Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail Table 3: Average

unit prices for sand, aggregates, premix, fabric reinforcement and guardrail Kawasan* Region Item (1) Pasir Sand Pasir sungai River sand
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 34.79 34.79 66.64 66.64

Tempoh Period

Sabah G H I J

Sarawak K L

RM Per Tan Metrik RM Per Metric Ton


58.31 58.31 37.67 38.00 23.28 23.28 31.00 31.00

(2) Batu baur Aggregates Granite 10mm (3/8") Granite 10mm (3/8")
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 40.00 40.50 54.00 54.00 35.33 35.33 26.58 26.58 57.00 57.00 51.00 51.00

Granite 20mm (3/4") Granite 20mm (3/4")

54.00 57.00

70.00 70.00

40.50 40.50

34.23 34.23

49.50 49.50

na na

Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet. The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets. * Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3 ** Harga pasir di Sarawak adalah untuk tujuan kerja-kerja konkrit sahaja. ** The sand price in Sarawak is for the purpose of concrete works only.

-6 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item (2) Batu baur (samb.) Aggregates (cont'd) Granite 40mm (11/2") Granite 40mm (11/2")
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 48.50 49.50 na na

Tempoh Period

Sabah G H I J

Sarawak K L

RM Per Tan Metrik RM Per Metric Ton


38.00 38.00 21.30 21.30 47.00 47.00 45.00 45.00

Crusher run Crusher run

40.75 41.25

59.00 59.00

33.67 33.67

18.50 18.50

41.00 41.00

45.00 45.00

Sandstone 20mm (3/4") Sandstone 20mm (3/4")

46.00 47.50

49.00 49.00

37.00 37.00

na na

na na

na na

na = Tidak diperoleh/Not available * Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-7 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item (2) Batu baur (samb.) Aggregates (cont'd) Limestone 20mm (3/4") Limestone 20mm (3/4")
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis na na na na

Tempoh Period

Sabah G H I J

Sarawak K L

RM Per Tan Metrik RM Per Metric Ton


na na 26.30 26.30 47.00 47.00 52.00 52.00

(3) Premix asphaltic concrete Premix asphaltic concrete AC 10 (Wearing course)


2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 236.67 236.67 300.00 300.00 na na 192.00 192.00 200.00 200.00 220.00 220.00

AC 14 (Wearing course)

236.67 236.67

300.00 300.00

230.00 230.00

192.00 182.50

200.00 200.00

210.00 210.00

na = Tidak diperoleh/Not available * Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-8 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item Tempoh Period Sabah G H I J Sarawak K L

(3) Premix asphaltic concrete (samb.) Premix asphaltic concrete (cont'd) AC 28 (Binder course)
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 231.67 231.67 300.00 300.00

RM Per Tan Metrik RM Per Metric Ton


na na 182.50 177.50 200.00 200.00 220.00 220.00

ACW 20 (Wearing course)

233.33 233.33

300.00 300.00

230.00 230.00

199.50 190.00

200.00 200.00

210.00 210.00

BMR40 (Bound roadbase)

na na

na na

na na

170.00 170.00

na na

na na

na = Tidak diperoleh/Not available * Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-9 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item (3) Premix bituminous macadam Premix bituminous macadam BMR28 (Bound roadbase)
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis na na na na

Tempoh Period

Sabah G H I J

Sarawak K L

RM Per Tan Metrik RM Per Metric Ton


na na 170.00 170.00 na na na na

BML10 (Levelling course)

na na

na na

na na

170.00 170.00

na na

na na

BMB28 (Binder course)

na na

na na

na na

175.00 175.00

na na

na na

na = Tidak diperoleh/Not available * Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-10 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item Tempoh Period Sabah G H I J Sarawak K L

(3) Premix bituminous macadam (samb.) Premix bituminous macadam (cont'd) BMB20 (Binder course)
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis na na na na

RM Per Tan Metrik RM Per Metric Ton


na na 175.00 175.00 na na na na

BMW14 (Wearing course)

na na

na na

na na

180.00 180.00

na na

na na

BMW 20 (Wearing course)

na na

na na

na na

180.00 180.00

na na

na na

na = Tidak diperoleh/Not available * Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-11 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item (4) Fabric reinforcement Fabric reinforcement A4, MS145
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 4.06 3.76 3.97 3.97

Tempoh Period

Sabah G H I RM Per Kg RM Per Kg


3.86 3.86 3.10 3.10

Sarawak J K L

4.66 4.82

4.18 4.18

A5, MS145

3.57 3.35

3.53 3.53

3.43 3.43

3.15 3.15

4.15 4.28

3.71 3.71

A6, MS145

3.52 3.30

3.42 3.42

3.33 3.33

3.15 3.15

4.02 4.15

3.60 3.60

Mulai Januari 2010, harga fabric reinforcement tidak termasuk kos pemotongan. Starting from January 2010, the fabric reinforcement prices do not include cutting services fee. * Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-12 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item Tempoh Period Sabah G H I RM Per Kg RM Per Kg
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 3.50 3.27 3.31 3.31 3.22 3.22 3.15 3.15 3.89 4.01 3.48 3.48

Sarawak J K L

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd) A7, MS145

A8, MS145

3.72 3.49

3.30 3.30

3.21 3.21

3.15 3.15

3.87 4.00

3.47 3.47

A9, MS145

3.47 3.25

3.22 3.22

3.13 3.13

3.18 3.15

3.78 3.91

3.39 3.39

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-13 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item Tempoh Period Sabah G H I RM Per Kg RM Per Kg
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 3.52 3.29 3.42 3.42 3.33 3.33 3.18 3.15 4.02 4.15 3.60 3.60

Sarawak J K L

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd) A10, MS145

B5, MS145

3.00 3.00

3.37 3.37

3.27 3.27

3.20 3.20

3.95 4.08

3.54 3.54

B6, MS145

3.51 3.28

3.37 3.37

3.27 3.27

3.20 3.20

3.95 4.08

3.54 3.54

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-14 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item (4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd) B7, MS145
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 3.73 3.51 3.37 3.37

Tempoh Period

Sabah G H I RM Per Kg RM Per Kg


3.27 3.27 3.20 3.20

Sarawak J K L

3.95 4.08

3.54 3.54

B8, MS145

3.50 3.28

3.31 3.31

3.22 3.22

3.20 3.20

3.89 4.01

3.48 3.48

B9, MS145

3.51 3.29

3.39 3.39

3.30 3.30

3.23 3.20

3.98 4.11

3.56 3.56

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-15 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item Tempoh Period Sabah G H I RM Per Kg RM Per Kg
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 3.05 3.05 3.49 3.49 3.39 3.39 3.23 3.20 4.09 4.23 3.67 3.67

Sarawak J K L

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd) B10, MS145

B12, MS145

3.02 3.02

3.48 3.48

3.38 3.38

3.20 3.20

4.08 4.21

3.66 3.66

C5, MS145

3.07 3.07

3.33 3.33

3.24 3.24

3.20 3.20

3.91 4.04

3.51 3.51

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-16 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item Tempoh Period Sabah G H I RM Per Kg RM Per Kg
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 3.08 3.08 3.56 3.56 3.47 3.47 3.20 3.20 4.19 4.23 3.75 3.75

Sarawak J K L

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd) C6, MS145

C7, MS145

3.06 3.06

3.51 3.51

3.41 3.41

3.20 3.20

4.12 4.25

3.69 3.69

C8, MS145

3.08 3.08

3.56 3.56

3.47 3.47

3.20 3.20

4.19 4.32

3.75 3.75

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-17 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item Tempoh Period Sabah G H I RM Per Kg RM Per Kg
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 3.04 3.04 3.48 3.48 3.38 3.38 3.23 3.20 4.08 4.21 3.66 3.66

Sarawak J K L

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd) C9, MS145

C10, MS145

3.06 3.06

3.52 3.52

3.42 3.42

3.23 3.20

4.13 4.27

3.70 3.70

DA4, MS145

3.11 3.11

3.61 3.61

3.51 3.51

3.25 3.20

4.24 4.37

3.80 3.80

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-18 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item Tempoh Period Sabah G H I RM Per Kg RM Per Kg
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 3.31 3.31 3.65 3.65 3.55 3.55 3.23 3.20 4.29 4.43 3.84 3.84

Sarawak J K L

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd) DA5, MS145

DA6, MS145

3.23 3.23

3.54 3.54

3.45 3.45

3.23 3.20

4.16 4.29

3.73 3.73

DA7, MS145

3.12 3.12

3.43 3.43

3.34 3.34

3.23 3.20

4.03 4.16

3.61 3.61

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-19 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item Tempoh Period Sabah G H I RM Per Kg RM Per Kg
2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 3.07 3.07 3.38 3.38 3.28 3.28 3.23 3.20 3.97 4.09 3.55 3.55

Sarawak J K L

(4) Fabric reinforcement (samb.) Fabric reinforcement (cont'd) DA8, MS145

DA9, MS145

3.07 3.07

3.37 3.37

3.27 3.27

3.23 3.20

3.95 4.08

3.54 3.54

DA10, MS145

3.20 3.20

3.51 3.51

3.41 3.41

3.23 3.20

4.12 4.25

3.69 3.69

* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-20 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item Tempoh Period Sabah G H I J Sarawak K L

(5) Guardrail Guardrail Single mounted i)1.95m Post spacing


2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis 268.80 268.80 na na

RM Per Meter RM Per Metre


na na 298.13 298.13 na na na na

ii) 3.8m Post spacing

197.27 197.27

na na

na na

314.00 314.00

na na

na na

Double mounted i) 1.95m Post spacing

na na

na na

na na

371.88 371.88

na na

na na

Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet. The prices for guardrail are inclusive of transportation charges for 30km from the outlets. na = Tidak diperoleh/Not available * Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3

-21 -

Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.) Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd) Kawasan* Region Item Tempoh Period Sabah G H I J Sarawak K L

(5) Guardrail (samb.) Guardrail (cont'd) ii) 3.8m Post spacing


2011 Dis 2012 Jan Feb Mac Apr Mei Jun Jul Ogos Sept Okt Nov Dis na na na na

RM Per Meter RM Per Metre


na na 357.75 357.75 na na na na

na = Tidak diperoleh/Not available * Kawasan/Region G = Kota Kinabalu H = Sandakan I = Tawau J = Kuching K = Sibu L = Miri