1. Last week's work included health checks on PH BSCs, commission testing for 2 BTSs, and resolving a version problem in PH BSCs. Repairs were also made to the BSS LAN network and 3 terminals were prepared. Troubleshooting was done on BSC1 bam.
2. Plans for next week include commission testing a new BTS, monitoring the new Ibadan BSC work progress, and troubleshooting E1 connections.
3. Last week's maintenance work consisted of BSC performance monitoring, troubleshooting CRC errors for an SPU board in BSC1, tracing and fixing a MUX problem in frame 6 of BSC1, and modifying offset times for FMR
1. Last week's work included health checks on PH BSCs, commission testing for 2 BTSs, and resolving a version problem in PH BSCs. Repairs were also made to the BSS LAN network and 3 terminals were prepared. Troubleshooting was done on BSC1 bam.
2. Plans for next week include commission testing a new BTS, monitoring the new Ibadan BSC work progress, and troubleshooting E1 connections.
3. Last week's maintenance work consisted of BSC performance monitoring, troubleshooting CRC errors for an SPU board in BSC1, tracing and fixing a MUX problem in frame 6 of BSC1, and modifying offset times for FMR
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
1. Last week's work included health checks on PH BSCs, commission testing for 2 BTSs, and resolving a version problem in PH BSCs. Repairs were also made to the BSS LAN network and 3 terminals were prepared. Troubleshooting was done on BSC1 bam.
2. Plans for next week include commission testing a new BTS, monitoring the new Ibadan BSC work progress, and troubleshooting E1 connections.
3. Last week's maintenance work consisted of BSC performance monitoring, troubleshooting CRC errors for an SPU board in BSC1, tracing and fixing a MUX problem in frame 6 of BSC1, and modifying offset times for FMR
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
2. Commission test for 2 BTS. 3. Resolved the version problem In PH BSCs. last week work
4. Repair BSS LAN network and prepare 3 terminals.
5. Troubleshooting BSC1 bam.
Monitor the project and make commission test new BTS
plan for next week (fixed work)
(fixed work and depend on Project Dept.).
Monitor the New ibadan BSC work progress. (all) Troubleshooting E1. (Fixed).
BSC performance monitoring and troubleshooting.
Resolve the CRC error for SPU board in BSC 1(Adeep). last week work (Mentenance work)
Trace and fix the MUX problem in frame 6 BSC1.
Modify the offset time for FMR for all BSCs. Continue making the health check for Other BSC. Make the list for all sites which haven’t EAC If EAC not configured, configure it and display it information, and remove it if the result is absent. Extract data configuration script for all BSC and Save BTS cfg for all BSCs. Configure new terminal for BSS. Monday Tuesday Wednesday Thursday Friday 11/12/2007 11/13/2007 11/14/2007 11/15/2007 11/16/2007 Configure 2 new BTS work notes for future research modifay SID modifay SPC coding taype enable MA switch for PCF