UNIT 2 Pending Permits


Permit No.
Date
663
18/7/13
671
26/7/13
717 04/08/13
719
22/8/13
724
26/8/13
705
27/8/13
707
27/8/13
731
30/8/13
300002028817
30/8/13
732
30/8/13
750 07/09/13
2621 10/09/13
722 11/09/13
2638 20/09/2013
2663 08/10/13
2669 10/10/13
2677 16/10/13
2688 21/10/13
9116 14/11/13
2694 15/11/13
9152 09/12/13
9158 13/12/13
9162 16/12/13
9173 17/12/13
9159 19/12/13
30000215944 21/12/13
9184
24/1/13
8720 03/01/14
8735 09/01/14
8736 09/01/14
8737 09/02/14
300002177705 16/01/14
8744
17/1/14
8740
17/1/15
8748
17/1/14
8650
21/1/14
8751
23/1/14
8752
23/1/14
8753
24/1/14
8754
24/1/14
8767
25/1/14
8772
25/1/14
8773
25/1/15

Description
SAPH-2B soot blower piping work
GT-2 cooler Circuit marsh box 1&2 out for cable replacement
CW p/p-3 for transferring cylinder
connection of extraction of drip lines
SGECW-2A contactor replacement
UST-2A tap changing
SST-2B tap changing
removal of LP outer casing and pedastal
UST-2B tap changing
replacing of U#1 Vaccum breaker actuator with U#2 vac brkr actuator
Mill-2E for replacing coupling
FDV-5 electrical motor removal
boiler burner front
UT Xmer erection of MVW spray system
GT-2 changing lugs of bus duct Cts
SGECW-2B discharge actuator cable joining to be done
CEP- 2A thrust bearing checking
CEP-2A,2B,2C vent orifice erection
Generator bus duct changing of lugs of bus duct Cts
FD Fan attending shaft seal leakage
main turbine AOP-1,2,EOP chocking correction
PA-2B LOP-A cabling
CEP-2B bearing inspection
TMCC spare module connection to bus bar
PA 2A& 2B, boiler fill line cuplock scaffolding repair of HP joints
Swyard service T/F-2
2UA-p8,2UB-p8,2SA-p6,2SB-p-11 DC source cable termination
Mill-2A Meggar testing
Mill-2G cable termination
Mill-2J cable termination
Mill-2K cable termination
Raw water transformer -2 tap changing
SAPH-2B soot blower ispection
duct internal,external support and erection work
Inc-1,2 DG#2 inc from DG#3 control cable checking
CEP-2B cable disconnection
Eco inlet repair of defective weld joints
2SB -4,8,11,12 service limit switch wiring
Boiler ACDB sec-2 bus bar to be provided
2UB panel-4 cable termination
PA-2A cable termination
TDBFP-2B LOP-B coupling
TDBFP-2B JOP coupling

Page 1

Sheet1

Issued to
S.R. Verma
Kiran
Mohit Mittal
Mahesh
Vivekanand
Satyanarayan
Satyanarayan
M. Sadani
Kiran Sana
Vivek Chazed
Manoj Gawande
Anand Mishra
S.K. Soni
S.K. Soni
S.R. Samal
Sriharsha
S.P. Sharma
Mayank
S.R. Samal
S.R. Verma
Vikrant Singh
Vivkanand
Sanjay Dixit
Shafeek
Ankit Bagla
Kiran Sana
Sailoo
Shafeeq
V. Ingle
V. Ingle
V. Ingle
Bikshapati
Naveen
Ajit
Shailendra
Harsha
Ankit Bagla
Vivekanand
MS Meena
V. Ingle
V. Ingle
Rajeev Agarwal