DPR Lot
1.22 30.5 0.85 19.465 Unit rate in Rs. Cost in Lakhs Rs. as per Lakhs as per DPR Sl. No. Item Qty. DPR (c) Single phase to three phase conversion (AAC 24.2 50/30 0.75 sq.mm) 18.16 (d) ABC Cable 25 2 50 E Under Ground Cable for Railway/ Road Crossing (a) HT UG Cable (in km) 18.3 9.5 174.135 (b) LT UG Cable (in km) 3.42 3.1 10.602 (c) Pole (PCC) 215 0.06 12.9 F LT Capacitor Installation Lot 23.237 New DTRs
DTR Renovation. ( Installation of LA, Isolator on DTR Primary side and MCCB Panel on DTR Secondary side of the following size of DTR.) Lot 11 kV Line length in Ckt-km. New (ACSR Dog Conductor). 38.6 Reconductoring by Rabbit Conductor. 16 ABC Cable. 35 LT line length in ckt-km New (AAC 50/30 sq.mm) 25 Re-conductoring (AAC 50/30 sq.mm) 22.9
15
1.74
26.1
196
1.45
Item Sl. No . A Revamping of 33/11 kV Substation. DTR Renovation. ( Installation of LA, Isolator on DTR Primary side and MCCB Panel on DTR Secondary side of the following size of DTR.) 11 kV Line length in Ckt-km.
B C
Lot
135.8
New (ACSR Dog Conductor). Reconductoring by Rabbit Conductor. ABC Cable. LT line length in ckt-km New (AAC 50/30 sq.mm) Re-conductoring (AAC 50/30 sq.mm)
38.6 16 35 25 22.9
Unit rate in Cost in Rs. Rs. Sl. No. Item Qty. Lakhs Lakhs as as per per DPR DPR (02-03) (02-03) (c) Single phase to three phase conversion (AAC 24.2 50/30 0.75 sq.mm) 18.16
ABC Cable 25 Under Ground Cable for Railway/ Road Crossing HT UG Cable (in km) 18.3 LT UG Cable (in km) 3.42 Pole (PCC) 215 LT Capacitor Installation Lot New DTRs
50
(a) 315 KVA Rating. 15 1.74 (b) 100 KVA Rating. 196 1.45 G Misc.work(including line maintenance equipment 1 Lot ) TOTAL