Insp Checklist - Piping Connections
Insp Checklist - Piping Connections
SAIC NUMBER
DATE APPROVED
QR NUMBER
SAIC-G-2005
WBS / BI / JO NUMBER
25-May-05
MECH-
CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL
EQPT CODE
SYSTEM ID.
PLANT NO.
ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL
ITEM No. A.
ACCEPTANCE CRITERIA General Requirements Suction Piping shall have a straight length of pipe at least 5 times the suction nozzle diameter immediately upstream of the nozzle. Note: The above requirement does not apply to horizontal self priming pumps and vertically suspended double casing pumps. In the event of there being insufficient space to accommodate the straight length of piping immediately upstream of the pump, a specially fabricated reducer is provided for direct connection to the pump suction nozzle. This reducer is eccentric with the flat uppermost and has a taper angle not exceeding 12 degrees. Reducers in suction piping shall be of the eccentric type with the flat uppermost and shall be located upstream of the straight pipe length immediately upstream of the suction nozzle of the pump. A check valve is installed on the discharge piping of each pump. Note: Check valve is located upstream of the discharge valve. The suction piping shall be designed to prevent the formation of gas or air pockets. Sufficient venting provisions shall be included. Suction & Discharge nozzles shall be flanged, (API 610 Para. 2.3.2.1). For steel casing, the facing of finished flanges up to and including 24 inches shall be raised face for flanged rating classes 150, 300 and 600 and shall be ring joint for classes 900 and higher. Note: for 26 inches and above, flanges shall be in accordance with Standard Drawings AD-036634, AD-036991 and AD-039973 for classes 150, 300 and 600 respectively.
REFERENCE
PASS
FAIL
N/A
RE-INSP DATE
A1
A3
A4
SAES-G-005, Para. 5.2.4 SAES-G-005, Para. 5.2.6 SAES-G-005, Para. 5.2.2 31-SAMSS-004, Section 1.1.1
A5 A6 A7
A8
REMARKS:
REFERENCE DOCUMENTS: 1. 31-SAMSS-004 -- Centrifugal Pumps, 30 September, 2003 2. SAES-G-005 -- Centrifugal Pumps, 29 September, 2003 3. API 610 -- Centrifugal Pumps for Petroleum, Heavy Duty Chemicals, and Gas Industry Services, August 1995
Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:
Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified
QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed
PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified
QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test
Y = YES
N = NO F = FAILED
Page 1 of 1