Field Evaluation Test Results: Cameron Information Sheet 99-006

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Cameron Information Sheet

99-006

Field Evaluation Test Results


CAMULAR 13-5/8" 5000 psi DL Annular Packing Element Subassembly Field Evaluation Conditions

Location
South Louisiana, USA, Marlin Drilling, Rig No.6

Equipment Used
Cameron 13-5/8" 5000 psi D Annular Blowout Preventer

Time in Service
7/29/88 to 12/21/89

Number of Field Pressure Tests Conducted


41 at various wellbore pressures from 250 psi to 3500 psi

Stripping Pipe Size


3.5" using 400 psi closing pressure

Reasons for Removal from Service


Cosmetics: Operator wanted a new packer to start drilling a new well. Packer did not leak prior to removal from service.

Pressure Test After Removal from Service


Successful, 3/14/90. Pressure tested on 5" pipe mandrel at 1000 psi, 3000 psi and 5000 psi. packer did not leak.

29501 Katy Freeway, Katy TX 77494, Telephone 281.391.4644, Fax: 281.391.4640

Cooper Cameron Corporation Printed in USA, 12/99, CRS.5M, TC980

You might also like