Professional Documents
Culture Documents
High Expansion Foam Systems: Semi-Annual Inspection
High Expansion Foam Systems: Semi-Annual Inspection
High Expansion Foam Systems: Semi-Annual Inspection
Semi-Annual Inspection
Date_____________________
Facility_____________________________________________________________
Building_____________________________________________ System No._______________
Checkpoints
N/A
Test each actuating device for electrical continuity without causing the discharge of foam.
Record water pressure at each generator. [
Inspected by_________________________________________________________________
(Print name and company)
Signature_____________________________________________ Date__________________
Copyright 2003 American Institute of Chemical Engineers
Yes
No