High Expansion Foam Systems: Semi-Annual Inspection

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

High Expansion Foam Systems

Semi-Annual Inspection
Date_____________________
Facility_____________________________________________________________
Building_____________________________________________ System No._______________
Checkpoints

N/A

Test each actuating device for electrical continuity without causing the discharge of foam.
Record water pressure at each generator. [

Verify all pipe connections are tight.


Clean all water strainers.
Inspect foam generator screen for tears or clogging.
Verify that system has been restored to full automatic operating condition following all
testing.
Recommendations

Inspected by_________________________________________________________________
(Print name and company)

Signature_____________________________________________ Date__________________
Copyright 2003 American Institute of Chemical Engineers