Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

CUSTOMER NAME : S. TRELFA LOCATION: KINGS BUILDINGS SERVICE : REACTOR FEED PUMP FOR POLYBUTENES CHANGE DATE ORIG.

BY APP. BY PUMP TYPE: ORIG: 11/3/2011 GROUP REV REV REV

PUMP PROCESS SPECIFICATION PROJECT No: UNIT No: ITEM No: 1001-P115 DOCUMENT CAT. - CLASS 1

CENTRIF. RECIP. POWER END SUCTION PREFERRED


OPERATING OPERATING

RECIP. STEAM
1 INSTALLED SPARE INSTALLED SPARE

NUMBER OF PUMPS REQUIRED: TYPE OF DRIVER: DUTY:

CONTINUOUS
REQUIRED FLOW CASE 8000 ISOBUTENE 32 55???? 0.6 ???@55deg C 3.4 20.8 20.8

INTERMITTENT

PROCESS REQUIREMENTS PER PUMP OPERATING CASE APPROX. No. OF HRS/YEAR (max) LIQUID PUMPING TEMP.: Normal C Expected Max. C SP. GR. @ P.T.: Rated (Min.) Expected Min. VAPOR PRESS. @ P. T. Bara VISCOSITY @ P. T. cP CAPACITY @ P. T. (2) Required m3/hr Norm. m /hr
3

DISCH. PRESS.: Required bar g 13.98 SUCT. PRESS.: Normal bar g 3.58 DIFFERENTIAL PRESS.: bar 11.45 DIFFERENTIAL HEAD (1) m 194.5 SUCTION PRESS.: (max. Possible) barg 3.66 NPSH CALCULATED 3 NPSH AVAILABLE m 2.4 CORROSION/EROSION DUE TO POSSIBILITY OF CAVITATION ADDITIONAL PUMP DATA FLOW CONTROLLED BY LC TC METHOD OF STARTING SPARE PUMP: MATERIALS RECCOMENDED PUMP JACKET REQUIRED MANUAL CASING: CARBON STEEL YES NO AUTOMATIC

PC

FC

OTH

INTERNALS: CARBON STEEL (Process requirements)

NOTES: (1) CENTRIFUGAL PUMP SHUT-OFF HEAD ON TEST SHALL NOT EXCEED (

)% OF SPECIFIED DIFFERENTIAL HEAD

INCLUSIVE OF ALL TOLERANCES (2) FLOWRATE EXCLUDES CONTINUOUS SPILLBACK ALLOWANCE . ENGINEERING TO INCREASE CAPACITY AS NECESSARY

ITEM No.

PUMP PROCESS SPECIFICATION

o: No.REQD: 1

1001-P115 CAT. - CLASS 1

ROTARY
INSTALLED SPARE INSTALLED SPARE PUMP MINIMUM FLOW CASE 8000 ISOBUTENE 32 0.6 3.4 0 0

METERING
1 1

MAXIMUM SP. GR. CASE

@40 dens 722.2

20 655

A PC FC OTHER

TIC

NTERNALS: CARBON STEEL rocess requirements)

)% OF SPECIFIED DIFFERENTIAL HEAD

GINEERING TO INCREASE CAPACITY AS

SHEET 1 OF 1

You might also like