Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

1/27/2014

1200 MW Teesta - III HEP, Sikkim Chute Spillway - Control Block - Environmental Flow Arrangement

GULLU HEP (2X12 MW) Dia of HUME PIPE @ end of TRC For two pipes V=1/n*(A/P)(2/3)*S1/2 Discharge to be passed (2 Units) Qd Manning's coefficient n Diameter of pipe d cross sectional area of pipe A wetted perimeter P R Hydraulic Radius (A/P) Length of Pipe L Slope of the Channnel S velocity in channel V Discharge passing through 1 pipe Qp Discharge passing through 2 pipes For One pipe V=1/n*(A/P)(2/3)*S1/2 Discharge to be passed Qd Manning's coefficient n Diameter of pipe d cross sectional area of pipe A wetted perimeter P R Hydraulic Radius (A/P) Length of Pipe L Slope of the Channnel S velocity in channel V Qp Discharge passing through 1 pipe Mannings 13.5 cumec 0.018 1.8 m 2.545 m2 5.655 m 0.45 m 30 m 0.033 5.956 m/sec 15.16 cumec Mannings 13.5 cumec 0.018 1.2 m 1.131 m2 3.77 m 0.3 m 30 m 0.033 4.546 m/sec 5.141 cumec 15.42 cumec

IS :7784 Table-5

Pipe can pass Discharge

IS :7784 Table-5

Pipe can pass Discharge

1/27/2014

1200 MW Teesta - III HEP, Sikkim Chute Spillway - Control Block - Environmental Flow Arrangement

GULLU HEP (2X12 MW) Dia of HUME PIPE For One pipe V=1/n*(A/P)(2/3)*S1/2 Discharge to be passed Qd Manning's coefficient n Diameter of pipe d cross sectional area of pipe A wetted perimeter P R Hydraulic Radius (A/P) Length of Pipe L Slope of the Channnel S velocity in channel V Qp Discharge passing through 1 pipe Mannings 13.5 cumec 0.018 1.8 m 2.545 m2 5.655 m 0.45 m 30 m 0.033 5.956 m/sec 15.16 cumec

IS :7784 Table-5

Pipe can pass Discharge

You might also like