COMPACT HYDRO REQUEST FOR QUOTATION

Company Name
Nama Perusahaan

CLIENT INFORMATION / INFORMASI DARI KLIEN Telephone


Telepon

Cell Phone
Telepon selular

Contact Person
Nomer Telepon

Facsimile
Fax

E-mail
E-mail

Office Address
Alamat Kantor

Project Name
Nama Projek

PROJECT INFORMATION / INFORMASI DARI PROJEK Province


Propinsi

Latitude
Garis Lintang

Units x Output
Unit x Output

___ x_______ MW ___________ MW

Regency
Kabupaten

Longitude
Garis bujur

Total Output
Total Keluaran

Location
Kecamatan, Desa

Elevation
Elevasi

______________ masl

Consultant
Konsultant

EPC Contractor
Kontraktor Utama

Civil Contractor
Kontraktor Sipil

Principle Permit Obtained


Ijin Prinsip

DEVELOPMENT STATUS / STATUS PEMBANGUNAN Circle the good answer / Lingkari jawaban yang baik Business License IUKS Obtained Yes / No Yes / No
Surat ijin Bisnis IUKS Ijin Kehutanan

Business License IUKU Obtained


Surat ijin Bisnis IUKU

Yes / No Yes / No Yes / No

Environmental Impact Study


UKL/UPL

Yes / No Yes / No

Forestry Permit Obtained Power Purchase Agreement Obt.


Perjanjian Pengadaan sumber Listrik

Yes / No Yes / No

Financing Arranged
Pengaturan Pembayaran

Location Permit Obtained


Ijin Lokasi

Land Acquisition Completed


Pembebasan Lahan

Customs Identity Number


Nomor Identitas Kepabeanan (NIK)

Yes / No

IMPORT LICENSES Special Importer ID Number DESIGN STATUS Feasibility Study Available
Ketersediaan Studi Kelayakan

/ IJIN IMPOR

Nomor Pengenal Importir Khusus (NPIK) / STATUS DESAIN

Yes / No

Importer Producer Steel or Iron


Importir Produsen Besi atau Baja

Yes / No

Pre Feasibility Study Available


Ketersedian Studi Kelayakan Awal

Yes / No

Yes / No

Detailed Design Available


Ketersedian Disain Rinci

Yes / No

Prepared by
Pelaksanaan Oleh

Prepared by
Pelaksanaan Oleh

Prepared by
Pelaksanaan Oleh

Commencement Date
Tanggal Permulaan

___ / ___ / ___

TIME SCHEDULE OF CIVIL WORKS / JADWAL WAKTU PELAKSANAAN PEKERJAAN SIPIL Erection Start [months] Completion [months] ___________ months
Mulai pekerjaan [bulan] Penyelesaian [bulan] / JADWAL WAKTU PELAKSANAAN PEKERJAAN ME

________ months

Commencement Date
Tanggal Permulaan

TIME SCHEDULE OF ELECTROMECHANICAL WORKS Erection Start [months] ___ / ___ / ___
Mulai pekerjaan [bulan]

___________ months

Completion [months]
Penyelesaian [bulan]

________ months

TURBINES Shaft Arrangement


Posisi Shaft

/ TURBIN

Hor. / Vertical __________ masl _____________ m _____________ m _____________ m _____________ m

Net Head Rated


Tinggi Rata -rata

_____________ m _____________ m _____________ m __________ masl __________ masl __________ masl __________ m3/s __________ m3/s __________ m3/s
/ KONEKSI JARINGAN

Headrace Tunnel Length


Panjang Saluran Pembawa

_____________ m ___________ mm _____________ m ___________ mm _____________ m ___________ mm _____________ m ___________ mm __________ masl

Proposed Turbine Level


Level Turbin yg diajukan

Net Head Min Operating


Pengoperasian tinggi Minimum

Headrace Tunnel Dia


Diameter Saluran Pembawa

Max Reservoir Level


Level Bendungan maksimum

Net Head Max Operating


Pengoperasian tinggi Maksimum

Main Penstock Length


Panjang Saluran Pipa Pesat

Min Reservoir Level


Level Bendungan minimum

Tail Water Level Rated


Level rata-rata Pembuangan Air

Main Penstock Dia


Diameter Pipa Pesat Utama

Max Gross Head


Tinggi Maksimum

Tail Water Level Min


Level Pembuangan Air minimum

Branch Penstock Length


Panjang Cabang Pipa Pesat

Min Gross Head


Tinggi Minimum

Tail Water Level Max


Level Pembuangan Air Maksimum

Branch Penstock Dia


Diameter Cabang Pipa Pesat

Speed Rise
Kecepatan Kenaikan

Unit Discharge Rated


Rata-rata pelepasan Unit

Surge Tank Distance


Jarak Tangki Pendatar

Pressure Rise
Tekanan Kenaikan

Unit Discharge Min


Pelepasan Unit Minimum

Surge Tank Diameter


Diameter Tanki Pendatar

Yearly Operating Hours


Operasi Jam Tahunan

_________ hrs/yr

Unit Discharge Max


Pelepasan Unit Maksimum

Surge Tank Elevation


Elevsi Tanki Pendatar

Grid Voltage
Voltase Grid

_____________ kV _____________ Hz

GRID CONNECTION Voltage Variation


Variasi Voltase

- ______ / + ______ kV - ______ / + ______ Hz

Rated Power Factor


Faktor Energi Terukur

Grid Frequency
Frekuensi Grid

Frequency Variation
Variasi Frekuensi

No of Outgoing Lines
Jumlah Jalur Keluar

Transformers Location
Lokasi Transformer Jarak dari MV Switchgear ke Transformer (Panjang Kabel)

Dead End Pole Location


Lokasi Pole Akhir

Short Circuit Capacity


Kapasitas Sirkuit Pendek

Distance from MV Switchgear to Transformers (Cable Length) Distance from MV Switchgear to Dead End Pole (Cable Length)
Jarak dari MV Switchgear ke Pole Akhir (Panjang Kabel)

Page 1/2

COMPACT HYDRO REQUEST FOR QUOTATION


Powerhouse Length
Panjang PH

_____________ m _____________ m

Elevasi Jalan Akses

POWERHOUSE DESIGN / DESAIN PH Access Road Elevation _____________ masl Service Bay Elevation _____________ masl

Turbine Floor Elevation


elevasi Lantai Turbin

__________ masl __________ masl

Powerhouse Width
Lebar PH

Aux. Room Elevation


Elevasi ruang Aux

Elevasi Area Servis

Access Rd Arrangement
Pengaturan Jalan Akses

Service Bay Arrangement


Pengaturan Area Servis

Aux. Room Arrangement


Pengaturan ruang Aux

EOT Crane Support


EOT Crane Support

Concrete / Steel Beam

Pre-Feasibility Study
Studi Kelayakan Awal

ATTACHMENTS PROVIDED / LAMPIRAN Circle the good answer / Lingkari jawaban yang baik General Arrangement Drawing Yes / No Gambar Penempatan umum Yes / No Yes / No Yes / No Powerhouse Drawings
Gambar Gedung Sentral

Water Analysis Report


Analisis Laporan Air

Yes / No Yes / No Yes / No

Feasibility Study
Studi Kelayakan

Yes / No Yes / No

Single Line Diagram


Diagram Satu Garis

Detailed Design
Design detail

Waterway/Penstock Drawings
Gambar Pipa Pesat / Jalur Air

Environmental Impact Study


Analisis Dampak Lingkungan ( AMDAL )

Ambient Temperature
Suhu Lingkungan

_____ C _____ C _____ C _____ C _____ % _____ % _____ %

SITE INFORMATION / INFORMASI LOKASI Avg Wind Velocity for 10 min


Kecepatan angin rata-rata selama 10 menit

Water pH
Derajat Keasaman Air

Avg Yearly Temperature


Suhu rata-rata per tahun

Max Wind Velocity


Kecepatan Angin Tertinggi

- Electrical Conductivity
- Daya Hantar listrik

Max Ambient Temperature


Suhu Linkungan tertinggi

Design Basic Earthquake Horiz.


Design Dasar Gempa mendatar

- Dissolved Oxygen
- Kandungan Oksigen

Min Ambient Temperature


Suhu Linkungan terendah

Design Basic Earthquake Vert.


Design Dasar Gempa Vertikal

- Total Suspended Solids


- Jumlah zat yg terikat

Avg Relative Humidity 24h


Kelembapan relatif rata-rata 24 jam

Max Credible Earthquake Horiz.


Data Gempa mendatar tertinggi

- Dissolved Solid Matters


- Benda Padat Terlarut

Avg Relative Humidity 1month


Kelembapan relatif rata-rata 1 bulan

Max Credible Earthquake Vert.


Data Gempa mendatar Vertikal

- Chloride
- kloride

Max Relative Humidity


Kelembapan Relatif tertinggi

River Water Temperature


Suhu Air Sungai

_____ C
/ INFORMASI TRANSPORTASI

- Sulfate
- Sulfate

Nearest Road
Jalan terdekat

TRANSPORT INFORMATION Maximum Transport Length


Total Panjang Angkutan

________ m ________ m ________ m ________ m

Paved Access Route


Jalan Akses yang rata

Yes / No

Nearest Railrd
Rel terdekat

Maximum Transport Width


Total Lebar Angkutan

Number of Bridges to Site


Jumlah jembatan di lapangan

Nearest Seaport
Pelabuhan Terdekat

Maximum Transport Height


Total Tinggi Angkutan

Lowest Load Capacity of Bridge


Kapasitas Beban Terendah dari Jembatan

Nearest Airport
Bandara Terdekat

Maximum Transport Weight


Total Berat Angkutan

Lowest Capacity Bridge Length


Kapasitas Terendah dari Panjang Jembatan

Minimum Turning Radius


Rotasi Pembelokan Minimum

Minimum Bridge Clear Width


Lebar minimum Aman Dari Jembatan

Transport Route Survey Avail.


Peninjauan rute Angkutan

Yes / No

Maximum Slope / Incline


Sudut Kemiringan Maksimum

Minimum Bridge Clear Height


Tinggi minimum Aman Dari Jembatan / CATATAN

NOTES All drawings shall be provided in AutoCAD format Attach copy of all licenses/permits obtained