* Design of Combined footings

* Project :

INPUT
40 cm
Fcu
Fy

qall

t (R.C) =

250
3600

kg/cm

1.2
60

kg/cm

40

cm

kg/cm2
2

cm

40

40

cm

cm

200 t

2.5

100 t

(C.G) OF "R"

OUT PUT
R=P1+P2

300.00

L=2*A+a+2*C=

543.33

cm

1.67 m

Resultant of 2 loads is at:

P.C

Dims. of P.C :

INPUT
qn(Stress on Soil)=Rt/(L*B)=

R.C

GET

A=

qall=R/(L*B)

GET

B= 458.72

from center of small load col

B (cm)

L (cm)

t (cm)

minimum

460

545

25

CHOSEN

DIM design

460

545

11.97

t/m2

Dims. of R.C :

INPUT

1.67

R*A=P2*S

B (cm)

L (cm)

t (cm)

minimum
CHOSEN

410

495

60

DIM design

410

495
210

SKETCH

145cm

210cm

60cm
25cm

65cm
143.333
83.3333

500cm
550cm

143
83.3

(CHECK SHEAR & MOMENT )

fn=(Rt/(A*B)=

14.78

t/m2

Q0=fn*x0*B=

39.39

Q1=P1-fn*x1*B=

36.36

Q2=P2-fn*x2*B=

87.88

Q3=fn*x3*B=

87.88

Qmax=

87.88

(Qmax-fn*B*d)/(0.87*B*d)

27.80

t/m2

q(sh)=

27.80

t/m2

q(allw) =

63.26

t/m2

get

36.36 t

87.88 t

39.39 t
105 cm
65 cm

185 cm
145 cm

t/m2

87.88 t

from eq:
fn*B*X-P2=0.0
X (at Zero Shear)=
3.30
from eq:

100

14.78

SAFE SHEAR

fn*B*X /2-P2*(X-b/2)

M(0,1) (POSITSVE MOM.)=


M(2,3) (POSITSVE MOM.)=

21.89
82.50

t.m
t.m

M(NEGAT) (at Zero Shear)=

0.00

t.m

M(max)=
d = C1 (Mu/(Fcu*b))

82.50
get C1 =

t.m
5.01

330
cm

0.00 m.t

82.50 m.t

SAFE MOMENT

(CHECK PUNNCHING )

200 t

21.89 m.t

dp1=(p1-Ac*fn/10)/(*qallp)=

0.51

m
p1= 200

2.78 FALSE
were

4
Ac=
1

dp2=(p2-Ac*fn/10)/(*qallp)=

0.24

m
p2= 100

Ac=

SAFE PUNCHING UNDER P1


SAFE PUNCHING UNDER P2

4
1

qallp=
fn=

9
14.78

kg/cm2
t/m2

qallp=
fn=

9
14.78

kg/cm2
t/m2

(A)

Top Rft. :

M(NEGAT) (at Zero Shear)=

from table

0.00

SH(401)

t.m

get J =

As=Mu*1.5/(Fy*j*d)

#####

Asmin=0.15*b*d

33.21

Asmin=11*b*d/Fy

67.65

0.826
#DIV/0!

33.21
Asmin=

0.00

33.21

0.00

33.21 cm2

TAKE As/(B)=

Top Rft. :

(B)

J<0.826

get C1 = ####

#DIV/0!

Asmin=1.33*Asreq

( Longitudinal direction )

d = C1 (Mu/(Fcu*b))

no.

12

total no/(B)

/m

34

7.17

Bottom Rft. :

1- COLUMN C1 WERE P1= 200 t


M(2,3) (POSITSVE MOM.)=

from table

82.50

SH(401)

t.m

get J =

As=Mu*1.5/(Fy*j*d)

0.826

J<0.826

get C1 = 5.01
0.826
0.829

77.1

Asmin=0.15*b*d

33.21

Asmin=11*b*d/Fy
Asmin=1.33*Asreq

33.21

67.65

Asmin=

102.50

67.65

67.65

77.07 cm2

TAKE As/(B)=

no.

10

16

Bottom Rft. :

( DESIGN)

d = C1 (Mu/(Fcu*b))

total no/(B)

/m

43

9.35

2- COLUMN C2 WERE P2= 100 t

M(0,1) (POSITSVE MOM.)=

from table

SH(401)

21.89

t.m

d = C1 (Mu/(Fcu*b))

get J =

0.826

J<0.826

get C1 = 9.72

0.826
0.860

As=Mu*1.5/(Fy*j*d)

20.5

Asmin=0.15*b*d

33.21

Asmin=11*b*d/Fy

67.65

Asmin=1.33*Asreq

33.21
Asmin=

27.20

33.21

27.20

33.21 cm2

TAKE As/(B)=

Bottom Rft. :

no.

16

/m

total no/(B)
22

4.03

(A)

Top Rft. :
Top Rft. :

(B)

no.

12

total no/(B)

/m

26

Bottom Rft. :

1- COLUMN C1 WERE P1= 200 t


BEAM WIDTH = (a+2d)=
TAKE (B.W)=

83.48

M (working)=WL2/2 =

t.m
were

W=P/B=

48.78 t/m

&

L=

d = C1 (Mu/(Fcu*b))

from table

SH(401)

get J =

( Transverse direction)

As=Mu*1.5/(Fy*j*d)

( DESIGN)

148 cm
145 cm
1.85 m
get C1 = 2.85

J<0.826

0.727

0.826
0.727

90.30

Asmin=0.15*b*d
Asmin=11*b*d/Fy
Asmin=1.33*Asreq

11.53
6.60

11.53

120.09

6.60

Asmin=

11.53

90.30 cm2

TAKE As/(B)=

Bottom Rft. :

T.no

80

12

total no/(B.W)

145

cm

79.88

2- COLUMN C2 WERE P2= 100 t


BEAM WIDTH = (a+2d)=
TAKE (B.W)=
M (working)=WL2/2 =

41.74

t.m
were

W=P/B=

24.39 t/m

&

L=

d = C1 (Mu/(Fcu*b))

from table

SH(401)

148 cm
145 cm

get J =

As=Mu*1.5/(Fy*j*d)

J<0.826

0.805

1.85 m
get C1 = 4.03
0.826
0.805

40.74

Asmin=0.15*b*d
Asmin=11*b*d/Fy
Asmin=1.33*Asreq

11.53
23.48

11.53

54.19

23.48

Asmin=

23.48

40.74 cm2

TAKE As/(B)=

Bottom Rft. :

T.no

37

12

total no/(B.W)
145 cm
36.04

/M

DRAWING

5f12/M

8f12/M

5f12/M

10f16/M
80f12/145

145cm

5f12/M

5f16/M
145cm

37f12/145

* Design of Combined footings


* Project :

INPUT
40 cm
Fcu
Fy

=
=

qall
=
t (R.C) =

60

cm

250
3600

kg/cm

1.5
60

kg/cm2

40

60

cm

cm

cm

kg/cm2

100 t

2.5

200 t

P.C

(C.G) OF "R"

OUT PUT
R=P1+P2

300.00

L=2*A+a+2*C=
Lmin=

373.33
385.00

cm
cm

Resultant of 2 loads is at:

1.67 m

GET

A=

1.67

qall=R/(L*B)

GET

B=

512.82

from center of small load col

Dims. of P.C :

B (cm)

L (cm)

t (cm)

minimum

515

390

25

0
515

0
390

INPUT

chosen
DIM design

qn(Stress on Soil)=Rt/(L*B)=

14.94

Dims. of R.C :

R.C

R*A=P2*S

INPUT

chosen
DIM design

INPUT LOGIC.DIM WERE B<L

t/m2
B (cm)

L (cm)

t (cm)

465

365

60

0
465

0
365

(CHECK SHEAR & MOMENT )

fn(Stress on R.C)=Rt/(L*B)=

17.68

t/m2

Q0=fn*x0*B=

53.42

Q1=P1-fn*x1*B=

97.26

Q2=P2-fn*x2*B=

67.12

Qmax=

97.26

(Qmax-fn*B*d)/(0.87*B*d)

23.40

t/m2

q(sh)=

23.40

t/m2

q(allw) =

63.26

t/m2

100 t

17.68

t/m2

67.12 t

from eq:
fn*B*X-P2=0.0
X (at Zero Shear)=
1.22

97.26 t

SAFE SHEAR

get

200

53.42 t
125 cm
65 cm

40 cm
m
40.83 m.t

from eq:

fn*B*X /2-P2*(X-b/2)

M(0) (POSITSVE MOM.)=


M(max) (at Zero Shear)=

17.36
40.83

t.m
t.m

d = C1 (Mu/(Fcu*b))

get C1 =

7.58

17.36 m.t

1.22 m

(CHECK PUNNCHING )

SAFE MOMENT

dp1=(p1-Ac*fn/10)/(*qallp)=

0.41

m
p1= 100

2.78 FALSE
were

2.4
Ac=
0.7

dp2=(p2-Ac*fn/10)/(*qallp)=

0.40

m
p2= 200

Ac=

SAFE PUNCHING UNDER P1


SAFE PUNCHING UNDER P2

4.8
1.44

qallp=
fn=

9
17.68

kg/cm2
t/m2

qallp=
fn=

9
17.68

kg/cm2
t/m2

(A)

Top Rft. :

M(max) (working)=

from table

SH(401)

40.83

t.m

d = C1 (Mu/(Fcu*b))

get J =

As=Mu*1.5/(Fy*j*d)

0.826

76.73
50.73

( Longitudinal direction )

Asmin=11*b*d/Fy
Asmin=1.33*Asreq

( DESIGN)

37.67

Asmin=0.15*b*d

37.67

Asmin=11*b*d/Fy
Asmin=1.33*Asreq

76.73

37.67
Asmin=

50.73

50.73

50.73 cm2

TAKE As/(B)=

Top Rft. :

no.

16

total no/(B)

/m

29

5.43

Bottom Rft. :

M(POSITIVE) (working)=

from table

0.826
0.853

38.14

Asmin=0.15*b*d

(B)

J<0.826

get C1 = 7.58

SH(401)

17.36

t.m

d = C1 (Mu/(Fcu*b))

get J =

As=Mu*1.5/(Fy*j*d)

0.826

J<0.826

get C1 = 11.62
0.826
0.863

16.2
37.67
Asmin=

21.57

37.67

21.57

37.67 cm2

TAKE As/(B)=

Bottom Rft. :

no.

16

total no/(B)

/m

4.03

(A)

Top Rft. :
Top Rft. :

(B)

no.

12

total no/(B)

/m

20

Bottom Rft. :
1-INTERIOR COLUMN

M (working)=WL2/2 =

88.19
were

BEAM WIDTH = (a+2d)=


TAKE (B.W)=

t.m
W=P/B= 43.01 t/m

&

L=

d = C1 (Mu/(Fcu*b))

from table

SH(401)

get J =

( DESIGN)

( Transverse direction)

As=Mu*1.5/(Fy*j*d)

get C1 = 2.96

J<0.826

0.739

0.826
0.739

13.12
5.22

13.12

124.72

5.22

Asmin=

Bottom Rft. :

T.no

83

12

2-EXTIRIOR COLUMN

48.56
were

total no/(B.W)

165

cm

BEAM WIDTH = (a+d)=


TAKE (B.W)=

W=P/B= 21.51 t/m

get J =

As=Mu*1.5/(Fy*j*d)

82.96

94 cm
90 cm

t.m
&

L=

d = C1 (Mu/(Fcu*b))

SH(401)

13.12

93.78 cm2

TAKE As/(B)=

from table

2.025 m

93.8

Asmin=0.15*b*d
Asmin=11*b*d/Fy
Asmin=1.33*Asreq

M (working)=WL2/2 =

168 cm
165 cm

J<0.826

0.738

2.125 m
get C1 = 2.95
0.826
0.738

51.7

Asmin=0.15*b*d
Asmin=11*b*d/Fy
Asmin=1.33*Asreq

7.16
14.58

7.16

68.81

14.58

Asmin=

14.58

51.74 cm2

TAKE As/(B)=

Bottom Rft. :

T.no

46

12

total no/(B.W)
90
cm

45.77

DRAWING

/M
5f12/M

6f16/M

5f16/M
46f12/90

90cm

165cm
5f12/M

83f12/165

You might also like