Re: Fwd: Fwd: NTPL - 2 x 500 MW Power Plant at Tuticorin - Commen...

Subject: Re: Fwd: Fwd: NTPL - 2 x 500 MW Power Plant at Tuticorin - Comments on Feeder list load battery sizing calculation for UPS. From: prachi rao <prachi@bheledn.co.in> Date: Fri, 07 Dec 2012 09:37:12 +0530 To: Sathish Kumar <sathishkumars@bheledn.co.in> CC: "Archana.AT" <atarchana@bheledn.co.in>, JOSEPH ANANDA KUMAR S <joseph@bheledn.co.in>, PUNIT PRATAP SINGH <punit@bheledn.co.in>, toppo <toppo@bheledn.co.in>, ANJUL <anjul@bheledn.co.in>, BIJAY KUMAR SATAPATHY <satapathy@bheledn.co.in>, VIDYA S <vidya@bheledn.co.in>, PRABHU R <prabhu@bheledn.co.in>, LAKSHMINARAYANA S <lakshminarayanas@bheledn.co.in>, GURURAJ M <gururaj@bheledn.co.in>, RAMAKRISHNAN K C <ramakrishnankc@bheledn.co.in>, ASHA B S <ashabs@bheledn.co.in> VFD Pt.9 - There is no MMI System in VFD for this project. Hence feeder not required Regards, Prachi Rao.V Sr. Manager/ TE BHEL-Electronics Division Mysore Road, Bangalore - 560026 Landline: +91-80-26998276 Mobile : +91- 9980160918 ------------------------------------------On 07-12-2012 09:12, Sathish Kumar wrote: Please find attached the comments on the Feeder List for UPS System of Tuticorin project. Please clarify accordingly:HMI: Points 3, 4, 5, 8. SG: Point 6 VFD: Point 9 BPE-Mech: 10, 13, 15, 16, 11(if any information is available) SCADA: Point 14 Kindly reply by return e-mail immediately. Regards, S.Sathish Kumar Engineer, CE-ENGG-BPE

-------- Original Message -------Subject:Fwd: NTPL - 2 x 500 MW Power Plant at Tuticorin - Comments on Feeder list load battery sizing calculation for UPS. Date:Fri, 07 Dec 2012 08:18:55 +0530 From:Praveen Kumar R <rpraveenkumar@bheledn.co.in> To:SATHISH KUMAR S <sathishkumars@bheledn.co.in>

1 of 3

18/12/2012 9:49 AM

Re: Fwd: Fwd: NTPL - 2 x 500 MW Power Plant at Tuticorin - Commen...

For needful please.

Thanks & Regards Praveen Kumar R Engineer/CE-PMC Internal: 8308

-------- Original Message -------Subject:Fwd: NTPL - 2 x 500 MW Power Plant at Tuticorin - Comments on Feeder list load battery sizing calculation for UPS. Date:Thu, 06 Dec 2012 17:39:38 +0530 From:manoharan <manoharan@bheledn.co.in> To:RAKESH SHARMA <rakesh@bheledn.co.in>, BIJAY KUMAR SATAPATHY <satapathy@bheledn.co.in> CC:DUTTA H K <duttahk@bheledn.co.in>, Kalaiselvan K EDN GM CML <Kalaiselvan@bheledn.co.in>, VISHWANATHA B S <vishwanathab@bheledn.co.in>

This issue needs to be clarified immediately to obtain despatch clearance for miniUPS. T. Manoharan -------- Original Message -------Subject:NTPL - 2 x 500 MW Power Plant at Tuticorin - Comments on Feeder list load battery sizing calculation for UPS. Date:Thu, 06 Dec 2012 15:21:59 +0530 From:Abhay <dverma@meconlimited.co.in> To:MANOHARAN T <manoharan@bheledn.co.in>, "Navin Saxena, DGM/PMG" <pmgnavin@bhel.co.in>, "C.G.M./PSE" <cgm.pse.co@nlcindia.com>, GM PSE <gmpsenlc@yahoo.co.in>, "dgm.pse.co@nlcindia.com" <dgm.pse.co@nlcindia.com>, CHIEF EXECUTIVE OFFICER/NTPL <ceo.ntpl@nlcindia.com>, amuthukrishnan <amuthukrishnan@meconlimited.co.in>

Ref.: 11/S3/Q6G4/TA1-SG&TG/ EDN Mr T Manoharan, AGM CE-PMC Electronics Division, Bharat Heavy Electricals limited, P.B.No. 2606, Mysore Road, Bangalore 560 026 Fax No.: 080 26989214 / 26989013 / 26740137 Dear Sir, Sub : NTPL - 2 x 500 MW Power Plant at Tuticorin, Tamilnadu

Date: 06.12.12

2 of 3

18/12/2012 9:49 AM

Re: Fwd: Fwd: NTPL - 2 x 500 MW Power Plant at Tuticorin - Commen...

Ref.:

1.

TA1(SG&TG )Package BHELs transmittal ref. CE/PMC/NTPL/0651/RP/11/03 dtd. 09.11.12 (Rcvd by us on 15.11.12).

With reference to the above the drawing / document have been reviewed at our end and the status of the same is as follows: Sl. No. 1. Drawings /Document EN-DG-651-145-6006 Description Feeder list load calculation for UPS. Rev 00 Status COMMENTED

battery

sizing

The comments on the above drawing / document are enclosed herewith as annexure I. It is requested that the drawing / document please be revised / updated and submitted to us for final clearance. Thanking you. Yours faithfully For MECON Ltd.

(Devashish Verma) Sr. Manager and Project Coordinator

Copy to:

1. Shri Navin Saxena, DGM / PMG, BHEL, 5th Floor, BHEL House, Siri Fort, Khel Gaon, New Delhi
110049. Fax No.: 011 26132679 without enclosure.