Weekly Report_

DOC. No -

Equipment report

REV. No. DATE PAGE

November 5, 2013 8 from 14

Project Name Work Package Location Work Step Dated Period No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

ICP TELUK LEMBU Phase 2 - 6 x 620 GAS ENGIE ENCLOSURE ERECTION PLTDG TELUKLEMBU
Enclusure and Accessories Erection, Radiator Erection, Gas Piping Work

Managing Contractor PT PETROWOOD BANGUN MANDIRI Month : Nov-13 Remarks

Name Tools Qty 1 1 4 1 13 4 4 2 4 8 1 20 1 2 1 5 4 Unit Set Set Set Unit Unit Unit Pcs Pcs Pcs Set Set Set Set Set Lot Tbg Tbg Makita Makita Type Maual Manual Pneumatic Silent Ops 1,2 X 2,4 Mtr 3" Inch Cap 12 Bar 100 Kva -

Standard Tools Special Tools Impact Wrench Generator Welding Travo Blending Equipmet Iron Plat BlackSteel Pipe - Sch 40 Selling Belt Bor, Gerinda, etc Cutting Well Scafolding Argon Equipment Oven/ Thermoss Safety Equipment APAR 3 KG APAR 6 KG

Repair Structure/ Bolt Hole Maker Utilized for Crane Jack Poundations Utilized for Rolling Engine At Base Frame Utilized for gas piping work and structure feeder Utilized for gas piping work and structure Repair Utilized for gas piping work and structure Repair Utilized for gas piping work and structure erection work Utilized for gas piping work Utilized for gas piping work Utilized for work Safely and Protecting Utilized for work Safely and Protecting Utilized for work Safely and Protecting