INSTRUMENT MECHANICAL COMPLETION CHECK SHEETS

SANTOS (SAMPANG ) PTY LTD

LADDER AND TRAY

Project Name Customer Drawing Reff. / Rev P&ID No. / Rev Location / Area

: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (Sampang) Pty. Ltd. : : : System / Sub No. System Desc. Sub System Desc. : : : Tag No. I02MC

No.

Inspection Check List

1 2 3 4 5 6 7 8 9 10 11 12

Check ladder / tray material meets the specification Check ladder / tray route is in accordance with design drawings Check that the installation conforms to installation details Check that laddder / tray support arrangements are adequate conform to drawing Confirm the correct segregation exists between Power, Control, Non-IS and IS cable systems as per project specifications Check no nuts or bolts are missing and correctly tightened Confirm all rough edges and burrs removed and not a hazard to personnel Check for grounding connection already installed and tightened Cable covers are fitted properly where applicable Confirm ladder / tray to transit alignment correct

Notes :

Description Company

Performed by

Witnessed / Approved by

Witnessed / Approved by

Signature

Print Name Date