Professional Documents
Culture Documents
Inspection Test Plan Equipment - AFC Header Plug Seal Weld 1
Inspection Test Plan Equipment - AFC Header Plug Seal Weld 1
H P = = HOLD (100% WITNESS) APPROVAL REQUIRED PREPARED W1 = W2 = 100% WITNESS SPOT WITNESS M =
PAGES:
1 OF 10
EWR-A1-0166 0 0
REVIEW REPORT/ DOCUMENT/ APPROVED NOT APPLICABLE
AR =
N/A =
NO
INSPECTION
ACCEPTANCE CRITERIA
CHARACTERISTIC TO BE VARIFIED
REPORT FORMAT
INSPECTION FREQUENCY
PRIOR TO WELDING 1 Documentary Review (if required) a) Welding Procedure Specification (WPS) b) Procedure Qualification Record (PQR) c) Welder Qualification Test Certificate d) Drawing 2 Material Verification a) Material Receiving Inspection (MRI) b) Visual Inspection As Per Material Specified 10% Dimensional, Appearance & Heat No. Mechanical & Chemical properties Tube size (I.D,O.D & length) Mill Certificates 10% M M R/A R/A As Per Standard ASME IX Mechanical Test Visual, Radiography Examination & Mechanical Test As Per Requirement Approved WPS Approved PQR WQT Drawing 100% 100% 100% 10% P P P R/A R/A R/A P
Tube Details
M M M
Monitoring Welding a) Welding Rod @ Electrode Approve WPS/PQR Approve WPS F No. Classification Weld Defects As Per WPS Visual Report 100% 100% R/W2 W2/M R/A R/A
Visual Inspection
NON DESTRUCTIVE TEST 6 Dye Penetrant Test (DPT) ASME Sec. V Weld Defects DPT Report 100% P R/A
HYDROTEST 7 Hydrotest Preparation a) Check Preparation b) After Hydrotest ASME B31.3 Calibration Certificate No Leak Holding Time Calibration of Pressure Gauge Leakage Pressure Test Cert. Valid Calibration Cert. Pressure Test Cert. 100% 100% 100% M M M M/R/A M/R/A M/R/A
Comment by Client (if any) 0 Rev. Date Revision Description Prepared By Reviewed By Approve By
EWR-A1-0166 0 0
REVIEW REPORT/ DOCUMENT/ APPROVED NOT APPLICABLE
REMARKS
i) Approve WPS, PQR & WQT ii) Inspect & evaluate all RT report
Visual Report
DPT Report