SG CONCEPT BUILDER PTE LTD

33 Ubi Avenue 3
#01-54 Vertex Building
Singapore 408868
Tel: 6259 7977, Fax: 6258 7977
Co. Reg.No.201019803W

Our Ref:
Date:

7009-18072013-289-RH-ADI
18/7/2013

ARCHIDEAS DESIGN INC.


#04-01, 204 Bukit Timah Rd.
Singapore 219428
Attention: Mr. Ho Poh Kong
Dear Sir,
BP NO: A1278-01132-2011
PROPOSED ERECTION OF A 3 STOREY SEMI-DETACHED DWELLING HOUSE WITH AN
ATTIC & SWIMMING POOL ON LOT 448T MK 28 AT 719 UPPER CHANGI ROAD EAST
SINGAPORE 486851
RE: PROGRESS CLAIM NO. 19
With reference to the above-mentioned, we are pleased to submit herewith our Progress
Claim No. 19 as follows:
Work Done until 18 July 2013
Add Variation Works
Work Done This Month
Less Retention 5% of Contract Sum

$
$
$
$

770,000.00
770,000.00
(38,500.00)

Unfixed Goods and Materials


Less Retention 20%
Less Retention Certified Sum (PC no. 18)

$0.00
$0.00
(724,789.85)

Total Amount Due

Your early approval will be very much appreciated.


Thank you.
Yours faithfully

Khor Yew Chai


Managing Director
cc

ECG, Mr. Eric Cheng

6,710.15

SG Concept Builder Pte Ltd

PROGRESS PAYMENT STATEMENT


BP NO
PROJECT

:
:

A1278-01132-2011
PROPOSED ERECTION OF A 3 STOREY SEMI-DETACHED DWELLING HOUSE WITH AN ATTIC &
SWIMMING POOL ON LOT 448T MK 28 AT 719 UPPER CHANGI ROAD EAST SINGAPORE 486851

CONTRACT PERIOD
FOR WORK DONE UP TO

:
:

14/09/10 - 14/12/2011 (12 Months)


18/7/2013

PAYMENT REQUEST NO : 19

CONTRACTOR
: SG CONCEPT BUILDER PTE LTD
Contractor GST Registration
: M2-0096664-3
No
PREVIOUS CUMULATIVE

ITEM

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

CONTRACT SUM
(S$)

DESCRIPTION

PRELIMINARIES
$
INSURANCE POLICIES
$
PRECAUTIONARY WORKS
$
PILING WORKS
$
EXCAVATION & EARTHWORKS
$
REINFORCED CONCRETE WORKS
$
METALWORK
$
TIMBER DOORS
$
JOINERY WORKS
$
WALL / COLUMN FINISHES -EXTERNAL PLASTERING
$
WALL / COLUMN FINISHES -INTERNAL PLASTERING
$
TIMBER STRIP / SCREED RENDERING
$
STAIRS FINISH /RAILING
$
CEILING / EAVE
$
ROOFING WORKS AND FINISHES
$
RAINWATER DISPOSAL WORKS
$
PAINTING WORKS
$
EXTERNAL WORKS
$
SWIMMING POOL
$
DEMOLITION WORKS
$
PRECON SURVEY
$
ANTI TERMITE TREATMENT
$
BRICKWORKS
$
ALUMINIUM DOOR/WINDOW/GLAZING
$
TILING WORKS
$
AIR CONDITION & MECHANICAL VENTILATION WORKS
$
ELECTRICAL WORKS
$
SANITARY & PLUMBING WORKS
$
TOTAL SUM
ADD:
UNFIXED GOODS AND MATERIALS 100%
LESS RETENTION AT 20%

31

GROSS VALUE
LESS:
RETENTION (5%)

32

PREVIOUSLY CERTIFIED P.C NO. 1,2,3, 4, 5, 6 ,7, 8, 9, 10


,11, 12, 13, 14, 15, 16, 17 & 18

33
34

ADD

84,500.00
5,000.00
5,000.00
65,000.00
17,000.00
128,000.00
23,000.00
19,800.00
4,000.00
5,000.00
8,000.00
30,000.00
10,000.00
12,000.00
29,000.00
1,000.00
11,000.00
19,000.00
35,000.00
13,000.00
2,000.00
1,700.00
45,000.00
47,000.00
30,000.00
30,000.00
40,000.00
50,000.00
770,000.00

CONTRACTOR'S
REQUEST (S$)
80,275.00
5,000.00
5,000.00
65,000.00
17,000.00
128,000.00
23,000.00
17,820.00
3,200.00
4,900.00
7,840.00
29,400.00
7,500.00
12,000.00
29,000.00
1,000.00
10,450.00
18,050.00
33,250.00
13,000.00
2,000.00
1,700.00
45,000.00
44,650.00
28,500.00
27,000.00
36,000.00
45,000.00
740,535.00

CURRENT MONTH

CONTRACTOR'S
REQUEST (%)

CONTRACTOR'S
REQUEST (S$)

95%
100%
100%
100%
100%
100%
100%
90%
80%
98%
98%
98%
75%
100%
100%
100%
95%
95%
95%
100%
100%
100%
100%
95%
95%
90%
90%
90%

TOTAL CUMULATIVE

CONTRACTOR'S
REQUEST (%)

4,225.00

5%

1,980.00
800.00
100.00
160.00
600.00
2,500.00

10%
20%
2%
2%
2%
25%

550.00
950.00
1,750.00

5%
5%
5%

2,350.00
1,500.00
3,000.00
4,000.00
5,000.00
29,465.00

5%
5%
10%
10%
10%

CONTRACTOR'S
REQUEST (S$)
84,500.00
5,000.00
5,000.00
65,000.00
17,000.00
128,000.00
23,000.00
19,800.00
4,000.00
5,000.00
8,000.00
30,000.00
10,000.00
12,000.00
29,000.00
1,000.00
11,000.00
19,000.00
35,000.00
13,000.00
2,000.00
1,700.00
45,000.00
47,000.00
30,000.00
30,000.00
40,000.00
50,000.00
770,000.00

26,602.00
(5,320.40)
761,816.60

770,000.00

(37,026.75)

(38,500.00)
(724,789.85)

724,789.85

GRAND TOTAL

724,789.85

6,710.15

TOTAL AMOUNT DUE

724,789.85

6,710.15

Input GST

35

FROM :

199753134.xls.ms_office, 1/3/2014

SG CONCEPT BUILDER PTE LTD

CLAIM BY:

Statement

Rowena L. Heresilles / Quantity Surveyor


Name / Signature / Date

CONTRACTOR'S
REQUEST (%)
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

REMARKS