Project category Requested Completed Pending # of Expansion sites 0 0 0 # of Rollout sites 0 0 0 # of Swap sites 0 0 0

Remarks -

CMPak OMCR Daily Report_Day


Project Category:
S No. 1 2 3 Site ID-Site Name

Expansion
Current Configuration Proposed Configurati BSC E1 requirement met On site caller/Subcon

Project Category:
S No. 1 2 3 4 5 Site ID-Site Name 2308 1144 3921 2062

Rollout
BSC BSC 26 BSC 27 BSC 26 BSC 25 E1 On site requiremen caller/Subcon t met 2 E1 ahsan naeem 2 E1 2 E1 2 E1 ahsan naeem ahsan naeem ahsan naeem Caller no. Integration Done yes yes yes yes

Project Category:
S No. 1 2 3 Site ID-Site Name 0899

Swap
Current Configuration S-433_888 BSC BSC 27 E1 provided/ checked 4 E1 On site caller/Subcon rafeeq /EES Caller no. 03335947494

TOP Issues & Risks


No. Top1 Top2 Top3 Issue/Risk Description Issue Owner

2 7

aily Report_Day
Caller no. Expansion DoneHard/Soft Remarks/Expansion not done due to

Remarks site integrated with call testing site integrated but only GTMU site integrated but only GTMU site integrated with call testing

X-Connects X-Connects checked from Zong from site 12:50 12:55

Cutover Completed (Time) 16:30

Remarks 2 RRU still faulty at site

Current Handler

Target resolution date

Issue Status

3 7

CMPak OMCR Daily Report_Day


Project Category:
S No. 1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Site ID/Site Name 1435 2062 1701 1435 0896 0888 2351 0901 1268 2351 0298 0414,0413 2116 0413

Auxillary
Caller Name/Dept-Company gulam murtaza /netkom ahsan naeem /huawei ali (cmpak) atta Abassi ahsan iqbal /huawei ahsan ali /huawei sabir /netkom fahad /huawei atta Abassi asif hameed/huawei Kuzam /huawei atta Abassi gulam abass/Netkom shqkoor /intersses

OMCR Daily Report_Day


Reason for call site status verification roll out site status /active alarm modification polarity change site status verification alarm verification and modification ATP alarm verification and modification ATP alarm modification polarity change alarm verification and modification ATP site status verification alarm verification and modification ATP alarm verification and modification ATP site status verification alarm verification and modification site status verification 05:30 PM to 06:15 PM 04:14 PM to 04:30 PM 04:48 PM to 05:14 PM 03:28 PM to 03:37 PM 01:40 PM to 01:50 PM 01:55 PM to 02:22 PM call time for ATP