Professional Documents
Culture Documents
Saffar Concrete Qty G-15
Saffar Concrete Qty G-15
Saffar Concrete Qty G-15
Type
Qty
Date
Quantity (M )
Walls
Walls
BS
Walls
T Slab
T Slab
T Slab
23.00
26.00
80.00
23.00
71.00
71.00
71.00
25-2-1435
13-2-1435
13-2-1435
29-1-1435
25-2-1435
13-2-1435
29-1-1435
2 - Jeeda Road
23.00
26.00
80.00
23.00
71.00
71.00
71.00
365
Top Slab
W Walls
Apron Slab
W Walls
Apron Slab
W Walls
W Walls
T Slab
BS
10.00
24.00
7.20
30.00
12.00
6.00
30.00
55.00
19-2-1435
9-2-1435
9-2-1435
24-1-1435
9-2-1435
25-1-1435
9-2-1435
19-2-1435
3 - Hijar Road
10.00
24.00
7.20
30.00
12.00
6.00
30.00
55.00
174
L&R/S Walls
Bot.Slab L&R/S
Total Up To Date
Paid Previous Period
Payable This Period
191.00
191.00
191.00
1,813
1,294
519.00
539.2