MAGNETI MARELLI SKH EXHAUST SYSTEMS PVT LTD , PUNE PLANT

HOUR PRODUCTION CONTROL SHEET


Machine Part Name Check cycle Robo 1.2 EURO V Manifold Assembly 1 hour Takt Time 140 Seconds Robo 1.4 Part No Hourly target S133651 25 Jobs

SHIFT

START

END

PLAN

CUMULA TIVE ACTUAL PALN

CUMULA TIVE ACTUAL

DIFFERECE

CUMULATIVE DIFFERENCE

REASON

DOWN TIME (MIN)

COUNTER MEASURE

25 06.30 AM 07.30 AM 25 07.30 AM 08.30 AM 25 08.30 AM 09.30 AM 25

25 50 75 100 125 150 175 200

09.30 AM 10.30 AM 25 10.30 AM 11.30 AM 25 12.00 PM 01.00 PM 25 01.00 PM 02.00 PM 02.00 PM 03.00 PM 25

Machine Operator

Team Leader

Engineer In Charge

Manager/Operations

Check cycle

1 hour

Takt Time Hourly target

140 seconds 25

SHIFT

START

END

PLAN

CUMULA TIVE ACTUAL PALN

CUMULA TIVE ACTUAL

DIFFERECE

CUMULATIVE DIFFERENCE

REASON

DOWN TIME (MIN)

COUNTER MEASURE

03.00 PM 04.00 PM 04.00 PM 05.00 PM 05.00 PM 06.00 PM 06.00 PM 07.00 PM 07.00 PM 08.00 PM
08.00 PM 08.30 PM 09.00 PM 09.30 PM

09.30 PM 10.30 PM 10.30 PM 11.30 PM 11.30 PM 00.30 AM 01.30 AM 02.30 AM 03.30 AM 04.30 AM 05.30 AM 00.30 AM 01.30 AM 02.30 AM 03.30 AM 04.30 AM 05.30 AM 06.30 AM

CHECKED (TEAM LEADER)

CHECKED (TEAM LEADER)