Professional Documents
Culture Documents
U#3 Gravity
U#3 Gravity
GRAVITY NOZZLE
24 January, 2014
KARNATAKA POWER CORPORATION LTD. - U#3 700MW BTPS - MOHAN KRISHNA BUDDI S AEE(M)
2034.3
2034.3
2034.3
2034.3
2034.3
P5, f =2034.269
P
N3 1.3m
0.0242 bar.g
N2 1.3m
p =0.0000bar.g
P2, f=2034.269
P1, f =2034.269
N5 0.0m
N1 0.0m 0.3113 bar.g
0.0 bar.g@ 3.3m
0.3217 bar.g
P4, f=2034.269
P3, f =2034.269
N6 -2.2m
0.5209 bar.g
N4 -2.2m
0.3677 bar.g
Page 2
24 January, 2014
KARNATAKA POWER CORPORATION LTD. - U#3 700MW BTPS - MOHAN KRISHNA BUDDI S AEE(M)
Fluid Data
Zone
Fluid Name
Chemical Formula
Temperature C
Pressure bar.g
Density kg/m
Centistokes
Centipoise
Water
H2 O
35.000
0.0000
994.000
0.723
0.719
Vapour Pressure
bar.a
0.056290
State
Liquid
Page 3
24 January, 2014
KARNATAKA POWER CORPORATION LTD. - U#3 700MW BTPS - MOHAN KRISHNA BUDDI S AEE(M)
Pump Data
Pipe Id
Pipe Name
Pump Name
Speed rpm
Pref. Op
From
m/hour
Pref. Op To
m/hour
Flow In/Out
m/hour
Velocity
m/sec
Suction
Pressure
bar.g
Discharge
Pressure
bar.g
Pump Head
(+) m.hd
Fluid
Pump Power
Kilowatts
Page 4
24 January, 2014
KARNATAKA POWER CORPORATION LTD. - U#3 700MW BTPS - MOHAN KRISHNA BUDDI S AEE(M)
Pipe Data
Pipe Id
1
P2
P3
P4
P5
Material
Inner Diameter
mm
28 Steel (ANSI) 691.200
Sch. 40
28 Steel (ANSI) 691.200
Sch. 40
28 Steel (ANSI) 691.200
Sch. 40
28 Steel (ANSI) 691.200
Sch. 40
28 Steel (ANSI) 691.200
Sch. 40
Roughness mm
Length m
Total K
Flow m/hour
Velocity m/sec
0.8300
Mass Flow
kg/sec
561.6844
1.506
Entry Pressure
bar.g
0.3217
Exit Pressure
bar.g
0.3113
0.046
5.000
2034.269
0.046
3.500
0.1400
561.6844
2034.269
1.506
0.3677
0.0242
0.046
700.000
0.9400
561.6844
2034.269
1.506
0.5209
0.3677
0.046
3.000
0.3800
561.6844
2034.269
1.506
0.3113
0.5209
0.046
20.000
1.7900
561.6844
2034.269
1.506
0.0242
0.0000
Page 5
24 January, 2014
KARNATAKA POWER CORPORATION LTD. - U#3 700MW BTPS - MOHAN KRISHNA BUDDI S AEE(M)
Node Data
Node Id
Node Type
Node
Elevation m
Liquid Level m
1
2
3
4
5
6
Tank
Demand Pressure
Join Point
Join Point
Join Point
Join Point
N1
N2
N3
N4
N5
N6
0.000
1.300
1.300
-2.200
0.000
-2.200
3.300
N/A
N/A
N/A
N/A
N/A
Surface Press.
bar.g
0.0000
0.0000
N/A
N/A
N/A
N/A
Press. at Node
bar.g
0.3217
0.0000
0.0242
0.3677
0.3113
0.5209
HGL at Node
m.hd Fluid
3.300
1.300
1.549
1.572
3.194
3.143
Demand In
m/hour
N/A
N/A
0.000
0.000
0.000
0.000
Demand Out
m/hour
N/A
N/A
0.000
0.000
0.000
0.000
Total Flow In
m/hour
0.000
2034.269
2034.269
2034.269
2034.269
2034.269
Page 6
24 January, 2014
KARNATAKA POWER CORPORATION LTD. - U#3 700MW BTPS - MOHAN KRISHNA BUDDI S AEE(M)
Energy Data
Pipe Id
1
2
3
4
5
Pipe Name
P1
P2
P3
P4
P5
Energy Loss To
Pipe Friction
Energy Loss To
Pipe Fittings
Energy Loss To
Pipe Components
Kilowatts
0.057539
0.040277
8.055451
0.034523
0.230156
Kilowatts
0.528637
0.089168
0.598697
0.242027
1.140073
Kilowatts
0.000000
0.000000
0.000000
0.000000
0.000000
Energy Loss To
Pipe Control
Valves
Kilowatts
0.000000
0.000000
0.000000
0.000000
0.000000
Energy Loss To
SUBTOTAL Loss
Energy Loss To
Pump Inefficiency Pipe Items +Pump Discharge
Pressure
Kilowatts
Kilowatts
Kilowatts
N/A
0.586176
0.000000
N/A
0.129445
0.000000
N/A
8.654148
0.000000
N/A
0.276550
0.000000
N/A
1.370228
0.000000
Energy Loss To
Change in
Elevation
Kilowatts
0.000000
19.278846
0.000000
-12.118132
0.000000
Page 7