Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 39

COMBINED FOOTING

SBC
Plinth
Pu1

kN/m2

75
1
124

124kN

s1

kN

1.18

75 - gs hplinth =

Pw=

=L

-0.98

3.20 m

59

Select:

(Pu1 + Pu2)
1.45

= 99

kN

)Pw . 1.1(
qall

Area req =

3.00

Pu2
20
kN
S1
3.0
m
(1) Estimate size of footing
= q all

20kN

m2

1.85
L
3.2

2
5.8 m

Area prov
Depth mm
500

B
1.8

>>>
>>>

(2) Estimate C.G of load ( assumption that it will be coincide with C.G of footing
X=

Pu2 . S1
Pu total

= 0.42 m

>>
Less than 0

(3) Draw SF & BM diagram for ultimate loads with upward Qnet =
qu = Qnet . B =

25

1.8

124 kN
1.18 m

Mu top

Mu Bott

25
17
45 kN/m

20

1.18 m
-0.98 m
kN/m2

Ultimate

kN/m

Working

45.00

kN/m

kN

3.0
m

24.1

L=
R=

m-0.98

V max

32

71

Design
Columns

100

fcu = 35 fy = 460

0.2

0.6

Design of Combined footing


64
44

53

50

-50
-71
-100

Bottom Steel
Mu =
32
kN.m
k=
0.003 >>
5
z=
418
mm
As req =
188 Asmin = 1170
11 f
12 @
164

-20

Top Steel
Mu =
24
kN.m
k=
0.002 >>
z=
418
mm
As req =
Asmin = 1170
57
11 f
12 @
164

-30

Max Shear

30
20
10
0
-10

-40

Distance
v1
v2
v3

0
1.18
1.18
4.18

0
53.25
-70.75
64.25

53.25
70.75
64.25

v4
v5

4.18
3.20

44.25
0

44.25
0

0.05

0
0.06

0.0
-0.1

0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6

0.12
0.18
0.24
0.30
0.36
0.41
0.47
0.53
0.59
0.65
0.71

-0.3
-0.7
-1.3
-2.0
-2.8
-3.9
-5.0
-6.4
-7.9
-9.5
-11.3

L
3.2

0.65
0.7
0.75
0.8
0.85
0.9
0.95
1

0.77
0.83
0.89
0.95
1.01
1.07
1.12
1.18

-13.3
-15.4
-17.7
-20.2
-22.8
-25.5
-28.4
-31.5

0.01

1.21

-29.4

1.80
D mm

0.02

1.24

-27.3

0.03

1.27

-25.3

500

0.04
0.05
0.06
0.07

1.30
1.33
1.36
1.39

-23.3
-21.4
-19.5
-17.6

0.08

1.42

-15.8

0.09
0.1
0.11
0.12
0.13

1.45
1.48
1.51
1.54
1.57

-14.0
-12.3
-10.6
-9.0
-7.3

0.14

1.60

-5.8

0.15

1.63

-4.2

0.16
0.17
0.18
0.19

1.66
1.69
1.72
1.75

-2.7
-1.3
0.1
1.5

0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75

1.78
1.81
1.84
1.87
1.90
1.93
1.96
1.99
2.02
2.05
2.08
2.11
2.14
2.17
2.20
2.23
2.26
2.29
2.32
2.35
2.38
2.41
2.44
2.47
2.50
2.53
2.56
2.59
2.62
2.65
2.68
2.71
2.74
2.77
2.80
2.83
2.86
2.89
2.92
2.95
2.98
3.01
3.04
3.07
3.10
3.13
3.16
3.19
3.22
3.25
3.28
3.31
3.34
3.37
3.40
3.43

2.8
4.1
5.4
6.6
7.8
8.9
10.0
11.0
12.0
13.0
13.9
14.8
15.7
16.5
17.2
18.0
18.7
19.3
19.9
20.5
21.0
21.5
21.9
22.3
22.7
23.0
23.3
23.5
23.7
23.9
24.0
24.1
24.1
24.1
24.1
24.0
23.8
23.7
23.5
23.2
22.9
22.6
22.2
21.8
21.4
20.9
20.4
19.8
19.2
18.5
17.8
17.1
16.3
15.5
14.7
13.8

0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
0.8
0.85
0.9
0.95
1

3.46
3.49
3.52
3.55
3.58
3.61
3.64
3.67
3.70
3.73
3.76
3.79
3.82
3.85
3.88
3.91
3.94
3.97
4.00
4.03
4.06
4.09
4.12
4.15
4.18
4.13
4.09
4.04
3.99
3.94
3.89
3.84
3.79
3.74
3.69
3.64
3.59
3.54
3.50
3.45
3.40
3.35
3.30
3.25
3.20

12.8
11.9
10.8
9.8
8.7
7.6
6.4
5.2
3.9
2.6
1.3
-0.1
-1.5
-3.0
-4.5
-6.0
-7.6
-9.3
-10.9
-12.6
-14.4
-16.2
-18.0
-19.8
-21.8
-19.6
-17.6
-15.7
-13.9
-12.2
-10.7
-9.2
-7.8
-6.6
-5.4
-4.4
-3.5
-2.7
-2.0
-1.4
-0.9
-0.5
-0.2
-0.1
0.0

Strip Footing Design - 3 cloumns


kN/m2
SBC
70
h filling
1.05
m
Pu1
721
kN
Pu2
2085
kN
Pu3
720
kN
S1
1.0
m
S2
1.6
m
-g
h
70
s plinth = 53.2
= qall
kN/m2
(1) Estimate size of footing
Pw = (Pu1+Pu2+Pu3)/(1.45) =

721kN

2085kN
s2

s1

L
0.88

0.99

=L

kN
720

1.61 m

0.52

Area prov =

52

m2

0.88
0.52

m
m

4m

2432

kN
m2
50.3
Depth(m)
0.4

Area req = Pw*1.1/qnet =


Select:
L
B
4
13

>>>

(2) Estimate C.G of load ( assumption that it will be coincide with C.G of footing
X =(P2*s1+P3*(s1+s2))/p total =

1.12

L=
R=

Note : X start from Column 1

(3) Draw SF & BM diagram for ultimate loads with upward Q net =
68 =

qu = Qnet . B =

68
47

13 x

882 kN/m

721

2085

kN/m2 ult
kN/m2 work

720

(4) RESULTS:

882

Mu top

-834

Mu bottom

kN.m

V max

kN.m

1154

kN/m

kN

Note: Moments/Shear are for total width (B)

1500
1000

931

779

500

58
1

0
-500 0

-1000

265
0
4
-455

-1154

-1500
2000
1500

1000
500
0

-500
-1000

0.5

1.5

2.5

3.5

4.5

Mu
L/4

0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9

0
0.09
0.18
0.27
0.35
0.44
0.53
0.62
0.71
0.80

0
-3
-14
-31
-55
-86
-124
-169
-220
-279

1
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
0.11
0.12
0.13
0.14
0.15
0.16

0.88
0.89
0.90
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04

-344
-345
-345
-346
-347
-348
-349
-350
-352
-353
-354
-356
-357
-359
-361
-363
-364

0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32

1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20

-366
-369
-371
-373
-375
-378
-380
-383
-386
-388
-391
-394
-397
-400
-403
-407

0.33
0.34
0.35
0.36
0.37
0.38
0.39

1.21
1.22
1.23
1.24
1.25
1.26
1.27

-410
-414
-417
-421
-425
-428
-432

L/2
L
L+s*..05
L+s*..06
L+s*.3
L+s*.4
L+s*.5
L+s*.6
L+s*.7
L+s*.8
L+s*.9

L+s1+(s2/8)

-582.58

0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94

1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59
1.60
1.61
1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69
1.70
1.71
1.72
1.73
1.74
1.74
1.75
1.76
1.77
1.78
1.79
1.80
1.81

-436
-440
-444
-449
-453
-457
-462
-467
-471
-476
-481
-486
-491
-496
-501
-506
-512
-517
-523
-528
-534
-540
-546
-552
-558
-564
-570
-577
-583
-589
-596
-603
-609
-616
-623
-630
-637
-644
-652
-659
-667
-674
-682
-689
-697
-705
-713
-721
-729
-737
-746
-754
-763
-771
-780

0.95
0.96
0.97
0.98
0.99
1
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49

1.82
1.83
1.84
1.85
1.86
1.87
1.89
1.91
1.92
1.94
1.95
1.97
1.99
2.00
2.02
2.03
2.05
2.07
2.08
2.10
2.12
2.13
2.15
2.16
2.18
2.20
2.21
2.23
2.24
2.26
2.28
2.29
2.31
2.32
2.34
2.36
2.37
2.39
2.40
2.42
2.44
2.45
2.47
2.49
2.50
2.52
2.53
2.55
2.57
2.58
2.60
2.61
2.63
2.65
2.66

-789
-797
-806
-815
-824
-834
-815
-797
-779
-761
-743
-726
-709
-692
-676
-659
-643
-627
-611
-596
-580
-565
-551
-536
-522
-508
-494
-480
-467
-453
-440
-428
-415
-403
-391
-379
-367
-356
-345
-334
-323
-313
-302
-292
-282
-273
-264
-254
-246
-237
-229
-220
-212
-205
-197

0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1
0.1
0.2
0.3
0.4

2.68
2.69
2.71
2.73
2.74
2.76
2.78
2.79
2.81
2.82
2.84
2.86
2.87
2.89
2.90
2.92
2.94
2.95
2.97
2.98
3.00
3.02
3.03
3.05
3.07
3.08
3.10
3.11
3.13
3.15
3.16
3.18
3.19
3.21
3.23
3.24
3.26
3.27
3.29
3.31
3.32
3.34
3.35
3.37
3.39
3.40
3.42
3.44
3.45
3.47
3.48
3.54
3.59
3.64
3.69

-190
-183
-176
-169
-163
-157
-151
-145
-140
-135
-130
-125
-120
-116
-112
-108
-105
-101
-98
-95
-92
-90
-88
-86
-84
-82
-81
-80
-79
-78
-78
-78
-78
-78
-79
-79
-80
-81
-83
-84
-86
-88
-91
-93
-96
-99
-102
-106
-109
-113
-117
-95
-75
-58
-42

0.5
0.6
0.7
0.8
0.9
1

3.74
3.79
3.85
3.90
3.95
4.00

-29
-19
-11
-5
-1
0

v1
v2
v3
v4
v5
v6
v0

0.88
0.88
1.87
1.87
3.48
3.48
4.00

778.9625
57.9625
930.6475
-1154.35
264.8625
-455.138
0

Distance
0
0.88

Mu
0
-344.2

0.817924
1.87
3.18321
3.48
4

-342.3
-833.5
-77.7
-117.5
0

0
778.9625
57.9625
930.6475
1154.353
264.8625
455.1375
0

Strip Footing Design - 4 cloumns


kN/m2
130
1
m
479
kN
755
kN
668
kN
678
m
3.8
m
m
3.7
m
3.7
qall =
130 -gs hplinth = 114
kN/m2
(1) Estimate size of footing
Pw = (Pu1+Pu2+Pu3+Pu4)/(1.45) =

SBC
h filling
Pu1
Pu2
Pu3
Pu4
S1
S2
S3

479kN

755kN

668kN

kN
678

s2

s1

0.99

3.80

s3

3.70
m

1.79

Area req = Pw*1.1/qnet =


Area prov =
17.2
Select:
L
B
Depth(m) >>>
14
1.3
0.4
>>>
(2) Estimate C.G of load ( assumption that it will be coincide with C.G of footing)
X = [ Pu2 .s1 + Pu3 .(s1+s2) + Pu4 . (s1+s2+s3) ] /(1.45) =
>>
L=
Note : X start from Column 1
>>
R=

18.2

m2

6.01
0.99
1.79

m
m
m

(3) Draw SF & BM diagram for ultimate loads with upward Q net =
qu = Qnet . B =
142 =
1.3 x
184 kN/m

142
98

kN/m2 ult
kN/m2 work

479
0.99

=L

1779

755
3.8

3.72 m

14.00

kN
m2

668

678

3.7

3.7

1.79
184

kN/m

(4) RESULTS:

Mu bottom
Shear

-296

kN.m

147

Mu top

kN.m

Vu max

kN

404

Note: Results for total width (B)

500
404

250

349

335

183

0
0

-250

0
2

-296

10

12

16

14

16

-329

-333

-351

14

-500

Moment

320

0
0

-320

10

12

SHEAR CALCULATION
V
0
0
v1
0.99
182.8914
v2
0.99
-296.109
v3
4.79
404.1771
v4
4.79
-350.823
v5
8.51
334.72
v6
8.51
-333.28
v7
12.21
348.5771
v8
12.21
-329.423
v9
14.00
0

MOMENT
0
182.8914
296.1086
404.1771
350.8229
334.72
333.28
348.5771
329.4229
0

0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39

0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95

0.96
0.97
0.98
0.99
1
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51

0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1
0.01
0.02
0.03
0.04
0.05
0.06
0.07

0.08
0.09
0.1
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63

0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1

0
0.10
0.20
0.30
0.40
0.50
0.60
0.69
0.79
0.89
0.99

0.00
-0.91
-3.63
-8.17
-14.52
-22.69
-32.67
-44.47
-58.08
-73.51
-90.75

1.03
1.07
1.11
1.14
1.18
1.22
1.26
1.30
1.33
1.37
1.41
1.45
1.49
1.52
1.56
1.60
1.64
1.68

-80
-69
-58
-48
-38
-28
-19
-9
0
8
17
25
33
41
48
55
62
69

1.71
1.75
1.79
1.83
1.87
1.90
1.94
1.98
2.02
2.06
2.09
2.13
2.17
2.21

75
81
87
92
98
103
107
112
116
120
124
127
130
133

2.25
2.28
2.32
2.36
2.40
2.44
2.47

136
138
140
142
143
145
146

2.51
2.55
2.59
2.63
2.66
2.70
2.74
2.78
2.82
2.85
2.89
2.93
2.97
3.01
3.04
3.08
3.12
3.16
3.20
3.23
3.27
3.31
3.35
3.39
3.42
3.46
3.50
3.54
3.58
3.61
3.65
3.69
3.73
3.77
3.80
3.84
3.88
3.92
3.96
3.99
4.03
4.07
4.11
4.15
4.18
4.22
4.26
4.30
4.34
4.37
4.41
4.45
4.49
4.53
4.56
4.60

146
147
147
147
147
146
145
144
143
141
139
137
135
132
129
126
122
118
114
110
105
101
95
90
84
78
72
66
59
52
45
37
30
22
13
5
-4
-13
-23
-32
-42
-52
-63
-73
-84
-96
-107
-119
-131
-143
-156
-169
-182
-195
-209
-223

4.64
4.68
4.72
4.75
4.79
4.83
4.87
4.90
4.94
4.98
5.02
5.05
5.09
5.13
5.16
5.20
5.24
5.28
5.31
5.35
5.39
5.42
5.46
5.50
5.54
5.57
5.61
5.65
5.69
5.72
5.76
5.80
5.83
5.87
5.91
5.95
5.98
6.02
6.06
6.09
6.13
6.17
6.21
6.24
6.28
6.32
6.35
6.39
6.43
6.47
6.50
6.54
6.58
6.62
6.65
6.69

-237
-251
-266
-281
-296
-283
-270
-258
-246
-234
-222
-211
-200
-189
-178
-168
-158
-148
-138
-129
-120
-111
-102
-94
-86
-78
-71
-63
-56
-50
-43
-37
-31
-25
-19
-14
-9
-4
0
4
8
12
16
19
22
25
27
29
31
33
34
36
37
37
38
38

6.73
6.76
6.80
6.84
6.88
6.91
6.95
6.99
7.02
7.06
7.10
7.14
7.17
7.21
7.25
7.28
7.32
7.36
7.40
7.43
7.47
7.51
7.55
7.58
7.62
7.66
7.69
7.73
7.77
7.81
7.84
7.88
7.92
7.95
7.99
8.03
8.07
8.10
8.14
8.18
8.21
8.25
8.29
8.33
8.36
8.40
8.44
8.48
8.51
8.55
8.59
8.62
8.66
8.70
8.73
8.77

38
37
37
36
35
34
32
30
28
26
23
20
17
13
10
6
2
-3
-7
-12
-17
-23
-29
-35
-41
-47
-54
-61
-68
-76
-83
-91
-100
-108
-117
-126
-135
-145
-154
-164
-175
-185
-196
-207
-218
-230
-242
-254
-266
-254
-242
-230
-219
-208
-197
-186

8.81
8.85
8.88
8.92
8.96
8.99
9.03
9.07
9.10
9.14
9.18
9.22
9.25
9.29
9.33
9.36
9.40
9.44
9.47
9.51
9.55
9.59
9.62
9.66
9.70
9.73
9.77
9.81
9.84
9.88
9.92
9.96
9.99
10.03
10.07
10.10
10.14
10.18
10.21
10.25
10.29
10.33
10.36
10.40
10.44
10.47
10.51
10.55
10.58
10.62
10.66
10.70
10.73
10.77
10.81
10.84

-176
-165
-155
-146
-136
-127
-118
-110
-101
-93
-85
-77
-70
-63
-56
-49
-43
-37
-31
-25
-20
-15
-10
-5
-1
3
7
11
14
17
20
23
25
27
29
31
32
33
34
35
35
35
35
35
34
33
32
31
29
27
25
22
20
17
14
10

10.88
10.92
10.95
10.99
11.03
11.07
11.10
11.14
11.18
11.21
11.25
11.29
11.32
11.36
11.40
11.44
11.47
11.51
11.55
11.58
11.62
11.66
11.69
11.73
11.77
11.81
11.84
11.88
11.92
11.95
11.99
12.03
12.06
12.10
12.14
12.18
12.21
12.39
12.57
12.75
12.93
13.11
13.28
13.46
13.64
13.82
14.00

6
2
-2
-6
-11
-16
-21
-26
-32
-38
-44
-51
-58
-65
-72
-79
-87
-95
-103
-112
-120
-129
-139
-148
-158
-168
-178
-189
-199
-210
-222
-233
-245
-257
-269
-282
-294
-238
-188
-144
-106
-74
-47
-26
-12
-3
0

Strap footing
In accordance with BS8110
Design will be done for
kN

Pw1=
Pw2=

L1=

Pu1
Pu2
S
L1
SBC
h filling

402
763.5
3.9
2.1
110

kN

kN/m2

qall =

0.75

x
L2
B2

0.3
1.80
1.80

ex=
R1
R2
Areq

B1

2.50

277 kN
527 kN
1.92 m

Strap beam and F1 only

Pu1 402

Recommended

m
m

B=
Aprov

0.75 m
498
668
3.85
1.84
5.25

kN

kN
m2

B1

m
m2

Net upward pressure for F1/ F2

237.0
371.0

0.3

kN/m
kN/m

Per total B1
Per total B2

Design

fcu 30

Strap Beam Design


H
600
b=
300
Mu =
201.0
k=
0.074
z=
500
As req =
1099
As min=
360
Footing F1 Design
Columns
0.2
L

2.1

2.50

Net Q1 =
Mu =
k=
z=
As req =
As min=

95
43
0.025
228
513
390

F2

F1

>>>
Net Q1 =
Net Q2 =

763.5

Pu2

98 kN/m2

0.75
R1=

3.15
498

R2= 668

fy 420

cover =

50

mm
Pu2

Pu1

mm
mm
kN.m
237

mm

1.40

4 f
2f

Top
Bott

20
16

0.9

0.9

429.6
71.1

x
D

371

1.2

0.40

95.7

0.4
-330.9

mm

300
kN/m

-333.9

-220.4

-201.0

kN.m
-86.1

mm

Both way

5 f 12
12 @ 200

10.7
Note:SF/BM diagrams are not to scale

150.3

Calculation for moment & Shear


M1 10.7

V1 71.1

M2 -220.3

V2 -330.9

M3 -201.0

V3 95.7

M4 -86.1

V4 429.6

M5 150.3

V5 -333.9

M6 0.0

V6 0.0

footing SLAB
In accordance with BS8110

Design
Columns
L

2.30

Net Q1 =
Mu =
k=
z=
As req =
As min=

fcu 35
0.25

0.25

184
77
0.038
228
844
390

fy 460

mm

300
kN/m2
kN.m
mm

Both way

8
12

12
125

cover =

50

mm

Footing Beam Design


Input Data
Mu
b
h
fcu
fy
Span
Vu

k=

Results
1376
700
900
35
460
5.8
888

Shear
@ 200
Defl
OK
Steel
12 f
25
12 f
25

769
769

As

d'

50

mm

As'

mm
mm

z must be < 0.95 d


OK

( 0.25- K/9 ]
Tension Steel
As req.=
850 mm
4472
0.156
10 f
Asprov=
807.5 mm
4909
Or Enter As
12 f
Asprov=
5890

d
=
K'
=
0.95 d =

As'

0.078
z=
z=

z = d [ 0.5 +

Mu
0.87 fy. z

As =

m
KN

Mu
bd2 fcu

d'

Singly Reinforced Beam

KN.m
mm
mm 2
N/mm
N/mm2

Single

25
mm2
25
mm2

K' fcu b d2
0.87 fy. z

As =

Compression Steel
As' req.=
0
0 f
As'prov=
0
12 f
As'prov=
5890

mm

(K-K') fcu b d2
0.87 fy. (d-d')

mm

25
mm2
25
mm2
Double

Input For shear


Asv =
Links f
Legs

2
301.6 mm

8 mm
6

v < 0.8 fcu =


v <
v=

Vu
bd

v c = 0.79 [
v c=

100As
bvd

0.66

N/mm2

1.492

OK

1
4

1
3

1
3

] . [ 400 ] . [ fcu ] . 1
d

25

gm

N/mm

4
=0
0
10
0A=
s

4.73
5

N/mm2
N/mm2

0.47 >1 , Use 1.0

0.82 <3, Use

0.82

0.5 vc < v < vc+0.4 or vc+.4<v<0.8 fcu


Sv =
208
mm
Results >>>>>>>>>>>>>>>>>Provide Stirrups Y
DEFELCTION CONTROL:
Basic def=

fs =

5 fy As req
8 As prov

MF compr = 1 +

mm

Finish

Beam condition (Cantilever,Simply,Continous)


( 7
, 20
, 26
)
Span =
5.8
Allowable defelction=Basic .MFtension . MFcompresion

23

100As'prov
bd / ( 3+

8 @ 200

100As'prov
)bd

fs =
218.271
MF tension
1.15 <= 2
MF compr
1.25 <= 1.5

As prov =

5890

As'prov =

5890

MFtension =

1.15

Allowable deflection = 32.9

MFcompr =

1.25

Actual deflection

OK

= 6.8

You might also like