Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

To: Gerald Mascardo

Please be informed that the Electrical Equipment at Salong S/S needed for the feedback power were already installed and ready for testing. The testing will be conducted on March 04, 2014, hence we are requesting representations from NGCP to witness the testing. Thank you for your kind consideration.

You might also like