Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 7

By: Mohd Suhaimi Mat Din ADTEC Bintulu

Perform piping pressure test

Supervise piping pressure test

Prepare piping pressure test report

Supervise piping precommissioning

Prepare JSA

Obtain pressure test package

Obtain equipments and materials

Submit report

Execute pressure test

Set-up pressure test equipment

Also known as Job Hazard Analysis, or JHA very effective of helping reduce incidents, accidents, and injuries in the workplace be used to investigate "near misses" and accidents. To start the JSA Process, select the job or task to be performed. Any job that has hazards or potential hazards is a candidate for a JSA Forms or worksheets may vary from company to company but the idea remains the same. Identify all steps, hazards, and safe work procedures before starting the job

Basic Job Steps

Break the job into a sequence of steps. Each of the steps should accompany some major task. That task will consist of a series of movements. Look at each series of movements within that basic task

Potential Hazards

To complete a JSA effectively, you must identify the hazards or potential hazards associated with each step. Every possible source of energy must be identified. It is very important to look at the entire environment to determine every conceivable hazard that might exist. Hazards contribute to accidents and injuries

Recommended Safe Job Procedures

Using the Sequence of Basic Job Steps and Potential Hazards, decide what actions are necessary to eliminate, control, or minimize hazards that could lead to accidents, injuries, damage to the environment, or possible occupational illness. Each safe job procedure or action must correspond to the job steps and identified hazards

You might also like