CMPak OMCR Daily Report - Day - 22 DEC 2012
CMPak OMCR Daily Report - Day - 22 DEC 2012
Remarks -
Expansion
Current Configuration Proposed Configurati BSC E1 requirement met On site caller/Subcon
Project Category:
S No. 1 2 3 4 5 Site ID-Site Name 2308 1144 3921 2062
Rollout
BSC BSC 26 BSC 27 BSC 26 BSC 25 E1 On site requiremen caller/Subcon t met 2 E1 ahsan naeem 2 E1 2 E1 2 E1 ahsan naeem ahsan naeem ahsan naeem Caller no. Integration Done yes yes yes yes
Project Category:
S No. 1 2 3 Site ID-Site Name 0899
Swap
Current Configuration S-433_888 BSC BSC 27 E1 provided/ checked 4 E1 On site caller/Subcon rafeeq /EES Caller no. 03335947494
2 7
aily Report_Day
Caller no. Expansion DoneHard/Soft Remarks/Expansion not done due to
Remarks site integrated with call testing site integrated but only GTMU site integrated but only GTMU site integrated with call testing
Current Handler
Issue Status
3 7
Auxillary
Caller Name/Dept-Company gulam murtaza /netkom ahsan naeem /huawei ali (cmpak) atta Abassi ahsan iqbal /huawei ahsan ali /huawei sabir /netkom fahad /huawei atta Abassi asif hameed/huawei Kuzam /huawei atta Abassi gulam abass/Netkom shqkoor /intersses