Productivity Improvement using Flow & Work Station Design

Discrete Process
Spaghetti Chart Before

Vegetables Processing & Packaging unit


Spaghetti Chart After

Assembly

Process Before & After

Crates pushed in the pack-house

Use of trolleys

Wrongly Placed brooms

Correctly placed brooms

Work station Before

Work station After

Results

Before Kaizen After Kaizen Man power in Work station Production in kg / man hour Floor area (m2)

% Improvement

17
6.2 4.49

11
7.1 1.92

35 %
14.5 % 57 %