Project: Description:

Steel #3 Grade 40 DEF #3 Grade 60 DEF #4 Grade 60 DEF #6 Grade 60 DEF #8 Grade 60 DEF Total Grand Total: Covered areas: Ground Floor slab First Floor Slab Roof Slab Total:

28-M, DHA Lahore Summary of Steel Quantities


All Columns 300 0 500 850 0 1,650 12,850 Kg Basement Floor RCC Walls 150 1,050 600 0 1,950 Ground Floor Slab & Beams Lintels 100 500 100 100 900 300 100 400 0 300 1,200 1,600 First Floor Slab & Beams Lintels 550 2,500 1,650 650 950 6,300 Roof Slab & Beams

Lintels 50 50 50 0 0 150

sft sft sft sft