Professional Documents
Culture Documents
Corroded Bar Treatment2
Corroded Bar Treatment2
HiltiChemicalInjection
ExistingCorrodedRebar
ConstructionSequence a. Todrillabout200mmdeepinto theexistingbeam b. Blowthedustinsidethedrilled hole(ifpossiblecleanwithwet clothandletitdry) c. Insertthenewrebarintothehole andapplyHiltiHY150/HiltiRE500 usingthegun d. Letthechemicaltodry(Ifthe chemicalisHY1505min,andIf RE500abouthalfanhour) e. Weldthenonembeddedportion oftherebarwiththeexisting corrodedrebar
Drilledlengthabout200mm intotheexistingbeam
ExistingEmbeddedRebar ____________OR_________________
ExistingBeam
IPLCorrodedRebarTreatment