Concrete Inspection

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

CHONG HUA HOSPITAL - MANDAUE

IN-PROCESS CONCRETE INSPECTI


Project: Chong Hua Mandaue Location: PC 44,43 (H'-I',3-5) Contractor: ASEC Construction and Development Corp. REF. No. : DATE: May 04, 2013 TRUCK BODY NO. TM 74 (DUY 710) TIME TAKEN 2:15 PM CONTENT (m3) 8 DESIGN STRENGTH 4000 psi Concrete Pouring Start End

Prepared by: ______________________ Field Engineer - Contractor

Conforme: ___________________________ CHH Project Inspector

A HOSPITAL - MANDAUE

CONCRETE INSPECTION

BUILDING IDENTIFICATION STRUCTURE PC 44 MARK LOCATION ACTUAL SLUMP 6 GRAVEL SAMPLE SIZE TAKEN 3/4" SAMPLE I.D No. 1

Noted by: ________________________________ CHH Project Engineer

CHONG HUA HOSPITAL - MANDAUE

IN-PROCESS CONCRETE INSPECTI


Project: Chong Hua Mandaue Location: 1'J'-1'L' Contractor: ASEC Construction and Development Corp. REF. No. : DATE: May 09, 2013 TRUCK BODY NO. TM-78 (DUY 310) TM-74 (DUY 710) TM-28 (PRR 485) TM-77 (DUY 610) TIME TAKEN 2:10 PM 2:30 PM 9:34 PM 12:57 AM CONTENT (m3) 8 8 8 8 DESIGN STRENGTH 4000 PSI 4000 PSI 4000 PSI 4000 PSI Concrete Pouring Start End

Prepared by: Jef Field Engineer - Contractor

Conforme: ___________________________ CHH Project Inspector

A HOSPITAL - MANDAUE

CONCRETE INSPECTION

BUILDING IDENTIFICATION STRUCTURE PC-46 PC-46 PC-45/CW PC-45 MARK LOCATION ACTUAL SLUMP 6 7 6.5 7 GRAVEL SAMPLE SIZE TAKEN 3/4" 3/4" 3/4" 3/4" SAMPLE I.D No. 1 2 3 4

Noted by: ________________________________ CHH Project Engineer

CHONG HUA HOSPITAL - MANDAUE

IN-PROCESS CONCRETE INSPECTI


Project: Chong Hua Mandaue Location: 1'M'-1'O' Contractor: ASEC Construction and Development Corp. REF. No. : DATE: May 09, 2013 TRUCK BODY NO. TM-29 (ZTG 703) TIME TAKEN 8:58 PM CONTENT (m3) 8 DESIGN STRENGTH 4000 PSI Concrete Pouring Start End

Prepared by: Jef Field Engineer - Contractor

Conforme: ___________________________ CHH Project Inspector

A HOSPITAL - MANDAUE

CONCRETE INSPECTION

BUILDING IDENTIFICATION STRUCTURE PC - 46 MARK LOCATION ACTUAL SLUMP 6.5 GRAVEL SAMPLE SIZE TAKEN 3/4" SAMPLE I.D No. 1

Noted by: ________________________________ CHH Project Engineer

CHONG HUA HOSPITAL - MANDAUE

IN-PROCESS CONCRETE INSPECTI


Project: Chong Hua Mandaue Location: 6'I',8I' Contractor: ASEC Construction and Development Corp. REF. No. : DATE: May 16, 2013 TRUCK BODY NO. TIME TAKEN CONTENT (m3) 7 DESIGN STRENGTH 4000 PSI Concrete Pouring Start End

Prepared by: Jef Field Engineer - Contractor

Conforme: ___________________________ CHH Project Inspector

A HOSPITAL - MANDAUE

CONCRETE INSPECTION

BUILDING IDENTIFICATION STRUCTURE PC - 41/42 MARK LOCATION ACTUAL SLUMP 6.5 GRAVEL SAMPLE SIZE TAKEN 3/4" SAMPLE I.D No. 1

Noted by: ________________________________ CHH Project Engineer