OUR REF: SPION/NKR/02/2013 REF: QUOTATION FOR PROPOSED GODOWNS ITEM DESCRIPTION A Setting Out B Foundation excavations C Column

base excavations D Blinding to bottoms of excavations(50mm) E Formwork to bases of exavations F Reinforcement bars to bases G Reinforcement bars to columns base H Casting columns bases (Concrete mix 1:1.5:3) I Formwork for columns J Casting columns ditto K Striking off formwork L Foundation walling up to DPC level (2.4m) M Backfilling and compacting foundation N Hardcore filling in layers and compaction O Blinding over hardcore 50mm P Anti-termite treatment Q 1000 Gauge polythene sheeting R BRC Mesh S Formwork to sides of slabs T 200mm Thick slab concreting (720sm) I Base plates and Stanchion bolts J Fabrication and erection of Columns K Fabrication of roof trusses L Erection and hoisting of trusses M Roofing N Gutters and down pipes O Walling and external walling upto 6 metres high P Plastering Q Key pointing to external walls R Floor hacking concrete floor S Laying of Granito floor finish T Plumbing Works U Electrical Works Items not Quoted: Water Tank, Generator Room and Boiler Room Mr. Simon Wakaba Ng'ang'a

12TH APRIL 2013 AMOUNT 20,000.00 90,000.00 50,000.00 50,000.00 25,000.00 40,000.00 50,000.00 100,000.00 37,500.00 50,000.00 12,500.00 250,000.00 21,600.00 360,000.00 100,000.00 5,000.00 10,000.00 10,000.00 20,000.00 500,000.00 100,000.00 150,000.00 800,000.00 600,000.00 250,000.00 150,000.00 280,000.00 72,000.00 50,000.00 90,000.00 360,000.00 100,000.00 300,000.00 5,103,600.00

Director- Spion Construction Company

You might also like