SALIENT FEATURES

KALIGANGA-I SHP (2X2) MW


Name of Project : Design, Supply and Installation of complete Small Hydro Power Project of 2x2 MW Kaliganga-I SHP with one year O&M Working Agency: UJVN Limited ( Formerly known as Uttarakhand Jal Vidyut Nigam Ltd, A Govt Enterprises) Type of Scheme: Run of River (ROR) scheme Location: Jal Talla, Ukhimath, Rudraprayag (a major tributary of Mandakni) Altitude: Diversion Weir 1670.4 m Power House 1495.0 m Above mean sea level

Name of Conractor : M/S, SCL-BFL (JV), Akashneem Marg, Ist Floor,DLF Phase-II, Gurgaon Haryana122002 Date of start : 07-02-2008 Date of completion : 15-July-2012 Project Cost (i) Civil Part 1674.80 Lacs 871.60 Lacs 2546.40 Lacs

(ii) E/M Part TOTAL

Project Finance by: Asian Development Bank Status of work As on 15-June-2013 Actual work done - 98.50% Date of Commissioning : 18/19-July-2012 Date of commercial Operation : 10-Sep-2012 Loss Assesment due to flood occurred on 16/17-June-2013: TOTAL- 1832.00 Lacs (Work in Progress )

SALIENT FEATURES
KALIGANGA-II SHP (2X3) MW
Name of Project : Design, Supply and Installation of complete Small Hydro Power Project of 2x3 MW Kaliganga-II SHP with one year O&M Working Agency: UJVN Limited ( Formerly known as Uttarakhand Jal Vidyut Nigam Ltd, A Govt Enterprises) Type of Scheme: Run of River (ROR) scheme Location: Khunnu-(Kotimaheswari), Kabiltha, Ukhimath Rudraprayag (a major tributary of Mandakni) Altitude: Diversion Weir 1487.5 m Power House 1339.0 m Above mean sea level

Name of Conractor : M/S, SCL-BFL (JV), Akashneem Marg, Ist Floor,DLF Phase-II, Gurgaon Haryana122002 Date of start : 02-May-2008 Expected Date of completion : 31-Dec-2013 Project Cost (i) Civil Part 3094.00 Lacs --------- Lacs 3094.00 Lacs

(ii) E/M Part TOTAL Project Finance by: Asian Development Bank Status of work

As on 15-June-2013 Actual work done - 43.5% (Work in Progress)

Date of Commissioning : -------------------Date of commercial Operation : -----------------------Loss Assesment due to flood occurred on 16/17-June-2013: TOTAL- 1991.00 Lacs