SEA-TO-SKY HIGHWAY IMPROVEMENT PROJECT

MANHOLES, PIPING AND UTILITIES


LOCATION: SEGMENT #: DWG # / Rev #: SECTION #: Check for Changes (Yes / No):
Foreman Check Engineer Check Compliance (Y/N) Date

DESCRIPTION Materials Latest IFC, RFI, FDC checked? Indicate. Line drawing generated? (attach copy) Receiving reports completed for material, reviewed/filed mill certs, test results, etc ( attach copy of receiving report) Installation Correct MH or CB installed (size, pipe size) Location laid out and checked (survey sign-off) CB / MH set to grade and line. Grade /Elev ______ Bedding/backfill lift thickness 150mm per lift Inlet/Outlet structure treatments Material Testing Bedding/backfill material meets SS 303-A Compaction to 95% Std Proc (no compaction 300mm above pipe) testing) (QA __.

Superintendent:

Signature:

Date:

NOTES, COMMENTS, NCRS:

QC_DBFO_007

Rev. 0

July 2005