Degree Project 2013/ 2014 Trial Mix Sheet Project Date Place Supervisor Mix Pre-Mixed Concrete Ltd,

Geoffroy Road, Bambous, Mauritius Dr. Chan Chim Yuk Andre / Mr. Gunnoo Vikram Cement % CaCO3 % 225 - 250 Mass kg/m3 Mass kg/ 0.03m3 Low Cementitious Mix for Trenches

Target Slump/ mm

Target 28 days compressive strength 1 MPa Component CEM 1 42,5 Calcium Carbonate, CaCO3 6 / 10 Aggregates (OD) 0,4 Rocksand (OD) Air Entrainer (1 % cement content) Free Water, L Absorbed Water, L Total Water, L Total Slump Test Additional Water, L Time/ min Slump / mm Plastic Density Volume Capacity of Container / m3 Mass of concrete / kg Plastic Density / kgm-3 Uncompacted Compacted %

Uncompacted

Compacted

Observation / Comments