Prices of material on 6/2002
CONSTRUCTION PERIOD : 30 days +29 MONTHS
Preliminries
No.
Cost
Month
Total
Project Manager
7,000.00
16
112,000.00
Engineer
6,000.00
16
Forman
3,000.00
16
48,000.00
1,500.00
16
24,000.00
Temprory Office
10,000.00
20,000.00
600
30.00
18,000.00
Sign boards
5,000.00
10,000.00
8,000.00
72,000.00
Lift + Oparator
6,500.00
52,000.00
Services fees
20,000.00
20,000.00
3,000.00
12
36,000.00
Guest
500.00
16
8,000.00
3,000.00
16
48,000.00
0.5%
3,000.00
Insurance
0.10
6,000,000.00
Stasionary
200.00
12
2,400.00
Protection
6,000.00
18,000.00
Page 1
Total
491,400.00
Total
491,400.00
Page 2
15
250
116.00
136.80
147.55
121.00
142.05
152.80
20
300
25
350
119.00
139.95
150.70
123.00
144.15
154.90
121.00
142.05
152.80
126.00
147.30
158.05
T. steel
1,350.00
Epoxy St.
1,800.00
30
370
129.00
150.45
161.20
134.00
155.70
166.45
133.00
154.65
165.40
138.00
159.90
170.65
35
380
136.00
157.80
168.55
141.00
163.05
173.80
189.55
190.00
Steel
Q. Steel
1,350.00
17
280
Blinding
SRC - 250 kg/m3
conc.
lab. char.
142.05
Carb. pr.
5.00
Page 3
40.00
Polythene
p/M3
2.50
Reinforced Concrete
Dry Cost
conc.
lab. char.
Carpenter
Shutr.
Scaffold.
RESIDENTIAL BUILDING
SRC - 400 kg/m3
PileCap - 190 KG/M3
50N/mm2
50N/mm2
50N/mm2
50N/mm2
50N/mm2
50N/mm2
577.00
1,500.00
1,555.00
630.00
514.00
391.00
171.70
8.00
70.00
15.00
171.70
10.00
70.00
50.00
171.70
8.00
70.00
40.00
171.70
8.00
70.00
60.00
171.70
8.00
70.00
25.00
171.70
8.00
30.00
637.00
534.00
552.00
529.00
466.00
514.00
536.00
320.00
166.45
8.00
70.00
45.00
166.45
8.00
70.00
25.00
25.00
166.45
8.00
70.00
30.00
25.00
166.45
8.00
70.00
45.00
166.45
8.00
70.00
25.00
25.00
166.45
8.00
70.00
25.00
25.00
166.45
8.00
70.00
25.00
166.45
8.00
70.00
25.00
Page 4
Concrete Blocks
Size of blocks
Price / 1000 Nos.
8" H
6" H
1,300.00
4"
1,200.00
8"
1,100.00
6" S
2,100.00
4" S
2,000.00
1,800.00
Light Weight
8" H
6" H
3,600.00
6" Hordi
8" Hordi
1,400.00
4"
3,400.00
H
3,100.00
10" Hordi
1,500.00
1,700.00
12" Hordi
1,800.00
14" Hordi
1,900.00
Aggregates
3/4"Gr.
3/8" Gr.
18.00
S.Water
W.B.Sand
15.00
N.Water
400.00
250.00
Page 5
20.00
P.Cement
13.25
B. Sand
W.Wh.sand
20.00
S.Cement
14.00
55.00
Road base
460.00
Sabkha
10.00
Kashra
80.00
BLOCK WORK
Cost of Mix for Blockwork
Cost of mix
No.
Total - Dhs.
cement (RAK)
10.50
63.00
sand (M3)
20.00
20.00
water (lit.)
40
0.02
0.80
labour
10.00
10.00
98.49
SOLID 8"
8" walls
2.48
2.48
44.50
27.04
Labour charge
8.00
Labour charge
8.00
4.00
3.00
65.00
59.00
6" walls
cost of mix per m2
1.86
42.02
Labour charge
8.00
4.00
62.00
56.00
4" walls
cost of mix per m2
1.24
38.32
Labour charge
8.00
4.00
58.00
52.00
Page 6
41.00
Page 7
PLASTER
Cost of mix/M3
98.5
Internal plaster
External plaster
mix
2.2
mix
subcontractor
7.0
subcontractor
12.0
2.0
2.5
1.0
1.0
Scaffolding
Scaffolding
price / m2
13.00
price / m2
18.00
15.00
Page 8
2.2
20.00
Paints (NATIONAL)
Emulsion
(Fenomastic)
Emulsion (Normal)
5.23
Oil Paint
Acrylic Epoxy
5.23
5.23
Cement tiles
M.25x25
M.30x30
14.00
mix 5 cm thk.
Cem 50x50
16.50
M. steps
15.00
45.00
4.9
4.9
4.9
4.9
14.3
16.8
15.3
45.9
1.0
1.0
1.0
1.0
subcontractor
7.0
7.0
7.0
7.0
1.0
1.0
1.0
1.0
32.00
34.00
33.00
66.00
mosaic tiles
10 Ceramic tiles
kitchen
bath
floors
walls
wall ceramic
kitch
lift lobby
blaster
5.2
ceramic
0.0
0.5
subcontractor
6.0
3.0
14.7
Page 9
living
5.2
12.0
0.5
9.0
4.0
30.7
12.4
25.0
0.5
12.0
4.0
53.9
flooring ceramic
mix
6.9
6.9
6.5
ceramic
0.0
14.0
12.0
0.5
0.5
0.5
subcontractor
6.0
9.0
9.0
grouting
2.0
2.0
2.0
15.4
32.4
30.0
7.9
granite
250.0
0.5
subcontractor
60.0
grouting
2.0
320.4
Page 10
Page 11
160,000.00
Page 12
Page 13
40
400
139.00
160.95
171.70
144.00
166.20
176.95
50
450
149.00
166.45
154.00
171.70
Page 14
Steel
Steel Fitt.
Test &
Curing
Supervsi
on
Total /m3
256.50
40.00
15.00
577.00
1,147.50
40.00
10.00
1,500.00
1,215.00
40.00
10.00
1,555.00
270.00
40.00
10.00
630.00
189.00
40.00
10.00
514.00
130.95
40.00
10.00
391.00
297.00
40.00
10.00
637.00
189.00
40.00
10.00
534.00
202.50
40.00
10.00
552.00
189.00
40.00
10.00
529.00
121.50
40.00
10.00
466.00
168.75
40.00
10.00
514.00
216.00
40.00
10.00
536.00
40.00
10.00
320.00
-
Page 15
Backfiling
6.50
Page 16
SOLID 8"
46.00
Page 17
Page 18
Page 19
13.0
0.0
0.5
9.0
4.0
26.5
Garb. r.
health.
13.0
0.0
0.5
9.0
4.0
26.5
13.0
0.0
0.5
9.0
4.0
26.5
Page 20
living
6.9
6.9
6.9
6.9
0.0
0.0
0.0
0.0
0.5
0.5
0.5
0.5
9.0
9.0
9.0
9.0
2.0
2.0
2.0
2.0
18.4
18.4
18.4
18.4
Page 21
Page 22
Page 23
Page 24
Page 25
380.00
616.53
680.00
535.00
525.00
530.00
576.00
500.00
450.00
455.00
535.00
525.00
575.00
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31