Professional Documents
Culture Documents
Design Case Present Operating
Design Case Present Operating
Flow
Inlet temp
Outlet temp
DT
cp
Q
kg/hr
C
C
C
kcal/kg-C
kcal/hr
BFW
47756
110
285
175
1.06
8858738
Process
47668
361
125
236
0.79
8858738
Present Operating
BFW
34000
110
265
155
1.06
5586200
DT1
DT2
LMTD
15
76
37.7
38
25
31.0
Area
612.3
612.3
Ud
Ud design
kcal/hr-m2-C
kcal/hr-m2-C
Remark
383
422
Process
50000
290
148
142
0.79
5586200
294
= 383*1.1
-897396 kcal/hr
-0.9 Gcal/hr
1 Ud is 294
indicates fouling
2 Gas O/L cal is 148 v/s
actual 151
Error in reading ??
Vary BFW
O/L temp
to match
Ud=421
Present Operating
If Ud= 421 after cleaning
BFW
Process
34000
50000
110
290
273.35
140
163.35
150
1.06
0.79
5887134
5887134
BFW O/L
temp =
Gas in 5C
Max gas
cooling
30
17
22.8
20
5
10.7
612.3
1400
Calculated
5149
422
422
Assumed
422
1 Ud assumed 422
2 Hot end approach = 5C
3 Gas cooled upto 130C
15
0
3.0
1 Ud assumed 422
2 Hot end approach = 0.1 C
3 Gas cooled upto 125.1 C
d assumed 422
ot end approach = 0.1 C
as cooled upto 125.1 C