LIST ABNORMALITY in April 2009

Date April 16th No. 1 2 3 4 5 6 7 Area Mill Area Block mill Area Block mill area Mill Area Mill Area B Mill Area B Finishing Area B

LIST ABNORMALITY in April 2009


Abnormality Percikan air pendingin roll std 6 mengarah ke selatan air rawan masuk ke cellar #2 (Operation) sisa cobble belum diambil dibelakang modul block mill (Operation) selang untuk dozing valve std 26 ada bocor sehingga oli bocor (Operation) pipa air untuk std 5 masih bocor, air rawan masuk ke cellar 2 clamp untuk pipa charging pusher power pack ada kendor tanki power pack billet rack dan charging pusher kotor Hydraulic cylinder finger plate bocor

Remarks (Close or not close)

Closed Closed

Closed Closed Closed

Abnormality Compliance (April 1st - 20th)


Area Mill Area Block Mill Area Finishing Area Total Line A Line B Line A Line B Line A Line B 86 46 53.49% 12 11 91.67% 20 13 65.00% Abnormality 54 Compliance (Done) 22 40.74%

Abnormality Compliance Diagram


60

Abnormality & Compliance

50 40 30 20 10 0
Mill Area Block Mill Area Finishing Area

Abnormality Compliance