC ureaji povezani su sa pripadnim PC raunalima putem serijskog komunikacijskog kanala (RS232). 2.2.2 SNOP konfiguracija Pojedina PC raunala sustava SNOP umreena su i povezana na centralno nadzorno raunalo upravnoj zgradi tehnike slube (centar nadzora) kao to prikazuje Slika 2.2.3.
FER
MJERNA GARNITURA
D31ATRP2
3X100V, 5A,kl.<3
R2 IA IR NAP R1
D31ATP-73-M42
100V, 50 Hz
TKM71-NP2H
SNOP (sucelje)
T1/2
T3
mk
MR
1 2 3
4 5 6
7 8 9 1 2 3 4 5 6 20 21 1 2 3 4 5 6
13
14
15
16
18
19
20
21
7 8 9
7 8
T2
11 6 3 11 6 3
T3
L1 N Pe 0 1 2 3 4 5 6 7 24 0V
SUCOnet K1 10 9 10 9 1 2
PS4-111-DR1
A B C E
1 2 3
4 5 6
7 8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
SUCOnet
6A
6A
PC
L1
Knjiga br.:
L2
Projekt br:
L3
1
Sekcija:
12270-2009
Slika 2.2.2.
2.2
List:
Listova:
TS PRESIDENT
KOMBI BROJILO SNOP SUELJE KOMBI BROJILO SNOP SUELJE BROJILO SNOP SUELJE
TS ARGOSY
TS TIRENA
GRO MINETA
FER
KOMBI BROJILO
SNOP SUELJE
RS 232
RS 232
RS 232
LAN (TCP/IP)
CENTAR NADZORA
RS 232
Knjiga br.:
Projekt br:
12270-2009
Sekcija:
2.2
List:
Listova:
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
5 6
2.2
2.2.3 Aplikacija SNOP Programska aplikacija SNOP izraena je na MS Windows platformi. Osnovna aplikacija SNOP (server) instalirana je na svakom SNOP PC raunalu u nadziranim objektima. U centru daljinskog nadzora instalirana je aplikacija SNOP (client) pomou koje se nadzorno PC raunalo (master) spaja na pojedina SNOP PC raunala i omoguuje istu funkcionalnost aplikacije SNOP kao i na lokalnom PC raunalu u nadziranom objektu. 2.2.3.1 Osnovni prikaz Nakon pokretanja aplikacije SNOP (pokree se automatski nakon ukljuenja PC raunala) na monitoru se pojavljuje osnovni prikaz (Slika 2.2.4).
Osnovni prikaz sadri sve relevantne podatke o potronji predmetnog objekta u numerikom i grafikom obliku: aktivnu tarifu trenutnu djelatnu snagu trenutnu jalovu snagu trenutni faktor snage (cos ) (1 ili 2) (kW) (kVAr) (01)
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
6 6
2.2
ostvareno vrno optereenje P15 (kW) podeeno granino optereenje Plimit (kW) datum i vrijeme (dd-mm-gg),(hh:mm:ss) graf trenutne djelatne snage (zeleno) graf trenutne jalove snage (uto) liniju graninog podeenja (crveno) bar-dijagram trenutnog 15' optereenja (P) bar-dijagram maksimalnog 15' optereenja (M) bar-dijagram graninog 15' optereenja (L) bar-dijagram dnevne raspodjele15' optereenja.
Na dnu prikaza nalazi se prozor u kojem se prikazuju poruke/alarmi, koji se automatski zapisuju u datoteku dogaaja. Ukoliko se pojavi alarm, sustav SNOP daje svjetlosni (crveni ALARM LED) zvuni signal (beep) sve dok operater ne potvrdi alarm pritiskom na tipku F1 (tikovnica) ili miem na tipku "POTVRDA" na ekranskom prikazu. U gornjem dijelu osnovnog osnovno prikaza nalaze se glavni izbornik: POTRONJA LISTE KOPIRANJE BROJILO INICIJALIZACIJA
Pod svakom stavkom glavnog izbornika nalaze se tzv. padajui podizbornici. POTRONJA dnevna mjesena
Odabirom podstavke "dnevna" na ekranu se pojavljuje prozor s imenima datoteka u kojima su pohranjeni podatci o dnevnim dijagramima optereenja (Slika 2.2.5). Imena datoteka imaju format: "dd_mm.dat" gdje je dd = dan, mm = mjesec u tekuoj kalendarskoj godini
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
7 6
2.2
Odabir traene datoteke obavlja se miem i aktiviranjem tipke "Select", a nakon toga na ekranu se prikazuje izvjee s dnevnim dijagramom za odabrani dan (Slika 2.2.6).
Ukoliko se odabere "mjesena" potronja, pojavljuje se padajui izbornik za odabir mjeseca u tekuoj godini kao to prikazuje Slika 2.2.7.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
8 6
2.2
Nakon odabira mjeseca (omogueni su samo protekli mjeseci) na ekranu se prikazuje izvjee mjesene potronje kao to prikazuje Slika 2.2.8.
Dnevna odnosno mjesena izvjea mogu se otisnuti na odgovarajuem printeru aktiviranjem tipke "PRINT" na aktivnom prikazu. LISTE dananja prethodne
Odabirom podstavke "dananja" na ekranu se pojavljuje lista dogaaja za tekui dan kao to prikazuje Slika 2.2.9. Odabirom postavke "prethodne" na ekranu se pojavljuje prozor s imenima datoteka u kojima su liste dogaaja/alarma (Slika 2.2.10). Imena datoteka imaju format: "dd_mm.lst" gdje je dd = dan, mm = mjesec u tekuoj kalendarskoj godini. Traena lista se odabire miem i otvara aktiviranjem tipke "Selekt" na ekranu.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
9 6
2.2
Dananja odnosno prethodno odabrana lista dogaaja moe se otisnuti na odgovarajuem printeru aktiviranjem tipke "PRINT" na aktivnom prikazu.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
10 6
2.2
KOPIRANJE
potronja dogaaji
Izbornik "KOPIRANJE" predvien je za kopiranje datoteka s podatcima potronje odnosno listama dogaaja koje su pohranjene na lokalnom disku PC raunala na druge medije. Odabirom stavke "potronja" odnosno "dogaaji" na ekranu se prikazuje prozor s imenima datoteka kao to prikazuje Slika 2.2.5. odnosno Slika 2.2.10. BROJILO impulsi
Izbrornik "BROJILO" predvien je za provjeru i oitanje stanja elektronikih brojila koja su opremljena komunikacijskim kanalom. Ukoliko se koriste brojila s impulsnim izlazom, aktivna je samo opcija "impulsi". Aktiviranjem podizbornika na ekranu se prikazuje stanje impulsa iz prikljuenih brojila u tekuem 15minutnom intervalu (Slika 2.2.12).
INICIJALIZACIJA
Odabirom stavke "ponitenje maksigrafa" obavlja se brisanje spremljene vrijednosti maksimalnog 15-minutnog optereenja iz prethodnog obraunskog razdoblja. Da se sprijei sluajno ponitenje, akciju ponitavanja potrebno je dodatno potvrditi na panelu upozorenja koji se pojavljuje na ekranu (Slika 2.2.13).
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
11 6
2.2
Parametriranje sustava SNOP sukladno prikljuenim elektrinim brojilima i mjernim transformatorima obavlja se aktiviranjem stavke "parametri sustava" te odabirom odgovarajuih parametara u podizborniku "INICIJALIZACIJA SUSTAVA" koji se prikazuje na ekranu (Slika 2.2.14).
- odabir serijskog komunikacijskog porta - naponska razina (0.4, 10, 20, 35 kV) - odabir prijenosnog omjera strujnih transformatora - koeficijent = izraunava se automatski iz odabranih parametara - nazivna snaga = izraunava se automatski iz odabranih parametara - konstanta brojila (imp/kWh) - Pmax (dijagram) = parametriranje ordinate na dijagramu - limit snage = inicijalna vrijednost ogranienja snage - vrno optereenje = zraunava se automatski iz odabranih parametara
Brojilo: Prikaz:
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 6
2.3
2.3
SADRAJ
2.3 ANALIZA POTRONJE ELEKTRINE ENERGIJE .................................................... 2 2.3.1 Vrne snage ......................................................................................................... 3 2.3.2 Zakljuak .............................................................................................................. 6
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 6
2.3
2.3
Analiza potronje el.energije nainjena je temeljem ispostavljenih rauna za elektrinu energiju te podataka iz sustava SNOP za 2008. godinu. Analizom su obuhvaena vrna optereenja tj. angairana snaga u doba vie tarife na slijedeim mjernim mjestima: Naziv 1. 2. 3. 4. 5. 6. 7. 8. 9. Centralna kotlovnica Gospodarski centar Hotel Plakir Hotel Tirena Trgovaki centar Tirena Hotel Argosy Trgovaki centar Argosy Hotel President Dubrovnik Babin kuk d.d. Kategorija SN (10 kV) SN (10 kV) SN (10 kV) SN (10 kV) SN (10 kV) SN (10 kV) SN (10 kV) SN (10 kV) NN (0,4 kV) Model bijeli bijeli bijeli bijeli bijeli bijeli bijeli bijeli crveni Nadzor SNOP SNOP SNOP -
S obzirom da se prema vaeem Tarifnom sustavu prekomjerna angairana snaga obraunava u dvostrukom iznosu to izaziva dodatne trokove, implementiranjem sustava SNOP rado ogranienja vrnog optereenja mogu se ti trokovi izbjei. Budui da je svaki potroa obvezan sklopiti s isporuiteljem el.energije ugovor o isporuci u kojem se za slijedeu kalendarsku godinu unaprijed ugovara angairana snaga za svaki mjesec, o dobroj procjeni angairane snage za svako mjerno mjesto zavise trokovi za angairanu snagu, koji u sluaju loe procjene mogu biti vrlo veliki. Zbog toga se analizom podataka prikupljenih sustavom SNOP mogu dobiti relevantni pokazatelji za dobru procjenu ugovaranja angairanih snaga za slijedeu kalendarsku godinu. Aktiviranjem opcije automatskog iskljuivanja troila nieg prioriteta u periodima vrnog optereenja sustav SNOP moe odravati angairanu snagu u granicama 85% do105% ugovorene snage ime se izbjegava plaanje penala. Dodatne utede mogu se ostvariti objedinjavanjem obrauna vrne snage za sva mjerna mjesta istog potroaa (jedno pravno lice) unutar istog kompleksa koritenjem elektronikih brojila elektrine energije koja imaju sposobnost registriranja dnevnog profila potronje, tako da se obradom oitanih podataka obraunava stvarna angairanja snaga, a ne snaga dobivena kao zbroj pojedinanih angairanih snaga. Analiza podataka pokazuju da je stvarna angairana snaga u pravilu do 20% nia od one koja se obraunava zbrajanjem pojedinanih angairanih snaga. Naravno da takav nain obrauna zahtijeva ugradnju posebnih elektronikih brojila na svim mjernim mjestima koja se uzimaju u obraun.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
3 6
2.3
400
GOSPODARSKI CENTAR
Ostvareno 1000 900 800 700 600 kw 500 400 300 200 100 0 1 2 3 4 5 mjesec 6 7 8 9 Ugovoreno Obra unato
Hotel PLAKIR
Ostvareno 100 90 80 70 60 kW 50 40 30 20 10 0 1 2 3 4 5 mjesec 6 7 8 9 Ugovoreno Obra unato
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
4 6
2.3
Hotel TIRENA
Ostvareno 1000 900 800 700 600 kW 500 400 300 200 100 0 1 2 3 4 5 mjesec 6 7 8 9 Ugovoreno Obra unato
Hotel ARGOSY
Ostvareno 1000 900 800 700 600 kW 500 400 300 200 100 0 1 2 3 4 5 mjesec 6 7 8 9 Ugovoreno Obra unato
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
5 6
2.3
400
Hotel PRESIDENT
Ostvareno 1000 900 800 700 600 kW 500 400 300 200 100 0 1 2 3 4 5 mjesec 6 7 8 9 Ugovoreno Obra unato
Prekomjerni trokovi za angairanu snagu: Mjerno mjesto 1. 2. 3. 4. 5. 6. 7. 8. Centralna kotlovnica Gospodarski centar Hotel Plakir Hotel Tirena Trgovaki centar Tirena Hotel Argosy Trgovaki centar Argosy Hotel President UKUPNO: troak (kn) 17.168,84 0,00* 4.630,60 21.300,76 22.654,32 11.612,12 8.762,52 24.934,00 111.063,16
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
6 6
2.3
Simulacija trokova za angairanu snagu u sluaju obrauna stvarne snage u odnosu na obraun zbroja pojedinanih snaga nainjena je za mjerna mjesta: - hotel Argosy - hotel Tirena - hotel President, jer je na tim lokacijama ograen sustav SNOP iji su podatci koriteni za analizu.
Argosy & Tirena & President
Zbroj snaga 1600 1400 1200 1000 kW 800 600 400 200 0 1 2 3 4 5 mjesec 6 7 8 9 Stvarna snaga
Prosjeni omjer stvarne i zbirne snage: Razlika trokova za angairanu snagu: 2.3.2 Zakljuak
0,83 88.765,04 kn
Proirenjem sustava SNOP na dodatna mjerna mjesta: - Centralna kotlovnica - Hotel Plakir - Rashladni agregati Tirena - Rashladni agregati Mineta te aktiviranjem opcije automatskog iskljuenja troila prema zdanom prioritetu predvia se uteda na trokovima za prekomjernu angairanu snagu oko 111.000 kn Ugradnjom elektronikih brojila na navedena mjerna mjesta i prelaskom na obraun stvarne angairane snage utedilo bi se dodatnih 89.000 kn, to daje ukupnu godinju utedu od oko 200.000 kn. Analizom je obuhvaen period sijeanj-rujan 2008. to znai da bi kroz cijelu godinu utede bile i vee.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 3
2.4
2.4 2.4
SADRAJ
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 3
2.4
2.4
PROJEKTNI PROGRAM
Tehniko rjeenje i opis : Nadzor i regulacija jalove snage Tehniko rjeenje i opis : Automatski alarm prekoraenja zadane snage tekui obraunski period Tehniko rjeenje : Automatski alarm prekoraenja planova snage Dojava alarma na GSM - automatski alarmni centar (Primjerice; prekoraenje snage, cos-fi<0,95, ispad komunikacije, prekomjerna potronja, prevelik broj redukcija, kanjenje signala tarife, kanjenje signala obraunskog perioda itd.) 8. Funkcionalnu specifikaciju i opis programske opreme SNOP aplikacije na nivou a) poslovnog objekta b) cijelog kompleksa Babin kuk d.d. c) nadzornog centra koja omoguuje grafiki i tabelarni prikaz trenutnog stanja i stanja van realnog vremena sa vremenskom bazom od 15min, 1 sat, 30 dana, za slijede e veliine: 1. Potronje djelatne el.energije -kWh 2. Potronje jalove el.energije -kVArh 3. Angairane djelatne el.snage -kW 4. Maksimalne postignute djelatne el.snage dana, kalendarskog mjeseca, obraunskog perioda 5. Angairane jalove el.snage -kVAr 6. Faktor snage - cos-fi 7. Potronje vode (m3/h) i (goriva l/h) , maksimalnog i minimalnog protoka (alarmi u sluaju prekoraenja), te takoer automatski omoguava slijedee funkcije: 8. Grafiki prikaz broja i mjesta redukcija u 15-min intervalu 9. Automatske korekcije zadane djelatne el.snage za sljedei nastupajui mjesec 10. Automatski prijedlog godinjih planova snage kW za svaki poslovni objekt pojedinano 11. Automatski prijedlog godinjih planova snage kW za cijeli Babin Kuk d.d. 12. Izraun trenutnog mjesenog rauna za el.energiju za svako pojedino mjerno mjesto
4. 5. 6. 7.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
3 3
2.4
1. Eksport procesnih podataka iz baze podataka u EXEL formatu za dodatne obrade korisnika 2. Programska oprema za buck-up i restore baze podataka 3. Logiranje na nadzorni centar remote-support servisnog i autoriziranog deurnog kadra za promjenu parametara sustava na svim nivoima iz nadzornog centra 4. Servisni programi i ostala programska oprema za odravanje i voenje baze podataka
11. Specifikaciju i opis komunikacijske opreme SNOP sustava 12. Specifikaciju i trokovnik potrebnih instalacija :
za prihvat mjerenja sa mjernih garnitura do upravljanih potroaa za 6 hotela
13. Specifikaciju i trokovnik potrebnih preinaka na mjernim garniturama HEPa 14. Trokovnik kompletnog SNOP sustava sa svim potrebnim tehnikim detaljima za nuenje ukljuujui:
sklopovsku opremu i mikrokontrolera raunalnu opremu programsku opremu komunikaciona oprema sklopnu opremu i relejnu opremu instalacije,
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List:
1 1
3.0
Listova:
3.
3.1 3.2 3.3 3.4 3.5
TEHNIKI OPIS
SKLOPOVSKA NADOGRADNJA SUSTAV SNOP I FAZA SKLOPOVSKA NADOGRADNJA SUSTAV SNOP II FAZA PROGRAMSKA NADOGRADNJA SUSTAVA SNOP I FAZA PROGRAMSKA NADOGRADNJA SUSTAVA SNOP II FAZA ZBIRNO MJERENJE POTRONJE ELEKTRINE ENERGIJE
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 34
3.1
3.1
SADRAJ
3.1 SKLOPOVSKA NADOGRADNJA SUSTAVA SNOP I FAZA .................................... 2 3.1.1 Osnovna konfiguracija .......................................................................................... 2 3.1.2 Izlazni modul ........................................................................................................ 2 3.1.3 Periferija za rashladne agregate........................................................................... 7 3.1.4 Proirena konfiguracija sustava SNOP .............................................................. 10 3.1.4.1 Konfiguracija: Hotel PRESIDENT ................................................................... 11 3.1.4.2 Konfiguracija: Hotel ARGOSY ........................................................................ 13 3.1.4.3 Konfiguracija: Hotel TIRENA........................................................................... 15 3.1.4.4 Konfiguracija: Hotel MINETA........................................................................ 17 3.1.4.5 Konfiguracija: Hotel PLAKIR ........................................................................... 19 3.1.5 Dispozicija opreme ............................................................................................. 22 3.1.5.1 Dispozicija SNOP: Hotel PRESIDENT............................................................ 23 3.1.5.2 Dispozicija SNOP: Hotel ARGOSY ................................................................. 26 3.1.5.3 Dispozicija SNOP: Hotel TIRENA ................................................................... 28 3.1.5.4 Dispozicija SNOP: Hotel MINETA ................................................................ 30 3.1.5.5 Dispozicija SNOP: Hotel PLAKIR ................................................................... 34
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 34
3.1
3.1 3.1.1
Sustav SNOP je izveden u modularnoj sklopovskoj konfiguraciji. Osnovnu konfiguraciju ini PC raunalo komunikacijski povezano s PLC jedinicom koja je sastavni sklop suelja prema mjernoj garnituri elektrinog brojila. Osnovna konfiguracija namijenjena je praenju potronje elektrine energije jednog mjernog mjesta opremljenog impulsnim brojilom elektrine energije. Da bi sustav SNOP automatski upravljao odabranim troilima radi ogranienja vrnog optereenja prema unaprijed zadanom limitu, potrebno je nadograditi osnovnu konfiguraciju s izlaznim modulom koji sadri potreban broj upravljakih kanala. 3.1.2 Izlazni modul
Izlazni modul sustava SNOP sadri vie upravljakih kanala. Blok shema jednog upravljakog kanala prikazuje Slika 3.1.1.
L1 L2 L3
CT sklopnik
AI 0-20mA
PLC spojka
DO 24 Vdc
relej 24 V
TROILO
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
3 34
3.1
Izlazni modul predstavlja inteligentnu periferiju osnovne PLC jedinice. Modul komunicira s PLC jedinicom putem PLC spojke koja se prikljuuje na lokalnu Ethernet mreu (LAN). Na PLC spojku se dodaje odgovarajui broj mjernih (analogni ulaz) odnosno izlaznih (digitalni) kanala tako da se formira cjelina od 8 odnosno 16 identinih upravljakih kanala. Jedan upravljaki kanal sastoji se od mjernog i prekidnog elementa koji se ugrauju u odabrani strujni krug. Kao mjerni element koristi se provodni strujni transformator 50A/20mA koji ima funkciju mjerenja struje u jednoj fazi trofaznog strujnog kruga. Mjerni signal strujnog transformatora prikljuen je na pripadni analogni ulaz izlaznog modula. Temeljem mjerenja struje sustav SNOP izraunava trenutnu snagu troila prikljueno na predmetni strujni krug. Prekidni element izveden je pomou trofaznog sklopnika 32 A kojim upravlja pomoni relej 24 V. Pomoni relej spojen je na digitalni izlaz pripadnog upravljakog kanala. Prekidnim elementom omogueno je iskljuenje troila u odabranom strujnom krugu. Osim upravljakih kanala izlazni modul sadri besprekidni izvor napajanja 230Vac/24Vdc te ulazno izlazne redne stezaljke. S obzirom da u postojeim razvodnom ormarima (RO) u objektima kompleksa Babin kuk nema mjesta za ugradnju elemenata upravljakih kanala sustava SNOP, ti se element moraju smjestiti izvan RO te ih posebnim vodovima ukljuiti u odabrane strujne krugove kao to prikazuje Slika 3.1.2. Svi elementi izlaznog modula ugrauju se u zidni ormari dimenzija 800x1000x260 mm. Raspored elemenata u ormariu izlaznog modula sa 16 upravljakih kanala prikazuje Slika 3.1.3. (za manji broj izvoda koristi se konfiguracija od 8 upravljakih kanala).
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
4 34
3.1
Postojeci RO
SNOP kanal 1
SNOP kanal 2
Na vratima ormaria nalaze se signalne sijalice (16 kom) koje pokazuju uklopno stanje pojedinog strujnog kruga koji je pod kontrolom sustava SNOP. U sluaju potrebe mogue je blokirati djelovanje sustava SNOP pomou izborne preklopke BLOK-AKTIV postavljene na vrata ormaria. U poloaju "AKTIV" sustav SNOP djeluje na iskljuenje pojedinih strujnih krugova sukladno algoritmu za ogranienje vrnog optereenja. U poloaju "BLOK" forsira se ukljuenje svih sklopnika upravljakih kanala tako da su pripadna troila izdvojena iz sustava upravljanja vrnim optereenjem. Izgled prednje ploe (vrata) ormaria izlaznog modula prikazuje Slika 3.1.4. Na lokacijama gdje sustav SNOP upravlja s najvie 8 strujnih krugova, ormari izlaznog modula oprema se s elementima za samo 8 upravljakih kanala.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
5 34
3.1
IZLAZNI RELEJI
CT 9
CT 10
CT 11
CT 12
CT 13
CT 14
CT 15
CT 16
CT 1
CT 2
CT 3
CT 4
CT 5
CT 6
CT 7
CT 8
UL IZL UL IZL UL IZL UL IZL UL IZL UL IZL UL IZL UL IZL Kanal 1 Kanal 2 Kanal 3 Kanal 4 Kanal 5 Kanal 6 Kanal 7 Kanal 8
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
6 34
3.1
signalne sijalice
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Blok Aktiv
izborna preklopka
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
7 34
3.1
3.1.3
Rashladni agregati pojedinih hotela u kompleksu Babin kuk predstavljaju znaajne potroae koji se ukljuuju u sustav upravljanja vrnim optereenjem (Slika 3.1.7). S obzirom da rashladni agregati posjeduju vlastite upravljake jedinice koje su ugraene u elektro ormare na samim rashladnim jedinicama, optereenjem agregata ne moe se upravljati iz napojnih razvodnih ormara u pripadnim transformatorskim stanicama (TS), jer ne postoje odgovarajui signalni kabeli izmeu TS i rashladnih agregata, koji bi se iskoristili za upravljanje agregatima. Veza izmeu upravljake jedinice pojedinog rashladnog agregata i izlaznog modula pripadnog podsustava SNOP ostvaruje se pomou beinih ulazno/izlaznih modula (Wireless IO) kao to prikazuje Slika 3.1.5.
RASHLADNI AGREGAT
B
RUCNE KOMANDE
1 0
1 1
1 2
1 3
1 4
1 5
1 6
Blok
Aktiv
INTERNO SUCELJE
UPRAVLJACKI SKLOP
KOMPRESORI
NAPOMENA: Ovim projektom predviena je oprema za upravljanje rashladnim agregatima pomou beinih ulazno/izlaznih jedinica (Wireless IO) kao to prikazuje Slika 3.1.6: - 2 izlazna digitalna signala - 2 ulazna digitalna signala - 1 izlazni analogni signal - 1 ulazni analogni signal po agregatu. Detaljne sheme spajanja isporuit e tvrtka koja odrava rashladne agregate. - komande - status - postavna vrijednost - trenutno optereenje
FER
Unska 3, 1000 Zagreb
+24 V
+24 V
WIRELES STATION A
WIRELES STATION B
SNOP
L 8K 842
DO 1 DO 2 DO 3 DO 4
RASHLADNI AGREGAT
0V
0V
Knjiga br.:
Projekt br:
1
Sekcija:
12270-2009
3.1
List:
Listova:
34
FER
Unska 3, 1000 Zagreb
Hotel ARGOSY
GR WiFi CHILLER GR
Hotel MINCETA
GR WiFi CHILLER
GR
Hotel TIRENA
WiFi CHILLER
Hotel PRESIDENT
WiFi
CENTAR NADZORA
CHILLER
Hotel PLAKIR
Knjiga br.:
Projekt br:
1
Sekcija:
12270-2009
3.1
List:
Listova:
34
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
10 34
3.1
3.1.4
S obzirom da PLC spojka u uzlaznom modulu sustava SNOP posjeduje dovoljno procesorske moi da preuzme nadzor nad upravljakim kanalima temeljem programiranog algoritma, u proirenoj konfiguraciji nije vie potrebno PC raunalo, odnosno njegova se funkcija svodi samo na korisniko suelje za lokalni nadzor. Broj upravljakih kanala za proirenje sustava SNOP na pojedinim razvodima odreuje se prema broju odvoda s prikljunom snagom veom od 5 kW.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
11 34
3.1
3.1.4.1 Konfiguracija: Hotel PRESIDENT U sustav SNOP ukljueni su rashladni agregati te odabrani odvodi u razvodu "Kuhinja" i "Wellnes" prema Tablici 1 i Tablici 2. Rashladni agregati: 2 identina agregata Tip: WRAN-R 1604/LN Proizvoa: CLIMAVENETO El. napajanje: 380V/3/50Hz+T Snaga: 183,6 kW Struja: 341,6 A
Odvodi: Tablica 1
Izlaz Kanal 1 Kanal 2 Kanal 3 Kanal 4 Kanal 5 Kanal 6 Kanal 7 Kanal 8 Kanal 9 Kanal 10 Kanal 11 Kanal 12 Kanal 13 Kanal 14 Kanal 15 Kanal 16 POLJE 1 Razvod RK RK RK RK RK RK RK RK RK RK RK RK RK RK RK RK RK Krug 1 2 3 4 5 6 17 200 201 202 203 204 205 206 207 208 16 Snaga kW 24,0 20,0 20,0 16,0 12,0 9,0 18,0 6,0 6,0 6,0 6,0 6,0 6,0 6,0 6,0 6,0 173,0 Struja A 34,7 28,9 28,9 23,1 17,3 13,0 26,0 8,7 8,7 8,7 8,7 8,7 8,7 8,7 8,7 8,7 Opis STEAM KETTLE BLAST CHILLER GRIDLE POT WASH MACHINE FRYER ELECTRIC STOVE EL. ZAVJESA FRITEZA FRITEZA FRITEZA FRITEZA FRITEZA FRITEZA FRITEZA FRITEZA FRITEZA
Tablica 2
Izlaz Kanal 1 Kanal 2 Kanal 3 Kanal 4 Kanal 5 Kanal 6 Kanal 7 Kanal 8 POLJE 2 Razvod WELLNES WELLNES WELLNES Rez Rez Rez Rez Rez WELLNES Krug 11 13 42 8 Snaga kW 10,7 12,0 9,0 Struja A 15,5 17,3 13,0 Opis FINSKA SAUNA PARNA KUPELJ VANJSKI BAZEN
31,7
FER
Unska 3, 1000 Zagreb
A B
TS PRESIDENT
HOTEL PRESIDENT
KOMBI BROJILO
SNOP 16
SNOP SUCELJE
SNOP 8
RASHLADNI AGREGATI
1
1 0 1 1 1 2 1 3 1 4 1 5 1 6
Blok
Kuhinja
Wellnes
Projekt br:
LAN (TCP/IP)
1
Sekcija:
12270-2009
3.1
List:
Listova:
34
12
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
13 34
3.1
3.1.4.2 Konfiguracija: Hotel ARGOSY U sustav SNOP ukljueni su rashladni agregati te odabrani odvodi u razvodu "Restoran" prema Tablici 1. Rashladni agregati: 2 identina agregata Tip: WRAN 2120 Proizvoa: CLIVET El. napajanje: 400/3/50 Snaga: 125 kW Struja: 223,6 A
Odvodi: Tablica 1
Izlaz Kanal 1 Kanal 2 Kanal 3 Kanal 4 Kanal 5 Kanal 6 Kanal 7 Kanal 8 POLJE 1 Razvod RO-rest RO-rest RO-rest RO-rest RO-rest Rez Rez Rez RO-rest Krug 113 125 161 168 171 8 Snaga kW 12,0 7,0 7,0 16,0 7,0 Struja A 17,3 10,1 10,1 23,1 10,1 Opis IZVOD IZVOD IZVOD IZVOD IZVOD
49,0
FER
Unska 3, 1000 Zagreb
A B
TS ARGOSY
SNOP 8
HOTEL ARGOSY
KOMBI BROJILO
SNOP SUCELJE
RASHLADNI AGREGATI
Blok Aktiv
Restoran
Projekt br:
LAN (TCP/IP)
12270-2009
Sekcija:
3.1
List:
Listova:
34
14
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
15 34
3.1
3.1.4.3 Konfiguracija: Hotel TIRENA U sustav SNOP ukljueni su rashladni agregati te odabrani odvodi u razvodu "Restoran" prema Tablici 1. Rashladni agregati: 1 Tip: Proizvoa: El. napajanje: Snaga: Struja: 2 Tip: Proizvoa: El. napajanje: Snaga: Struja: Odvodi: Tablica 1
Izlaz Kanal 1 Kanal 2 Kanal 3 Kanal 4 Kanal 5 Kanal 6 Kanal 7 Kanal 8 Kanal 9 Kanal 10 Kanal 11 Kanal 12 Kanal 13 Kanal 14 Kanal 15 Kanal 16 POLJE 1 Razvod RO-rest RO-rest RO-rest RO-rest RO-rest RO-rest RO-rest RO-rest RO-rest RO-rest RO-rest Rez Rez Rez Rez Rez RK Krug Snaga kW 6,0 18,0 5,0 5,0 16,0 7,0 6,0 16,0 8,0 5,0 6,0 Struja A 8,7 26,0 7,2 7,2 23,1 10,1 8,7 23,1 11,6 7,2 8,7 Opis Hot plate-dispenser Bain marie Wok Noodle cooker Hot-ship-steel Griddle Pizza presentation Pizza oven Salad&Antipasti Coffee machine Glasswash
30RH240 1T CARRIER 400-3-50 124,9 kW 209,1 A ILDC 1200Z CIAT 3 50Hz 400V 131,8 kW 247,3 A
16
98,0
FER
Unska 3, 1000 Zagreb
TS TIRENA
HOTEL TIRENA
KOMBI BROJILO
SNOP 16
SNOP SUCELJE
RASHLADNI AGREGATI
1
1 0 1 1 1 2 1 3 1 4 1 5 1 6
Blok Aktiv
Restoran
Projekt br:
LAN (TCP/IP)
1
Sekcija:
12270-2009
3.1
List:
Listova:
34
16
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
17 34
3.1
3.1.4.4 Konfiguracija: Hotel MINETA U sustav SNOP ukljueni su rashladni agregati te odabrani odvodi u razvodu "R1(E200)" i "R2(E300)" prema Tablici 1 i Tablici 2. Rashladni agregati: 2 identina agregata Tip: ILDC 1200Z Proizvoa: CIAT El. napajanje: 3 50Hz 400V Snaga: 131,8 kW Struja: 247,3 A
Odvodi: Tablica 1
Izlaz Kanal 1 Kanal 2 Kanal 3 Kanal 4 Kanal 5 Kanal 6 Kanal 7 Kanal 8 POLJE 1 Razvod R-1. 1/5 R-1. 3/5 R-1. 5/5 Rez Rez Rez Rez Rez R1(E200) Krug 05 1 1 8 Snaga kW 15,0 7,0 16,0 Struja A 21,7 10,1 23,1 Opis dizalica topline FIKSNI PRIKLJUAK FIKSNI PRIKLJUAK
38,0
Tablica 2
Izlaz Kanal 1 Kanal 2 Kanal 3 Kanal 4 Kanal 5 Kanal 6 Kanal 7 Kanal 8 POLJE 2 Razvod R-2. 1/7 R-2. 2/7 Rez Rez Rez Rez Rez Rez R2(E300) Krug 05 3 8 Snaga kW 15,0 9,0 Struja A 21,7 13,0 Opis KLIMATIZACUJA FIKSNI PRIKLJUAK
24,0
FER
Unska 3, 1000 Zagreb
A B
GRO MINCETA
HOTEL MINCETA
BROJILO
SNOP 8 SNOP 8
SNOP SUCELJE
RASHLADNI AGREGATI
1 1 2 3 4 5 6 7 8
Aktiv
R1 - 200 R1-300
Projekt br:
LAN (TCP/IP)
1
Sekcija:
12270-2009
3.1
List:
Listova:
34
18
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
19 34
3.1
3.1.4.5 Konfiguracija: Hotel PLAKIR U sustav SNOP ukljueni su odvodi u razvodima: RO - Glavna kuhinja RO - Kuhinja A la card RO - Satelitska kuhinja RO - Glavni restoran RO - Sauna Odvodi: Tablica 1
SNOP Kanal 1 Kanal 2 Kanal 3 Kanal 4 Kanal 5 Kanal 6 Kanal 7 Kanal 8 POLJE 1 Razvod RO-GL.KUH.-A RO-GL.KUH.-M RO-GL.KUH.-M RO-GL.KUH.-M RO-GL.KUH.-M RO-GL.KUH.-M RO-GL.KUH.-M Rez RO-GL.KUH.-M Krug 107 145 171 172 173 174 175 8 Snaga kW 6,6 6,6 37,0 21,0 11,0 37,0 24,0 143,2 Struja A 9,5 9,5 53,5 30,3 15,9 53,5 34,7 Opis 8.12 E.P 8.12 E.U. 5.16 E.P. 10.7 E.P. 11.3 E.P. 12.3 E.P. 13.1 E.P.
Tablica 2
SNOP Kanal 1 Kanal 2 Kanal 3 Kanal 4 Kanal 5 Kanal 6 Kanal 7 Kanal 8 Kanal 9 Kanal 10 Kanal 11 Kanal 12 Kanal 13 Kanal 14 Kanal 15 Kanal 16 POLJE 2 Razvod RO-KUH.A.L.C.-M RO-KUH.A.L.C.-M RO-KUH.A.L.C.-M RO-KUH.A.L.C.-M RO-KUH.A.L.C.-M RO-KUH.A.L.C.-M RO-KUH.A.L.C.-M RO-KUH.A.L.C.-M RO-KUH.A.L.C.-M RO-KUH.A.L.C.-M Rez Rez Rez Rez Rez Rez RO-KUH.A.L.C.-M Krug 101 102 106 111 112 113 114 117 120 136 16 Snaga kW 5,8 5,0 5,0 23,0 7,0 5,0 5,0 5,0 22,0 6,5 Struja A 8,4 7,2 7,2 33,2 10,1 7,2 7,2 7,2 31,8 9,4 Opis 14.1 E.P. 14.3 E.P. E.U. 16.11 E.P. 16.13 E.P. 16.14 E.P. 16.15 E.P. E.U. 17.4 E.P. 18.10 E.P.
89,3
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
20 34
3.1
Tablica 3
SNOP Kanal 1 Kanal 2 Kanal 3 Kanal 4 Kanal 5 Kanal 6 Kanal 7 Kanal 8 Kanal 9 Kanal 10 Kanal 11 Kanal 12 Kanal 13 Kanal 14 Kanal 15 Kanal 16 POLJE 3 Razvod RO-SAT.KUH.-M RO-SAT.KUH.-M RO-SAT.KUH.-M RO-SAT.KUH.-M RO-SAT.KUH.-M RO-SAT.KUH.-M RO-SAT.KUH.-M RO-SAT.KUH.-M RO-SAT.KUH.-M RO-SAT.KUH.-M Rez Rez Rez Rez Rez Rez RO-SAT.KUH.-M Krug 39 40 42 43 44 45 46 47 48 49 16 Snaga kW 40,0 30,0 6,6 6,6 6,6 6,6 6,6 15,0 15,0 12,0 Struja A 57,8 43,4 9,5 9,5 9,5 9,5 9,5 21,7 21,7 17,3 Opis 25.5.1 E.P. 25.5.2 E.P. 27.16.1 E.U. 27.16.2 E.U. 27.16.3 E.U. 27.16.4 E.U. 27.16.5 E.U. 25.15 E.U. 25.15 E.U. E.P.
145,0
Tablica 4
SNOP Kanal 1 Kanal 2 Kanal 3 Kanal 4 Kanal 5 Kanal 6 Kanal 7 Kanal 8 POLJE 4 Razvod RO-GL.REST.-M RO-GL.REST.-M RO-GL.REST.-M RO-GL.REST.-M RO-GL.REST.-M RO-GL.REST.-M RO-GL.REST.-M RO-GL.REST.-M RO-GL.REST.-M Krug 117 120 125 126 136 137 139 140 8 Snaga kW 16,0 7,5 5,0 5,0 7,5 7,5 5,5 5,5 54,0 Struja A 23,1 10,8 7,2 7,2 10,8 10,8 7,9 7,9 Opis 23.6 E.P. 23.9 E.P. 23.13 E.P. 23.14 E.P. 23.22 E.P. 23.22 E.P. 23.25 E.P. 23.25 E.P.
Tablica 5
SNOP Kanal 1 Kanal 2 Kanal 3 Kanal 4 Kanal 5 Kanal 6 Kanal 7 Kanal 8 POLJE 5 Razvod RO-SAUNA-M RO-SAUNA-M RO-SAUNA-M RO-SAUNA-M RO-SAUNA-M RO-SAUNA-M RO-SAUNA-M Rez RO-SAUNA-M Krug 101 102 103 104 105 106 108 8 Snaga kW 8,0 10,5 10,5 10,5 10,5 13,5 9,0 72,5 Struja A 11,6 15,2 15,2 15,2 15,2 19,5 13,0 Opis EC 1.0 E.P. EC 2.0 E.P. EC 2.0 E.P. EC 3.0 E.P. EC 3.0 E.P. EC 4.0 E.P. EC 6.0 E.P.
TS PLAKIR
SNOP 8
SNOP 16 SNOP 16
HOTEL PLAKIR
FER
KOMBI BROJILO
SNOP SUCELJE
1
1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 0 1 1 1 2 1 3 1 4 1 5 1 6
Blok
Blok
Glavna kuhinja
Kuhnja A.L.C
Satel. kuhinja
LAN (TCP/IP)
SNOP 8
Blok Aktiv
Blok Aktiv
Projekt br:
1
Sekcija:
12270-2009
3.1
List:
Listova:
34
21
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
22 34
3.1
3.1.5
Dispozicija opreme
Ormarii s izlaznim modulima sustava SNOP instaliraju se uz pripadne razvodne ormare u pojedinim objektima. U postojeim razvodnim ormarima potrebno je u strujnom krugu za pojedino troilo, koje je ukljueno u sustav SNOP, odstraniti veze izmeu pripadnih osiguraa i izlaznih stezaljki odvodnog kabela prema troilu i prespojiti na odgovarajui upravljaki kanal izlaznog modula sustava SNOP kao to prikazuje Slika 3.1.13.
Postojei RO
OSIGURAI DOVOD DOVOD
Postojei RO
OSIGURAI
ODVOD
ODSTRANITI !
TROILO
TROILO
SNOP
Sadanje stanje
DOVOD
ODVOD
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
23 34
3.1
SNOP 16
100
SNOP 16 KUHINJA
RK (postojeci)
200
RV (postojeci)
SNOP 8 WELLNESS
100
200
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
24 34
3.1
SNOP 16 - KUHINJA
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
25 34
3.1
SNOP 8 WELLNES
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
26 34
3.1
240
80
200
RO-Rest (postojeci)
SNOP 8 RESTORAN
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
27 34
3.1
SNOP 8 - RESTORAN
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
28 34
3.1
SNOP 16
200
RO-Rest (postojei)
SNOP 16 RESTORAN
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List:
29 34
3.1
Listova:
SNOP 16 - RESTORAN
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
30 34
3.1
60
60
30
80
100
140
SNOP 8 R1-E200
100
100
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
31 34
3.1
60
80
60
SNOP 8 R2-E300
100
140
100
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
32 34
3.1
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
33 34
3.1
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
34 34
3.1
Polje 1
SNOP 8
ugradnja uz RO-GK.KUH
SNOP 16
Polje 2
SNOP 16
ugradnja uz RO-KUH.A.-L.-C.
SNOP 16
Polje 3
SNOP 16
ugradnja uz RO-SAT.KUH.
Polje 4
SNOP 8
ugradnja uz RO-GL.REST.
Polje 5
SNOP 8
ugradnja uz RO-SAUNA
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 5
3.2
3.2
SADRAJ
3.2 SKLOPOVSKA NADOGRADNJA SUSTAVA SNOP II FAZA ................................... 2 3.2.1 Potronja goriva ................................................................................................... 2 3.2.2 Potronja vode ..................................................................................................... 4
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 5
3.2
3.2
Sustav SNOP je u osnovi koncipiran kao "energy management system" to znai da se proirenjem odgovarajuim sklopovljem omoguuje nadzor i drugih energenata osim elektrine energije kao to su: potronja goriva potronja vode potronja toplinske energije.
3.2.1 Potronja goriva U kotlovnici hotelskog kompleksa Babin kuk ugraena su tri kotla za potrebe grijanja sanitarne vode (svaki hotel posjeduje vlastiti izmjenjiva za grijanje vode). Kotlovski plamenici predvieni su za loenje lo-uljem. Za registraciju potronje pojedinog kotla te ukupnu potronju kotlovnice instalirani su mjerai protoka goriva CONTOIL proizvoaa "Aqua-metro" tip VZE 20 RC 70/16: DN PN Qmin Qmax Qn tmax 20 16 30 1500 1000 70 mm bar l/h l/h l/h o C
Mjerai protoka su elektronikog tipa. Na LCD displeju prikazuju trenutni protok u l/h. Totalizator s ugraenom baterijom pamti kumulativni protok (vijek baterije: 5 godina). Za potrebe registriranja potronje goriva u centralnom nadzorom sustavu potrebno je mjerae opremiti induktivnim davaima impulsa INA koji se spajaju na perifernu jedinicu sustava SNOP-F kao to prikazuje Slika 3.2.1. Dava impulsa:
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
3 5
3.2
DOVOD GORIVA
PLAMENIK (KOTAO 1)
PLAMENIK (KOTAO 2)
PLAMENIK (KOTAO 3)
CONTOIL
CONTOIL
CONTOIL
CONTOIL
LAN (TCP/IP)
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
4 5
3.2
3.2.2 Potronja vode Potronja vode pojedinih hotela mjeri se vodomjerima ugraenim u podzemne ahtove. Ugraeno Woltmanovo brojilo potrebno je opremiti odgovarajuim davaem impulsa (Slika 3.2.2) koji se povezuje na Wi-Fi beini predajnik impulsa kao to prikazuje Slika 3.2.3.
Beini predajnik ugrauje se u vodotjesno plastino kuite (IP65) za vanjsku montau koje se instalira na pogodnom povienom mjestu u blizini vodomjernog ahta. Wi-Fi beini predajnik napaja se iz litijeve baterije koja omoguuje rad nekoliko godina. Predajnik ima domet na otvorenom prostoru (bez zapreka) do 1000 m, to omoguuje da se predajnici za sve objekta poveu u mreu . U centru daljinskog nadzora instalira se Wi-Fi prijemnik koji predstavlja GATEWAY prema lokalnoj raunarskoj mrei (TCP/IP) na koju je prikljuen sustav SNOP:
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
5 5
3.2
WiFi predajnik
VODOMJERNI AHT
davac impulsa
FER
Unska 3, 1000 Zagreb
Hotel ARGOSY
Wi-Fi
Hotel MINCETA
Wi-Fi
Hotel PRESIDENT
Wi-Fi
Hotel TIRENA
Wi-Fi
Wi-Fi
Hotel PLAKIR
Knjiga br.:
Projekt br:
1
Sekcija:
12270-2009
3.2
List:
Listova:
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 7
3.3
3.3
SADRAJ
3.3 PROGRAMSKA NADOGRADNJA SUSTAVA SNOP I FAZA................................... 2 3.3.1 Regulacija angairane djelatne snage.................................................................. 2 3.3.2 Parametri troila ................................................................................................... 5 3.3.3 Alarmi ................................................................................................................... 6 3.3.4 Izvjea ................................................................................................................ 7 3.3.4.1 Standardna izvjea ......................................................................................... 7 3.3.4.2 Posebna izvjea.............................................................................................. 7 3.3.4.3 Export podataka................................................................................................ 7
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 7
3.3
3.3
Postojea programska podrka sustava SNOP omoguuje nadzor i registraciju: potronje djelatne el. energije potronje jalove el. energije angairane djelatne el. snage angairane jalove el. snage
kao to je opisano u toki 2.2.3. Sukladno projektnom programu (toka 2.4) programska podrka SNOP nadograuje se slijedeim modulima: 1. 2. 3. 4. 5. 6. Regulacija angairane djelatne snage Generiranje alarma u sluaju prekoraenja postavljenih limita djelatne snage Generiranje alarma u sluaju prekoraenja postavljenog faktora snage (cos < 0,95) Formiranje on-line SQL baze podataka s pripadnim grafikim preglednikom WEB-server za daljinski pristup SCADA aplikaciji i bazi podataka Utility funkcije: - export podataka u poslovni sustav - servisni modul za parametriranje sustava
3.3.1 Regulacija angairane djelatne snage Regulacija angairane snage u cilju odranja postavljenog limita vrnog optereenja koristi prediktivni algoritam koji tijekom 15-min mjernog perioda kontinuirano izraunava trend potronje temeljem kojeg odreuje trenutno dozvoljeno optereenje, to je grafiki prikazano na dijagramu (Slika 3.3.1):
tx
P Ex Plim Elim Pdoz Edoz
= mjerni period (15 min) = promatrani trenutak u mjernom periodu = optereenje u trenutku tx = potronja do trenutka tx = postavljen limit vrnog optereenja = limit potronje tijekom mjernog perioda = dozvoljeno optereenje u trenutku tx = dozvoljena potronja do kraja mjernog perioda
P=
E t
Elim = Plim * T
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
3 7
3.3
Eg Elim Pdoz
Pg
Edoz
P P*t Ex
tx
15'
Slika 3.3.1. Dijagram 15-min potronje
Od poetka mjernog perioda do trenutka tx uz optereenje P utroena je energija Ex. U vremenu (T-tx) do kraja mjernog perioda dozvoljena je potronja Edoz:
E = E P T doz lim
koja e biti ostvarena uz dozvoljeno optereenje Pdoz:
P *T E x Pdoz = lim T t x
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
4 7
3.3
Ukoliko je u trenutku tx trenutno optereenje P vee od izraunatog dozvoljenog optereenja Pdoz potrebno je iskljuiti razliku optereenja:
P = P - Pdoz
kako ne bi dolo do prekoraenja postavljenog limita vrnog optereenja. U nekim sustavima s diesel-agregatom, koji moe raditi paralelno s mreom, mogue je nadoknaditi tu razliku proizvodnjom iz diesel-agregata umjesto iskljuenja troila! Ukoliko pak je izraunata razlika P < 0 to znai da postoji rezerva snage pa je mogue ukljuiti odreena troila. Opisani algoritam regulacije angairane snage programiran je u obliku funkcijskog bloka za 8 upravljanih troila:
FB_MaximumDemandController bStart fMeterConstant fAgreedPower bPeriodPulse fLoadParameters stInDataKL1501 stOutDataKL1501 arrLoad fAgreedEnergy fInstantaneousEnargy fActualEnergy fRemainingTime fLastPeriodEnergy bEmargencySignal bError nErrorId
Ulazne varijable: bStart fMeterConstant fAgreedPower bPeriodPulse fLoadParameters aktiviranje funkcijskog bloka konstanta brojila (imp/kWh) maksimalna dozvoljena snaga (kW) impuls 15-min mjernog perioda struktura parametara za svako troilo bConnected: 1 = ukljueno; 0 = iskljueno nDegreeOfPriority: prioritet troila (1= najnii, 8= najvii) tMINPowerOnTime: minimalno vrijeme ukljuenja (s) tMINPowerOffTime: minimalno vrijeme iskljuenja (s) tMAXPowerOffTime: maksimalno vrijeme iskljuenja (s) ulazni status suelja el. brojila izlazni status suelja el. brojila
stInDataKL1501 stOutDataKL1501
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
5 7
3.3
Izlazne varijable: arrLoad fAgreedEnergy fInstantaneousEnargy fActualEnergy fRemainingTime fLastPeriodEnergy bEmargencySignal bError nErrorId polje izlaznih signala za upravljanje s 8 troila ugovorena 15-min potronja trenutna potronja u mjernom periodu potronja od poetka mjernog perioda preostalo vrijeme do kraja mjernog perioda optereenje u prethodnom mjernom periodu alarm prekoraenja limita vrnog optereenja alarm sklopovska greka kod greke (za detaljni opis)
3.3.2 Parametri troila Kao to se vidi iz prethodnog opisa algoritma regulacije angairane snage, za sva troila koja se ukljuuju u sustav SNOP potrebno je definirati odreene parametre sukladno tehnolokom procesu: PARAMETAR prioritet minimalno vrijeme ukljuenja minimalno vrijeme iskljuenja maksimalno vrijeme iskljuenja Oznaka PR TminON TminOFF TmaxOFF ZNAENJE rangiranje troila po vanosti 1 do 8 nii prioritet se prije iskljuuje vrijeme kroz koje se troilo ne smije iskljuivat nakon ukljuenja ( vrijeme kroz koje se troilo ne smije ukljuivat nakon iskljuenja vrijeme unutar kojeg se troilo mora ponovno ukljuiti nakon iskljuenja
Za sva troila u jednom objektu koja se ukljuuju u sustav SNOP potrebno je odrediti parametre koji se unose u sustav. Parametre odreuje korisnik sukladno tehnolokom procesu, a unosi ih u tablicu: Broj 1 2 3 4 5 6 7 8 TROILO PR TminON TminOFF TmaxOFF
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
6 7
3.3
3.3.3 Alarmi Sustav SNOP posjeduje autodijagnostiki algoritam koji nadzire ispravan rad samog sustava. U sluaju detekcije nepravilnosti u radu automatski se generira odgovarajui alarm. Generiranje svakog alarma se moe parametrirati u tzv. Alarm server aplikaciji, kojom se svakom dogaaju pridodjeljuje nain obrade te prioritet i prosljeivanje alarma. Dogaaj: - izostanak impulsa mjernog perioda (T>16min) - izostanak impulsa djelatne snage - izostanak impulsa jalove snage - nemogunost iskljuenja odreenog troila - prekoraenje postavljenog limita djelatne snage - prekoraenje postavljenog faktora snage (cos < 0,95) - iskljuenje podsustava SNOP iz regulacije angairane snage - prekid komunikacije SNOP-Host <=> podsustav SNOP - prekid komunikacije SNOP-Host <=> poslovni sustav Svakom dogaaju mogu se putem servisne aplikacije mijenjati atributi: Alarm Zvuni signal GSM DA/NE DA/NE DA/NE
Ako se odreeni dogaaj oznai kao ALARM, sustav automatski generira alarmni panel na ekranu nadzornog PC raunala u centru nadzora koji zahtijeva POTVRDU alarma. Alarmni server biljei u bazu podataka vrijeme nastanka alarma, vrijeme potvrde alarma te vrijeme nestanka alarma. Svakom alarmu moe se pridijeliti atribut generiranja zvunog alarma odnosno generiranja SMS alarmne poruke. SMS alarmne poruke alju se automatski ukoliko alarm nije potvren u odreenom vremenu. Telefonski brojevi primatelja SMS alarma upisuju se u tablicu pridruenu svakom alarmnom signalu.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
7 7
3.3
3.3.4 Izvjea Sve vrste izvjea koja se mogu generirati u sustavu SNOM temelje se na jedinstvenoj SQL bazi podataka koja se permanentno osvjeava. Glavna baza podataka rezidentna je na host raunalu u centru nadzora. Svaki podsustav SNOP formira vlastitu bazu rezidentnu u PLC spojki, a podatci iz lokalnih baza se automatski preslikavaju u centralnu bazu na host raunalo u centru nadzora. U sluaju prekida veze izmeu centra i perifernog podsustava, osvjeavanje baze u centru obavlja se automatski nakon ponovne uspostave veze s perifernim podsustavom SNOP koji kontinuirano sprema podatke u vlastitu memoriju. 3.3.4.1 Standardna izvjea Standardna izvjea generiraju se u postojeem sustavu SNOP i za svako mjesto preuzimanja el. energije gdje je instaliran sustav SNOP obuhvaaju: - dnevno izvjee potronje: - mjeseno izvjee potronje: - dnevna lista dogaaja: 3.3.4.2 Posebna izvjea Sklopovskom i programskom nadogradnjom sustava SNOP proiruje se paleta izvjea: - dnevno izvjee redukcije potronje: - specifina potronja po gostu: - specifina potronja po gostu: grafiki i tabelarni prikaz za svako troilo prikaz po objektu prikaz za kompleks grafiki i numeriki prikaz grafiki i numeriki prikaz alfanumeriki prikaz
Posebna izvjea mogu se generirati odabirom vremenske baze za: dan, mjesec i godinu, odnosno za proizvoljno odabrani period. 3.3.4.3 Export podataka S obzirom da glavna baza podataka biljei sve podatke u sustavu s pridodijeljenim vremenskim oznakama, omoguen je proizvoljan export podataka iz baze u odabranom standardnom formatu: txt, csv, xls. Za pristup bazi podataka potrebno je korisniko ime i zaporka.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 2
3.4
3.4
SADRAJ
3.4 PROGRAMSKA NADOGRADNJA SUSTAVA SNOP II FAZA.................................. 2 3.4.1 Nadzor potronje goriva ....................................................................................... 2 3.4.2 Nadzor potronje vode ......................................................................................... 2
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 2
3.4
3.4
Sklopovska nadogradnja sustava SNOP opremom za nadzor potronje goriva odnosno potronje vode zahtjeva i nadogradnju programske podrke za prikaz i registraciju potronje navedenih medija. 3.4.1 Nadzor potronje goriva Trenutna potronja goriva u kotlovnici kompleksa prati se na posebnom ekranskom prikazu predvienom za nadzor kotlovnice. Ekranski prikaz sadri numerike i grafike prikaze trenutne potronje te dijagram dnevne potronje za pojedine kotlove, te sumarni dijagram potronje za cijelu kotlovnicu. S obzirom da se podatci o potronji pohranjuju u centralnu bazu podataka, mogue je po zahtjevu generirati dnevna i mjesena izvjea potronje goriva. Takoer je mogue generirati posebna izvjea specifine potronje goriva po gostu u dnevnom, mjesenom i godinjem razdoblju odnosno traenom vremenskom intervalu. 3.4.2 Nadzor potronje vode S obzirom da se registracija potronje vode za sve objekte obavlja u centru nadzora, na centralnom nadzornom raunalu predvien je posebni ekranski prikaz za potronju vode koji sadri numerike i grafike prikaze trenutne potronje te dijagram dnevne potronje za pojedine objekte, te sumarni dijagram potronje za cijeli kompleks. Na zahtjev korisnika mogue je generirati dnevna, mjesena odnosno godinja izvjea potronje ili izvjea za odabrani vremenski period. U sluaju da sustav registrira anomalije u registraciji potronje vode (iznimno mala odnosno velika potronja) za odreeni objekt, automatski se generira alarm koji upozorava na mogue kvarove. U posebnim izvjeima mogue je dobiti grafike i numerike prikaze potronje vode po gostu u dnevnim, mjesenim odnosno godinjim periodima.
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 3
3.5
3.5 3.5
SADRAJ
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 3
3.5
3.5
Hotelski kompleks "Babin kuk" preuzima elektrinu energiju od HEP-ODS "ELEKTROJUG Dubrovnik" na devet obraunskih mjernih mjesta: ugovor Mjerno mjesto Adresa Napon (kW) Model 1. 2. 3. 4. 5. 6. 7. 8. 9. Dubrovnik Babin kuk d.d., ira Caria 3 Centralna kotlovnica Dubrovnik, Iva Dulia 20 Hotel Plakir Dubrovnik, Iva Dulia 20 Trgovaki centar Tirena Dubrovnik, Iva Dulia 22 Trgovaki centar Argosy Dubrovnik, Iva Dulia 41 Gospodarski centar Dubrovnik, ira Caria 3 Hotel Tirena Dubrovnik, Iva Dulia 22 Hotel Argosy Dubrovnik, Iva Dulia 41 Hotel Dubrovnik President, Dubrovnik, Iva Dulia 39 0,4 kV 10 kV 10 kV 10 kV 10 kV 10 kV 10 kV 10 kV 10 kV 150 90 470 180 510 360 360 550 crveni bijeli bijeli bijeli bijeli bijeli bijeli bijeli bijeli
kao to shematski prikazuje Slika 3.5.1. Obraun ukupne angairane snage u doba vie tarife za mjerna mjesta 2.-9. (preuzimanje na 10 kV - bijeli model) obavlja se zbrajanjem pojedinano oitanih angairanih snaga u pojedinom obraunskom razdoblju. Analiza potronje (toka 2.3) pokazuje da je na mjernim mjestima gdje je ugraen sustav SNOP (TS Tirena, TS Argosy, TS President) zbroj pojedinano oitanih angairanih snaga obraunat od HEP-ODS prosjeno 17% vei od stvarno postignute istodobno angairane snage koju je registrirao sustav SNOP. S obzirom da su sva navedena mjesta preuzimanja elektrine energije pravno-formalno u vlasnitvu jednog vlasnika "VALAMAR HOTELS & RESORTS DUBROVNIK BABIN KUK" postoji opravdani razlog da se obraun angairane snage obavlja na temelju istodobne registracije snage na svim mjernim mjestima u okviru kompleksa Babin kuk, to se pravno temelji na slijedeim aktima: 1. OPI UVJETI ZA OPSKRBU ELEKTRINOM ENERGIJOM (NN 14 / 08.02.2006.) lanak 77.: "Kupac koji na jednoj graevinskoj cjelini ima vie prikljuaka meusobno udaljenih i vie obraunskih mjernih mjesta, moe imati istodobnu registraciju ukupne vrne snage, u skladu s tehnikim uvjetima iz elektroenergetske suglasnosti." 2. TARIFNI SUSTAV ZA USLUGE ELEKTROENERGETSKIH DJELATNOSTI KOJE SE OBAVLJAJU KAO JAVNE USLUGE (NN 101 / 30.08.2002.) lanak 13., stavak 3: "Ako kupac preuzima elektrinu energiju na vie mjesta, izmjerena snaga se obraunava odvojeno za svako mjesto prikljuka. Ako se kupcu vrno optereenje mjeri na vie mjesta predaje, a u okviru jedne graevinske lokacije, izmjerena snaga se utvruje zbrajanjem istovremenih vrnih optereenja na svim mjestima mjerenja."
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
3 3
3.5
3. MRENA PRAVILA ELEKTROENERGETSKOG SUSTAVA (NN 36 / 31.03.2006.) Pojmovnik 6.2, stavak 6.: "Pored obraunskih mjernih mjesta mjerna pravila predviaju i postojanje zbirnog mjernog mjesta na kojem se podaci s vie obraunskih mjernih mjesta obrauju radi oblikovanja brojanih vrijednosti koje proistjeu iz posebnih dogovora sklopljenih izmeu sudionika trita, a odnose se na obraun i/ili razmjenu podataka." 4. PRAVILA O MJERNIM PODACIMA (HEP-ODS 01.07.2008.) lanak 19., stavak 11.: "U sluaju istodobne registracije ukupne vrne snage za vie obraunskih mjernih mjesta, obraunska snaga se utvruje kao najvei zbroj istodobno izmjerenih srednjih snaga pomou ureaja za registriranje sumarne obraunske snage ili iz obraenih i potvrenih krivulja optereenja." Da bi se iskoristila navedena mogunost obrauna ukupne vrne snage kao zbroja istodobno registriranih vrnih optereenja, na svim mjernim mjestima koja su obuhvaena takovim nainom obrauna mora postojati mogunost registracije i daljinskog oitanja tzv. dnevnog profila optereenja (krivulja optereenja). To se omoguuje ugradnjom odgovarajueg tipa brojila s komunikacijskom opremom za daljinsko oitanje: IskraEMECO MT831. Tijekom 2008. godine isporuitelj elektrine energije HEP-ODS ELEKTROJUG Dubrovnik obavio je zamjenu postojeih brojila elektrine energije na svim navedenim mjernim mjestima s novim tipom brojila IskraEMECO MT831 opremljenim GSM modulom za daljinsko oitanje (osim u TS Plakir, koja je trenutno u rekonstrukciji i predviena je ugradnja navedenog tipa brojila) tako da postoje svi sklopovski preduvjeti za promjenu naina obrauna ukupne angairane snage za cijeli hotelski kompleks Babin kuk. Da bi se ostvario navedeni nain obrauna ukupne angairane snage potrebno je isporuitelju elektrine energije HEP-ODS ELEKTROJUG Dubrovnik podnijeti zahtjev za promjenu naina obrauna ukupne angairane snage uz odgovarajuu dokumentaciju iz koje je vidljivo da sva navedena mjerna mjesta na predmetnoj graevinskoj lokaciji pripadaju istoj pravnoj osobi vlasniku.
FER
TS ARGOSY TS TIRENA
5 4
2
TRG. CENTAR HOTEL
TRG. CENTAR
HOTEL
TS PRESIDENT
TS PLAKIR
POTROACI
3
Napajanje 10 kV - MEAREVO
OR G AT E CN I M
HOTEL
Knjiga br.:
Projekt br:
HOTEL
12270-2009
Sekcija:
3.5
TS NEPTUN HOTEL
List:
Listova:
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List:
1 1
4.0
Listova:
4.
SPECIFIKACIJA OPREME
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 21
4.1
4.1
SADRAJ
4.1 TROKOVNIK I-FAZA................................................................................................. 2 4.1.1 SNOP Hotel PRESIDENT ................................................................................. 2 4.1.2 SNOP Hotel ARGOSY....................................................................................... 5 4.1.3 SNOP Hotel TIRENA......................................................................................... 8 4.1.4 SNOP Hotel MINETA.................................................................................... 11 4.1.5 SNOP Hotel PLAKIR ....................................................................................... 14 4.1.6 SNOP KOTLOVNICA ...................................................................................... 19 4.1.7 SNOP Nadzorni CENTAR ............................................................................... 20
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 21
4.1
4.1
TROKOVNIK
I-FAZA
kom 1
2. Komunikacijski modul ELPRO ugraen u plastino IP65 kuite 250x300x160 mm (xVxD): - ELPRO 905U-1 Wireless IO (4DI 24 V, 4 Rly Out, 1 AI 4-20 mA, 1 AO 4-20mA)
__________
__________
kom 1
__________
UKUPNO OPREMA:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
3 21
4.1
RADOVI
4. Montaa zidnog ormara SNOP-16 (Polje 1) uz postojei RK (RO-kuhinja), probijanje poda u RK, postavljanje zidne kanalice 100x60 mm izmeu RK i SNOP-16, odspajanje odvoda u RK i prespajanje na SNOP-16 finoinim bakrenim vodovima 6/10 mm2 poloenim u zidnu kanalicu
kom 1
5. Spajanje osnovnog modula SNOP u TS 10/0,4 kV s izlaznim modulom SNOP-16 (Polje 1) vieilnim oklopljenim kabelom LYiCY 8x0,35 mm2 poloenim u zidnu kanalicu 20x10 mm cca 50 m
__________
kom 1
6. Montaa plastinog kuita komunikacijskog modula ELPRO-A na fasadu objekta, spajanje ELPRO-A s modulom SNOP-16 (Polje 1) vieilnim oklopljenim kabelom LYiCY 16x0,35 mm poloenim u zidnu kanalicu 20x10 mm cca 30 m
__________
kom 1
7. Montaa plastinog kuita komunikacijskog modula ELPRO-B na ogradni zid rashladnih agregata: - spajanje ELPRO-B s upravljakim ormariem rashladnog agregata br.1 vieilnim oklopljenim kabelom LYiCY 8x0,35 mm poloenim u plastinu armiranu zatitnu cijev ca 20 m - spajanje ELPRO-B s upravljakim ormariem rashladnog agregata br.1 vieilnim oklopljenim kabelom LYiCY 8x0,35 mm poloenim u plastinu armiranu zatitnu cijev ca 20 m
__________
kom 1
8. Spajanje izlaznog modula SNOP-16 (Polje 1) na lokalnu raunarsku mreu STP kabelom CAT5 poloenim djelomino na postojee kabelske police, a djelomino u zidne kanalice 20x10 mm cca 50 m
__________
kom 1
9. Montaa zidnog ormara SNOP-8 (Polje 2) uz postojei RV (RO-Wellness), probijanje poda u RV, postavljanje zidne kanalice 100x60 mm izmeu RV i SNOP-8, odspajanje odvoda u RV i prespajanje na SNOP-8 finoinim bakrenim vodovima 6/10 mm2 poloenim u zidnu kanalicu
__________
kom 1
10. Spajanje izlaznog modula SNOP-8 (Polje 2) na lokalnu raunarsku mreu STP kabelom CAT5 poloenim u zidne kanalice 20x10 mm cca 50 m
__________
kom 1
__________
UKUPNO RADOVI:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
4 21
4.1
USLUGE
11. Izrada, instaliranje, parametriranje i putanje u pogon PLC aplikacije za regulaciju angairane snage za 16 troila (Polje 1): - maximum demand controler - HMI interface - OPC alarm server
kom 1
12. Izrada, instaliranje, parametriranje i putanje u pogon PLC aplikacije za regulaciju angairane snage za 8 troila (Polje 2): - maximum demand controler - HMI interface - OPC alarm server
__________
kom 1
__________
UKUPNO USLUGE:
__________
====================================================================
SVEUKUPNO (PRESIDENT)
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
5 21
4.1
kom 1
14. Komunikacijski modul ELPRO ugraen u plastino IP65 kuite 250x300x160 mm (xVxD): - ELPRO 905U-1 Wireless IO (4DI 24 V, 4 Rly Out, 1 AI 4-20 mA, 1 AO 4-20mA)
__________
kom 2
__________
UKUPNO OPREMA:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
6 21
4.1
RADOVI
15. Montaa zidnog ormara SNOP-8 (Polje 1) uz postojei RO-rest, probijanje poda u RO-rest, postavljanje zidne kanalice 100x60 mm izmeu RO-rest i SNOP-8, odspajanje odvoda u RO-rest i prespajanje na SNOP-8 finoinim bakrenim vodovima 6/10 mm2 poloenim u zidnu kanalicu
kom 1
16. Spajanje osnovnog modula SNOP u TS 10/0,4 kV s izlaznim modulom SNOP-8 (Polje 1) vieilnim oklopljenim kabelom LYiCY 8x0,35 mm2 poloenim u zidnu kanalicu 20x10 mm cca 50 m
__________
kom 1
17. Montaa plastinog kuita komunikacijskog modula ELPRO-A na fasadu objekta, spajanje ELPRO-A s modulom SNOP-8 (Polje 1) vieilnim oklopljenim kabelom LYiCY 16x0,35 mm poloenim u zidnu kanalicu 20x10 mm cca 30 m
__________
kom 1
18. Montaa plastinog kuita komunikacijskog modula ELPRO-B na ogradni zid rashladnih agregata: - spajanje ELPRO-B s upravljakim ormariem rashladnog agregata br.1 vieilnim oklopljenim kabelom LYiCY 8x0,35 mm poloenim u plastinu armiranu zatitnu cijev ca 20 m - spajanje ELPRO-B s upravljakim ormariem rashladnog agregata br.1 vieilnim oklopljenim kabelom LYiCY 8x0,35 mm poloenim u plastinu armiranu zatitnu cijev ca 20 m
__________
kom 1
19. Spajanje izlaznog modula SNOP-8 (Polje 1) na lokalnu raunarsku mreu STP kabelom CAT5 poloenim djelomino na postojee kabelske police, a djelomino u zidne kanalice 20x10 mm cca 50 m
__________
kom 1
__________
UKUPNO RADOVI:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
7 21
4.1
USLUGE
20. Izrada, instaliranje, parametriranje i putanje u pogon PLC aplikacije za regulaciju angairane snage za 8 troila (Polje 1): - maximum demand controler - HMI interface - OPC alarm server
kom 1
__________
UKUPNO USLUGE:
__________
====================================================================
SVEUKUPNO (ARGOSY)
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
8 21
4.1
kom 1
22. Komunikacijski modul ELPRO ugraen u plastino IP65 kuite 250x300x160 mm (xVxD): - ELPRO 905U-1 Wireless IO (4DI 24 V, 4 Rly Out, 1 AI 4-20 mA, 1 AO 4-20mA)
__________
kom 2
__________
UKUPNO OPREMA:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
9 21
4.1
RADOVI
23. Montaa zidnog ormara SNOP-16 (Polje 1) uz postojei RO-rest, probijanje poda u RO-rest, postavljanje zidne kanalice 100x60 mm izmeu RO-rest i SNOP-16, odspajanje odvoda u RO-rest i prespajanje na SNOP-16 finoinim bakrenim vodovima 6/10 mm2 poloenim u zidnu kanalicu
kom 1
24. Spajanje osnovnog modula SNOP u TS 10/0,4 kV s izlaznim modulom SNOP-16 (Polje 1) vieilnim oklopljenim kabelom LYiCY 8x0,35 mm2 poloenim u zidnu kanalicu 20x10 mm cca 50 m
__________
kom 1
25. Montaa plastinog kuita komunikacijskog modula ELPRO-A na fasadu objekta, spajanje ELPRO-A s modulom SNOP-16 (Polje 1) vieilnim oklopljenim kabelom LYiCY 16x0,35 mm poloenim u zidnu kanalicu 20x10 mm cca 30 m
__________
kom 1
26. Montaa plastinog kuita komunikacijskog modula ELPRO-B na ogradni zid rashladnih agregata: - spajanje ELPRO-B s upravljakim ormariem rashladnog agregata br.1 vieilnim oklopljenim kabelom LYiCY 8x0,35 mm poloenim u plastinu armiranu zatitnu cijev ca 20 m - spajanje ELPRO-B s upravljakim ormariem rashladnog agregata br.1 vieilnim oklopljenim kabelom LYiCY 8x0,35 mm poloenim u plastinu armiranu zatitnu cijev ca 20 m
__________
kom 1
27. Spajanje izlaznog modula SNOP-16 (Polje 1) na lokalnu raunarsku mreu STP kabelom CAT5 poloenim djelomino na postojee kabelske police, a djelomino u zidne kanalice 20x10 mm cca 50 m
__________
kom 1
__________
UKUPNO RADOVI:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
10 21
4.1
USLUGE
28. Izrada, instaliranje, parametriranje i putanje u pogon PLC aplikacije za regulaciju angairane snage za 16 troila (Polje 1): - maximum demand controler - HMI interface - OPC alarm server
kom 1
__________
UKUPNO USLUGE:
__________
====================================================================
SVEUKUPNO (TIRENA)
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
11 21
4.1
kom 1
30. Komunikacijski modul ELPRO ugraen u plastino IP65 kuite 250x300x160 mm (xVxD): - ELPRO 905U-1 Wireless IO (4DI 24 V, 4 Rly Out, 1 AI 4-20 mA, 1 AO 4-20mA)
__________
__________
kom 1
__________
UKUPNO OPREMA:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
12 21
4.1
RADOVI
32. Montaa zidnog ormara SNOP-8 (Polje 1) uz postojei R1(E200), probijanje poda u R-1(E200), postavljanje zidne kanalice 100x60 mm izmeu R-1(E200) i SNOP-8, odspajanje odvoda u R-1(E200) i prespajanje na SNOP8 finoinim bakrenim vodovima 6/10 mm2 poloenim u zidnu kanalicu
kom 1
33. Spajanje osnovnog modula SNOP u TS 10/0,4 kV s izlaznim modulom SNOP-8 (Polje 1) vieilnim oklopljenim kabelom LYiCY 8x0,35 mm2 poloenim u zidnu kanalicu 20x10 mm cca 50 m
__________
kom 1
34. Montaa plastinog kuita komunikacijskog modula ELPRO-A na fasadu objekta, spajanje ELPRO-A s modulom SNOP-8 (Polje 1) vieilnim oklopljenim kabelom LYiCY 16x0,35 mm poloenim u zidnu kanalicu 20x10 mm cca 30 m
__________
kom 1
35. Montaa plastinog kuita komunikacijskog modula ELPRO-B na ogradni zid rashladnih agregata: - spajanje ELPRO-B s upravljakim ormariem rashladnog agregata br.1 vieilnim oklopljenim kabelom LYiCY 8x0,35 mm poloenim u plastinu armiranu zatitnu cijev ca 20 m - spajanje ELPRO-B s upravljakim ormariem rashladnog agregata br.1 vieilnim oklopljenim kabelom LYiCY 8x0,35 mm poloenim u plastinu armiranu zatitnu cijev ca 20 m
__________
kom 1
36. Spajanje izlaznog modula SNOP-8 (Polje 1) na lokalnu raunarsku mreu STP kabelom CAT5 poloenim djelomino na postojee kabelske police, a djelomino u zidne kanalice 20x10 mm cca 50 m
__________
kom 1
37. Montaa zidnog ormara SNOP-8 (Polje 2) uz postojei R2(E300), probijanje poda u R-2(E300), postavljanje zidne kanalice 100x60 mm izmeu R-2(E300) i SNOP-8, odspajanje odvoda u RV i prespajanje na SNOP-8 finoinim bakrenim vodovima 6/10 mm2 poloenim u zidnu kanalicu
__________
kom 1
38. Spajanje izlaznog modula SNOP-8 (Polje 2) na lokalnu raunarsku mreu STP kabelom CAT5 poloenim u zidne kanalice 20x10 mm cca 50 m
__________
kom 1
__________
UKUPNO RADOVI:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
13 21
4.1
USLUGE
39. Izrada, instaliranje, parametriranje i putanje u pogon PLC aplikacije za regulaciju angairane snage za 8 troila (Polje 1): - maximum demand controler - HMI interface - OPC alarm server
kom 1
40. Izrada, instaliranje, parametriranje i putanje u pogon PLC aplikacije za regulaciju angairane snage za 8 troila (Polje 2): - maximum demand controler - HMI interface - OPC alarm server
__________
kom 1
__________
UKUPNO USLUGE:
__________
====================================================================
SVEUKUPNO (MINETA)
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
14 21
4.1
__________
__________
kom 1
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
15 21
4.1
__________
__________
__________ __________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
16 21
4.1
RADOVI
47. Montaa zidnog ormaria SNOP (Osnovni modul) u transformatorskoj stanici TS 10/04 kV, spajanje na el. brojilo vieilnim oklopljenim kabelom LYiCY 8x0,35 mm2 poloenim u zidnu kanalicu 20x10 mm cca 20 m
kom 1
48. Spajanje osnovnog modula SNOP na lokalnu raunarsku mreu STP kabelom CAT5 poloenim djelomino na postojee kabelske police, a djelomino u zidne kanalice 20x10 mm cca 50 m
__________
kom 1
49. Montaa zidnog ormara SNOP-8 (Polje 1) uz postojei RO-GL.KUH, probijanje poda u RO-GL.KUH, postavljanje zidne kanalice 100x60 mm izmeu RO-GL.KUH i SNOP8, odspajanje odvoda u RO-GL.KUH i prespajanje na SNOP-8 finoinim bakrenim vodovima 6/10 mm2 poloenim u zidnu kanalicu
__________
kom 1
50. Spajanje izlaznog modula SNOP-8 (Polje 1) na lokalnu raunarsku mreu STP kabelom CAT5 poloenim djelomino na postojee kabelske police, a djelomino u zidne kanalice 20x10 mm cca 50 m
__________
kom 1
51. Montaa zidnog ormara SNOP-16 (Polje 2) uz postojei RO-KUH.A.L.C, probijanje poda u RO-KUH.A.L.C, postavljanje zidne kanalice 100x60 mm izmeu ROKUH.A.L.C i SNOP-16, odspajanje odvoda u ROKUH.A.L.C i prespajanje na SNOP-16 finoinim bakrenim vodovima 6/10 mm2 poloenim u zidnu kanalicu
__________
kom 1
52. Spajanje izlaznog modula SNOP-16 (Polje 2) na lokalnu raunarsku mreu STP kabelom CAT5 poloenim u zidne kanalice 20x10 mm cca 50 m
__________
kom 1
53. Montaa zidnog ormara SNOP-16 (Polje 3) uz postojei RO-SAT.KUH, probijanje poda u RO-SAT.KUH, postavljanje zidne kanalice 100x60 mm izmeu ROSAT.KUH i SNOP-16, odspajanje odvoda u ROSAT.KUH i prespajanje na SNOP-16 finoinim bakrenim vodovima 6/10 mm2 poloenim u zidnu kanalicu
__________
kom 1
54. Spajanje izlaznog modula SNOP-16 (Polje 3) na lokalnu raunarsku mreu STP kabelom CAT5 poloenim u zidne kanalice 20x10 mm cca 50 m
__________
kom 1
55. Montaa zidnog ormara SNOP-8 (Polje 4) uz postojei RO-GL.REST, probijanje poda u RO-GL.REST, postavljanje zidne kanalice 100x60 mm izmeu RO-
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
17 21
4.1
GL.REST i SNOP-8, odspajanje odvoda u RO-GL.REST i prespajanje na SNOP-8 finoinim bakrenim vodovima 6/10 mm2 poloenim u zidnu kanalicu
kom 1
56. Spajanje izlaznog modula SNOP-8 (Polje 4) na lokalnu raunarsku mreu STP kabelom CAT5 poloenim djelomino na postojee kabelske police, a djelomino u zidne kanalice 20x10 mm cca 50 m
__________
kom 1
57. Montaa zidnog ormara SNOP-8 (Polje 5) uz postojei RO-SAUNA, probijanje poda u RO-SAUNA, postavljanje zidne kanalice 100x60 mm izmeu RO-SAUNA i SNOP8, odspajanje odvoda u RO-SAUNA i prespajanje na SNOP-8 finoinim bakrenim vodovima 6/10 mm2 poloenim u zidnu kanalicu
__________
kom 1
58. Spajanje izlaznog modula SNOP-8 (Polje 5) na lokalnu raunarsku mreu STP kabelom CAT5 poloenim djelomino na postojee kabelske police, a djelomino u zidne kanalice 20x10 mm cca 50 m
__________
kom 1
__________
UKUPNO RADOVI:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
18 21
4.1
USLUGE
59. Izrada, instaliranje, parametriranje i putanje u pogon PLC aplikacije za regulaciju angairane snage za 8 troila (Polje 1): - maximum demand controler - HMI interface - OPC alarm server
kom 1
60. Izrada, instaliranje, parametriranje i putanje u pogon PLC aplikacije za regulaciju angairane snage za 16 troila (Polje 2): - maximum demand controler - HMI interface - OPC alarm server
__________
kom 1
61. Izrada, instaliranje, parametriranje i putanje u pogon PLC aplikacije za regulaciju angairane snage za 16 troila (Polje 3): - maximum demand controler - HMI interface - OPC alarm server
__________
kom 1
62. Izrada, instaliranje, parametriranje i putanje u pogon PLC aplikacije za regulaciju angairane snage za 8 troila (Polje 4): - maximum demand controler - HMI interface - OPC alarm server
__________
kom 1
63. Izrada, instaliranje, parametriranje i putanje u pogon PLC aplikacije za regulaciju angairane snage za 8 troila (Polje 5): - maximum demand controler - HMI interface - OPC alarm server
__________
kom 1
__________
UKUPNO USLUGE:
__________
====================================================================
SVEUKUPNO (PLAKIR)
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
19 21
4.1
kom 1
65. Trofazno trosistemsko indirektno elektrino brojilo (5A, 100V) "IskraEMECO" tip MT 831 s ugraenim ulaznoizlaznim modulom MIO V42L81
__________
kom 1
NAPOMENA: Elektrino brojilo ugrauje i spaja Elektra. Trokove ugradnje i spajanje brojila potrebno je ugovoriti posebno.
__________
__________
kom 1
67. Spajanje osnovnog modula SNOP na lokalnu raunarsku mreu STP kabelom CAT5 poloenim djelomino na postojee kabelske police, a djelomino u zidne kanalice 20x10 mm cca 50 m
__________
__________ __________
__________ __________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
20 21
4.1
__________
kom
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
21 21
4.1
71. UPS
- Snaga 1550 VA / 1100 W - IEC13 priklljuci 4 (10A) 2x1 - Komunikacija USB+RS232+ON/OFF Remote Pwr Off - BACK UP vrijeme 7 - 14 min - Zamjenjive baterije - Jamstvo 24 mjeseca
kom 1
__________
UKUPNO OPREMA:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
22 21
4.1
USLUGE
72. Instalacija, parametriranje i putanje u pogon SNOPSCADA programske podrke za nadzorno PC raunalo u nadzornom centru sukladno programskom zadatku (Poglavlje 2.4. toke 7, 8, 9 i 10): Prikazi (po objektima i zbirno za kompleks): - potronja djelatne el. energije - potronja jalove el. energije - angairana djelatna el. snaga - angairana jalova el. snaga Taskovi - WEB-server za daljinski pristup SCADA aplikaciji i bazi podataka - On-line SQL baza podataka s pripadnim grafikim preglednikom - ALARM-server, SMS alarming - Utility funkcije: - export podataka u poslovni sustav - servisni modul za parametriranje sustava Izvjea - dnevno izvjee potronje - mjeseno izvjee potronje - dnevna lista dogaaja - dnevno izvjee redukcije potronje - specifina potronja po gostu
kom 1
__________
UKUPNO USLUGE:
__________
====================================================================
SVEUKUPNO (CENTAR)
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 5
4.2
4.2
SADRAJ
4.2 TROKOVNIK II-FAZA................................................................................................ 2 4.2.1 Potronja goriva KOTLOVNICA ........................................................................ 2 4.2.2 Potronja vode - OBJEKTI ................................................................................... 3 4.2.3 SNOP Nadzorni CENTAR ................................................................................. 5
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 5
4.2
4.2
TROKOVNIK
II-FAZA
kom 4
2. Proirenje osnovnog modula SNOP: - KL1408 8-ch Input Terminal - redne stezaljke i spojni pribor 1 kom
__________
kom 1
__________
__________
kom 4
__________
UKUPNO RADOVI: USLUGE 4. Instalacija, parametriranje i putanje u pogon PLC aplikacije za nadzor potronje goriva kom 1
__________
__________
UKUPNO USLUGE:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
3 5
4.2
kom 5
6. Proirenje osnovnog modula SNOP: - KL1408 8-ch Input Terminal - redne stezaljke i spojni pribor 1 kom
__________
kom 1
7. Broja impulsa s predajnikom za beinu mreu 2,4 GHz, IEEE 802.14.4 domet do 1000 m ugraen u IP65 plastino kuite za vanjsku ugradnju, s baterijskim napajanjem (min 5 god): - Wireless pulse counter SWS-DPC 1 kom - battery pack 4,5 V (2x3 D) 1 kom - redne stezaljke i spojni pribor
__________
kom 5
8. Suelje Modbus-TCP Gateway za oitavanje beinih brojaa impulsa s prikljukom na lokanu mreu ugraen u IP65 plastino kuite za vanjsku ugradnju: - BMS protocol interface SWRF 1 kom - napajanje 230/24 V 1 kom - redne stezaljke i spojni pribor
__________
kom 1
__________
UKUPNO OPREMA:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
4 5
4.2
RADOVI
9. Montaa plastinog kuita s beinim davaem impulsa na pogodno povieno mjesto (Hmin > 3 m) u blizini vodomjernog ahta
kom 5
10. Spajanje davaa impulsa u vodomjernom ahtu na beine brojae impulsa vieilnim oklopljenim kabelom LYiCY 4x0,5 mm2 poloenim kroz plastinu armiranu zatitnu cijev cca 20 m
__________
kom 5
11. Montaa plastinog kuita s Modbus-TCP Gateway na pogodno povieno mjesto (Hmin > 3 m) na fasadi objekta centra nadzora
__________
kom 1
12. Spajanje plastinog kuita s Modbus-TCP Gateway na lokalnu raunarsku mreu STP kabelom CAT5 poloenim kroz plastinu armiranu zatitnu cijev cca 20 m
__________
kom 1
__________
UKUPNO RADOVI: USLUGE 13. Instalacija, parametriranje i putanje u pogon PLC aplikacije za nadzor potronje vode: - trenutna i kumulativna potronja - alarm u sluaju prekomjerne potronje kom 1
__________
__________
UKUPNO USLUGE:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
5 5
4.2
kom 1
__________
UKUPNO USLUGE:
__________
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
1 2
4.3
4.3
SADRAJ
4.3 REKAPITULACIJA ...................................................................................................... 2 4.3.1 SNOP I faza ...................................................................................................... 2 4.3.2 SNOP II faza ..................................................................................................... 2
FER
Unska 3, 1000 Zagreb
Projekt br:
Knjiga br.:
12270-2009
Sekcija:
List: Listova:
2 2
4.3
4.3
REKAPITULACIJA
4.3.1 SNOP I faza Objekt Hotel PRESIDENT Hotel ARGOSY Hotel TIRENA Hotel MINETA Hotel PLAKIR KOTLOVNICA Nadzorni CENTAR SVEUKUPNO: Oprema Radovi Usluge Ukupno
4.3.2 SNOP II faza Objekt Potronja goriva KOTL. Potronja vode OBJEKTI Nadzorni CENTAR SVEUKUPNO: Oprema Radovi Usluge Ukupno