Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Unit 82 AIRFRAME SYSTEMS

OC-4/ P10, P11, P12, P13 ASSIGNMENT # 05


ASSESSOR: Asfand Ali Khan CLASS: ND 06

Date of issue: 06/05/2013

Date of submission: 10/05/2013

P10. Carry out a given maintenance activity on a pneumatic supply system, using given documentation and observing relevant safety precautions. P11. Carry out two given maintenance activities on air conditioning/pressurisation systems, using given documentation and observing relevant safety precautions. P12. Carry out two given maintenance activities on aircraft fuel/fire protection systems, using given documentation and observing relevant safety precautions. P13. Carry out two given maintenance activities on two cabin equipment/protection systems, using given documentation and observing relevant safety precautions. P10: TASK 1: You are a maintenance technician and the task given to you by the Chief Engineer is to carry out the replacement of Bleed Air ducts in wings. List down the relevant safety precautions and the procedure you would adapt. P11 Task2:Aircraft pilot reported that there are moisture contents entering in cockpit with conditioned air. Probable cause is that aircraft water separator coalescent bag is torn off. Remove the water separator for shop inspection. Task3: Aircraft pneumatic shop revealed that water separator coalescent bag torn off. Replaced with new one, now component is serviceable to install on aircraft. Carry out the installation of water separator. P12 Task 4: During aircraft engine ground run, the right aircraft engine caught fire and the extinguishing system has been applied. Now carry out the replacement of Right Engine fire bottle as per AMM along with the relevant safety precautions. Task 5: Carry out the Removal/ installation of fuel system water drain valve with relevant documentation using proper precautions. P13 Task 6: Carryout the removal/ installation of passenger compartment seats as found unserviceable and it cannot be carry forward in MEL. Task 7: Carry out the inspection / check of oxygen storage cylinders as inspection is due under the maintenance check.

You might also like