PROPOSED COMPLETION OF MEDICAL TRAINING CENTRE WP

ITEM N0.11 RV/BRO-002 JOB N0. 1477H


MATERIAL ON SITE
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P

Cement
Building Sand
Ballast
Hardcore
Building Stones
Y8 Reinforcement Bars
Y10 Reinforcement Bars
Y12 Reinforcement Bars
Y16 Reinforcement Bars
Y20 Reinforcement Bars
Y25 Reinforcement Bars
Assorted Timber
Marine Ply
Binding Wire/Hoop Iron
Pvc Adhesive Glue
Ceramic Tiles (400x400x12mm
Thick)
Q D.P.C
R Curtain Rails
S Nails (3 & 4)
T White Cement
U Lime/White Wash (25kgs)
V Red Oxide
W Terrazo Chips
X Window Stays
Y Rhs,Shs & Assorted Metals
Z Black Sheet 2440x1220x16g
1 Bush Hinges 40mm
2 Decra Tiles Placed Order

QTY
480
880
850
300
4200
950
810
450
140
185
320

RATE
1000
2000
2000
900
50
374
583
839
1493
2311
3648

20
4
24

UNIT
Bags
Tons
Tons
Tons
Ft
Length
Length
Length
Length
Length
Length
Value
Pcs
Rolls
Gallons
Boxes

4
21
100
14
14
28
10
35

Rolls
Pcs
Kgs
Bags
Bags
Bags
Bags
Pcs

9000
3520
190
1200
800
2600
1200
300

6
6

No.
No.

4000
150

4000
5000
6000
4000

AMOUNT
480,000
1,760,000
1,700,000
270,000
210,000
355,300
472,230
377,550
209,020
427,535
1,167,360
950,000
100,000
24,000
96,000
36,000
73,920
19,000
16,800
11,200
72,800
12,000
10,500
272,324
24,000
900
1,161,264.25

SUBTOTAL

10,309,703.25

ADD 16% VAT

1,649,552.45

TOTAL FOR MATERIALS ON


SITE CARRIED MAIN SUM

11,959,255.70