Professional Documents
Culture Documents
2013 01 30 Techdok
2013 01 30 Techdok
2013-01-30
The connection of a pile head in a concrete structure can be sealed in addition with a rubber flange.
The rubber flange completely embedded in concrete or cement grout is tested up to a water pressure of 6 bars. Mounting onto bars Pile Type GEWI 32 T 40 T 50 T 63 T 63 TR 75 TR GEWIPlus 35 TR 43 TR Required rubber sealing Type 32 36 40 44 50 55 63 69 75 82
Mounting onto corrugated sheathing Pile Type GEWI 32 T 40 T 50 T 63 T GEWIPlus 30 TR 35 TR 43 TR 57 TR & 63 TR 75 TR Corrugated sheathing 56 60 80 100 110 Required rubber sealing Type 50 55 63 69 75 82 90 97 110 121