Scope
These Regulations shall apply for tariff of Renewable Sources of Energy to be determined by Commission u/s 62 and 79 of EA,2003. These Regulations shall apply in case of wind power, small hydro, biomass power, non-fossil fuel based cogeneration, Solar PV, solar Thermal subject to fulfillment of certain eligibility criteria.
Eligibility Criteria
Wind Power: - Annual mean wind power density 200 W/m2 Small hydro: - Capacity 25 MW at single location Biomass: - Plants based on Rankine Cycle technology. - Fossil fuel restricted to 15% of total fuel consumption on annual basis. Solar PV & Thermal : Based on technology approved by MNRE. Non Fossil fuel Co-generation : Power generation and utilization of thermal heat for other industrial activities.
Tariff Structure
-Single Part Tariff -Fixed Cost Component:
ROE Interest on term loan Depreciation Interest on working capital O&M Expenses
-RE Technologies having fuel component like Biomass, non-fossil fuel cogeneration shall have two componentFixed Cost and fuel cost.
Tariff Design
Useful Life 25 25 35 35 20
7
13 25 13 35 13
Dispatch Principles
All RE Power except biomass plants with capacity of 10 MW and above and non-fossil fuel cogeneration plants shall be treated as MUST RUN. Biomass plants of 10 MW and above and Non-fossil fuel cogeneration plants shall be subjected to scheduling & Despatch code as per IEGC and UI Regulations.
Financial Principles
Capital Cost
Plant & machinery, Civil work Erection & Commissioning Financing, IDC Evacuation infrastructure upto interconnection point.
For project specific tariff determination, breakup of capital cost to be submitted to Commission.
Financial Principles
Debt:Equity
Financial Principles
Interest on Working Capital(IWC): Wind Energy/Small Hydro/Solar PV/SolarThermal.
- O&M : 1 month - Receivables : 2 months - Maintenance Spares :15% of O&M
IWC shall be average of SBI ST PLR during previous year plus 100 basis point.
11
Financial Principles
O&M:
First year of Control Period: As specified under Regulations. Subsequent year to be escalated @ 5.72% per annum.
12
100 % 90 %
0% 10 %
80% 70%
60% 50%
20% 30%
40% 50%
14
Other States: Biomass Plant: Non-fossil fuel cogeneration: Solar PV Plant: Solar Thermal :
Rs. 525.97 lakh/MW < 5 MW Rs. 478.16 lakh/MW for 5 MW to 25 MW. Rs. 426.03 lakhs/MW Rs. 421.30 Lakh/MW. Rs.1442 Lakh/MW. Rs. 1500 lakh/MW
The above capital cost shall be subject to specific indexation mechanism for three years.
15
Wind Energy :
Small Hydro:
Other States:
Rs. 19.00 lakhs/MW < 5 MW Rs. 13.41 Lakh/MW for 5 MW to 25 MW. Solar PV Project:Rs. 10.06 lakh/MW. Solar Thermal : Rs 14.53 lakh/MW Biomass: Rs. 22.63 Lakh/MW
Non-fossil Cogeneration:
16
17
HP,UK,NE States
Other States
PV Thermal During Stabilization
- 30%
- 19% - 23% - 60%
- 70%
- 80 %
18
Calculated Tariff
Technology CUF Levelised Tariff(CERC)
Wind Energy 200-250 W/m2 250-300 W/m2 300-400 W/m2 >400 W/m2 Solar Thermal Energy Solar PV Energy Small Hydro Energy
>5 MW HP, NE, hills, 5-25 MW HP, NE, hills >5 MW other state 5-25 MW other state
45% 45% 30% 30% 1st Year 65%, 2nd year 80%
Thank You