Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1203

ZAPATAS

Elemento

Long

CANT

N PIEZAS

ACERO fy=4200 Kg/cm2


1/4"

3/8"

1/2"

5/8"

3/4"

1"

BLOQUE 2
Z-A
Longitudinal

1.050

0.00

0.00

0.00

6.30

0.00

0.00

0.00

Transversal

1.380

0.00

0.00

0.00

9.66

0.00

0.00

0.00

Longitudinal

0.850

0.00

0.00

0.00

34.00

0.00

0.00

0.00

Transversal

1.050

0.00

0.00

0.00

50.40

0.00

0.00

0.00

Longitudinal

0.850

0.00

0.00

0.00

8.50

0.00

0.00

0.00

Transversal

1.380

0.00

0.00

0.00

19.32

0.00

0.00

0.00

Longitudinal

0.850

0.00

0.00

0.00

8.50

0.00

0.00

0.00

Transversal

0.850

0.00

0.00

0.00

8.50

0.00

0.00

0.00

TOTAL (m)

0.00

0.00

0.00

145.18

0.00

0.00

0.00 ####

Kg / m

0.25

0.56

0.99

1.55

2.24

3.04

3.97 12.60

Sub Total (Kg)

0.00

0.00

0.00

225.03

0.00

0.00

0.00 ####

TOTAL (Tn)

0.00

0.00

0.00

0.23

0.00

0.00

0.00

Z-B

Z-B

Z-C

COLUMNA
Elemento

ACERO fy=4200 Kg/cm2


1/4"

3/8"

1/2"

5/8"

3/4"

1"

Long

CANT

N PIEZAS

4.580

16

0.00

0.00

0.00

293.12

0.00

0.00

0.00

4.580

16

0.00

0.00

146.56

0.00

0.00

0.00

0.00

4.580

0.00

0.00

27.48

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

C-1

0.720

16

29

0.00

334.08

0.00

0.00

0.00

0.00

0.00

C-2

0.720

29

0.00

20.88

0.00

0.00

0.00

0.00

0.00

3.400

16

0.00

0.00

0.00

217.60

0.00

0.00

0.00

3.300

16

0.00

0.00

105.60

0.00

0.00

0.00

0.00

3.300

0.00

0.00

19.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

C-1

0.720

16

29

0.00

334.08

0.00

0.00

0.00

0.00

0.00

C-2

0.720

29

0.00

20.88

0.00

0.00

0.00

0.00

0.00

3.400

16

0.00

0.00

0.00

217.60

0.00

0.00

0.00

3.300

16

0.00

0.00

105.60

0.00

0.00

0.00

0.00

3.300

0.00

0.00

19.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

C-1

0.720

16

29

0.00

334.08

0.00

0.00

0.00

0.00

0.00

C-2

0.720

29

0.00

20.88

0.00

0.00

0.00

0.00

0.00

3.400

16

0.00

0.00

0.00

217.60

0.00

0.00

0.00

3.300

16

0.00

0.00

105.60

0.00

0.00

0.00

0.00

3.300

0.00

0.00

19.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

C-1

0.720

16

29

0.00

334.08

0.00

0.00

0.00

0.00

0.00

C-2

0.720

29

0.00

20.88

0.00

0.00

0.00

0.00

0.00

PRIMER PISO
C-1

C-2

ESTRIBOS

SEGUNDO PISO
C-1

C-2

ESTRIBOS

TERCER PISO
C-1

C-2

ESTRIBOS

CUARTO PISO
C-1

C-2

ESTRIBOS

0.23

TOTAL (m)

0.00

1419.84

550.24

945.92

0.00

0.00

0.00 ####

Kg / m

0.25

0.56

0.99

1.55

2.24

3.04

3.97 12.60

Sub Total (Kg)

0.00

795.11

544.74

1466.18

0.00

0.00

0.00 ####

TOTAL (Tn)

0.00

0.80

0.54

1.47

0.00

0.00

0.00

VIGAS
Elemento

Long

CANT

N PIEZAS

ACERO fy=4200 Kg/cm2


1/4"

3/8"

1/2"

5/8"

3/4"

1"

PRIMER PISO
VP-1

6.870

0.00

0.00

0.00

137.40

0.00

0.00

0.00

6.670

0.00

0.00

133.40

0.00

0.00

0.00

0.00

5.470

0.00

0.00

0.00

21.88

0.00

0.00

0.00

5.270

0.00

0.00

21.08

0.00

0.00

0.00

0.00

2.600

0.00

0.00

0.00

10.40

0.00

0.00

0.00

2.400

0.00

0.00

9.60

0.00

0.00

0.00

0.00

V-AP

25.835

0.00

0.00

310.02

0.00

0.00

0.00

0.00

V-AP1 entre C-D

4.250

0.00

0.00

25.50

0.00

0.00

0.00

0.00

V-AP1 entre F'-F'

5.270

0.00

0.00

31.62

0.00

0.00

0.00

0.00

VCH-1

13.570

0.00

0.00

81.42

0.00

0.00

0.00

0.00

V-A

2.400

0.00

0.00

9.60

0.00

0.00

0.00

0.00

V-b

1.750

0.00

7.00

0.00

0.00

0.00

0.00

0.00

V-b

3.400

0.00

6.80

0.00

0.00

0.00

0.00

0.00

VP-1 eje F-F,entre 2-3

VP-1 eje F-F,entre 1-3

ESTRIBOS
VP-1

1.720

35

0.00

301.00

0.00

0.00

0.00

0.00

0.00

VP-1 eje F-F,entre 2-3

1.720

28

0.00

48.16

0.00

0.00

0.00

0.00

0.00

VP-1 eje F-F,entre 1-3

1.720

12

0.00

20.64

0.00

0.00

0.00

0.00

0.00

V-AP entre A-C

1.520

27

164.16

0.00

0.00

0.00

0.00

0.00

0.00

V-AP entre C-D

1.520

25

76.00

0.00

0.00

0.00

0.00

0.00

0.00

V-AP entre D-E

1.520

30

91.20

0.00

0.00

0.00

0.00

0.00

0.00

V-AP entre E-F

1.520

22

66.88

0.00

0.00

0.00

0.00

0.00

0.00

V-AP1 entre C-D

1.220

18

21.96

0.00

0.00

0.00

0.00

0.00

0.00

V-AP1 entre F'-F'

1.220

17

20.74

0.00

0.00

0.00

0.00

0.00

0.00

VCH-1 entre C-D

1.120

15

0.00

16.80

0.00

0.00

0.00

0.00

0.00

VCH-1 entre D-E

1.120

30

0.00

67.20

0.00

0.00

0.00

0.00

0.00

VCH-1 entre D-E

1.120

16

0.00

17.92

0.00

0.00

0.00

0.00

0.00

V-A

1.120

12

13.44

0.00

0.00

0.00

0.00

0.00

0.00

V-b

0.820

4.92

0.00

0.00

0.00

0.00

0.00

0.00

V-b

0.820

6.56

0.00

0.00

0.00

0.00

0.00

0.00

6.870

0.00

0.00

0.00

137.40

0.00

0.00

0.00

6.670

0.00

0.00

133.40

0.00

0.00

0.00

0.00

5.470

0.00

0.00

0.00

21.88

0.00

0.00

0.00

5.270

0.00

0.00

21.08

0.00

0.00

0.00

0.00

2.600

0.00

0.00

0.00

10.40

0.00

0.00

0.00

2.400

0.00

0.00

9.60

0.00

0.00

0.00

0.00

V-AP

25.835

0.00

0.00

310.02

0.00

0.00

0.00

0.00

V-AP1 entre C-D

4.250

0.00

0.00

25.50

0.00

0.00

0.00

0.00

V-AP1 entre F'-F'

5.270

0.00

0.00

31.62

0.00

0.00

0.00

0.00

VCH-1

13.570

0.00

0.00

81.42

0.00

0.00

0.00

0.00

V-A

2.400

0.00

0.00

9.60

0.00

0.00

0.00

0.00

V-b

1.750

0.00

7.00

0.00

0.00

0.00

0.00

0.00

V-b

3.400

0.00

6.80

0.00

0.00

0.00

0.00

0.00

SEGUNDO PISO
VP-1

VP-1 eje F-F,entre 2-3

VP-1 eje F-F,entre 1-3

2.81

ESTRIBOS
VP-1

1.720

35

0.00

301.00

0.00

0.00

0.00

0.00

0.00

VP-1 eje F-F,entre 2-3

1.720

28

0.00

48.16

0.00

0.00

0.00

0.00

0.00

VP-1 eje F-F,entre 1-3

1.720

12

0.00

20.64

0.00

0.00

0.00

0.00

0.00

V-AP entre A-C

1.520

27

164.16

0.00

0.00

0.00

0.00

0.00

0.00

V-AP entre C-D

1.520

25

76.00

0.00

0.00

0.00

0.00

0.00

0.00

V-AP entre D-E

1.520

30

91.20

0.00

0.00

0.00

0.00

0.00

0.00

V-AP entre E-F

1.520

22

66.88

0.00

0.00

0.00

0.00

0.00

0.00

V-AP1 entre C-D

1.220

18

21.96

0.00

0.00

0.00

0.00

0.00

0.00

V-AP1 entre F'-F'

1.220

17

20.74

0.00

0.00

0.00

0.00

0.00

0.00

VCH-1 entre C-D

1.120

15

0.00

16.80

0.00

0.00

0.00

0.00

0.00

VCH-1 entre D-E

1.120

30

0.00

67.20

0.00

0.00

0.00

0.00

0.00

VCH-1 entre D-E

1.120

16

0.00

17.92

0.00

0.00

0.00

0.00

0.00

V-A

1.120

12

13.44

0.00

0.00

0.00

0.00

0.00

0.00

V-b

0.820

4.92

0.00

0.00

0.00

0.00

0.00

0.00

V-b

0.820

6.56

0.00

0.00

0.00

0.00

0.00

0.00

6.870

0.00

0.00

0.00

137.40

0.00

0.00

0.00

6.670

0.00

0.00

133.40

0.00

0.00

0.00

0.00

5.470

0.00

0.00

0.00

21.88

0.00

0.00

0.00

5.270

0.00

0.00

21.08

0.00

0.00

0.00

0.00

2.600

0.00

0.00

0.00

10.40

0.00

0.00

0.00

2.400

0.00

0.00

9.60

0.00

0.00

0.00

0.00

V-AP

25.835

0.00

0.00

310.02

0.00

0.00

0.00

0.00

V-AP1 entre C-D

4.250

0.00

0.00

25.50

0.00

0.00

0.00

0.00

V-AP1 entre F'-F'

5.270

0.00

0.00

31.62

0.00

0.00

0.00

0.00

VCH-1

13.570

0.00

0.00

81.42

0.00

0.00

0.00

0.00

V-A

2.400

0.00

0.00

9.60

0.00

0.00

0.00

0.00

V-b

1.750

0.00

7.00

0.00

0.00

0.00

0.00

0.00

V-b

3.400

0.00

6.80

0.00

0.00

0.00

0.00

0.00

TERCER PISO
VP-1

VP-1 eje F-F,entre 2-3

VP-1 eje F-F,entre 1-3

ESTRIBOS
VP-1

1.720

35

0.00

301.00

0.00

0.00

0.00

0.00

0.00

VP-1 eje F-F,entre 2-3

1.720

28

0.00

48.16

0.00

0.00

0.00

0.00

0.00

VP-1 eje F-F,entre 1-3

1.720

12

0.00

20.64

0.00

0.00

0.00

0.00

0.00

V-AP entre A-C

1.520

27

164.16

0.00

0.00

0.00

0.00

0.00

0.00

V-AP entre C-D

1.520

25

76.00

0.00

0.00

0.00

0.00

0.00

0.00

V-AP entre D-E

1.520

30

91.20

0.00

0.00

0.00

0.00

0.00

0.00

V-AP entre E-F

1.520

22

66.88

0.00

0.00

0.00

0.00

0.00

0.00

V-AP1 entre C-D

1.220

18

21.96

0.00

0.00

0.00

0.00

0.00

0.00

V-AP1 entre F'-F'

1.220

17

20.74

0.00

0.00

0.00

0.00

0.00

0.00

VCH-1 entre C-D

1.120

15

0.00

16.80

0.00

0.00

0.00

0.00

0.00

VCH-1 entre D-E

1.120

30

0.00

67.20

0.00

0.00

0.00

0.00

0.00

VCH-1 entre D-E

1.120

16

0.00

17.92

0.00

0.00

0.00

0.00

0.00

V-A

1.120

12

13.44

0.00

0.00

0.00

0.00

0.00

0.00

V-b

0.820

4.92

0.00

0.00

0.00

0.00

0.00

0.00

V-b

0.820

6.56

0.00

0.00

0.00

0.00

0.00

0.00

CUARTO PISO
VP-1

6.870

0.00

0.00

0.00

137.40

0.00

0.00

0.00

6.670

0.00

0.00

133.40

0.00

0.00

0.00

0.00

5.470

0.00

0.00

0.00

21.88

0.00

0.00

0.00

5.270

0.00

0.00

21.08

0.00

0.00

0.00

0.00

2.600

0.00

0.00

0.00

10.40

0.00

0.00

0.00

2.400

0.00

0.00

9.60

0.00

0.00

0.00

0.00

V-AP

25.835

0.00

0.00

310.02

0.00

0.00

0.00

0.00

V-AP1 entre C-D

4.250

0.00

0.00

25.50

0.00

0.00

0.00

0.00

V-AP1 entre F'-F'

5.270

0.00

0.00

31.62

0.00

0.00

0.00

0.00

VCH-1

13.570

0.00

0.00

81.42

0.00

0.00

0.00

0.00

V-A

2.400

0.00

0.00

9.60

0.00

0.00

0.00

0.00

V-b

1.750

0.00

7.00

0.00

0.00

0.00

0.00

0.00

V-b

3.400

0.00

6.80

0.00

0.00

0.00

0.00

0.00

VP-1 eje F-F,entre 2-3

VP-1 eje F-F,entre 1-3

ESTRIBOS
VP-1

1.720

35

0.00

301.00

0.00

0.00

0.00

0.00

0.00

VP-1 eje F-F,entre 2-3

1.720

28

0.00

48.16

0.00

0.00

0.00

0.00

0.00

VP-1 eje F-F,entre 1-3

1.720

12

0.00

20.64

0.00

0.00

0.00

0.00

0.00

V-AP entre A-C

1.520

27

164.16

0.00

0.00

0.00

0.00

0.00

0.00

V-AP entre C-D

1.520

25

76.00

0.00

0.00

0.00

0.00

0.00

0.00

V-AP entre D-E

1.520

30

91.20

0.00

0.00

0.00

0.00

0.00

0.00

V-AP entre E-F

1.520

22

66.88

0.00

0.00

0.00

0.00

0.00

0.00

V-AP1 entre C-D

1.220

18

21.96

0.00

0.00

0.00

0.00

0.00

0.00

V-AP1 entre F'-F'

1.220

17

20.74

0.00

0.00

0.00

0.00

0.00

0.00

VCH-1 entre C-D

1.120

15

0.00

16.80

0.00

0.00

0.00

0.00

0.00

VCH-1 entre D-E

1.120

30

0.00

67.20

0.00

0.00

0.00

0.00

0.00

VCH-1 entre D-E

1.120

16

0.00

17.92

0.00

0.00

0.00

0.00

0.00

V-A

1.120

12

13.44

0.00

0.00

0.00

0.00

0.00

0.00

V-b

0.820

4.92

0.00

0.00

0.00

0.00

0.00

0.00

V-b

0.820

6.56

0.00

0.00

0.00

0.00

0.00

0.00

TOTAL (m)

1863.44

1942.08

2488.96

678.72

0.00

0.00

0.00 ####

Kg / m

0.25

0.56

0.99

1.55

2.24

3.04

3.97 12.60

Sub Total (Kg)

465.86

1087.56

2464.07

1052.02

0.00

0.00

0.00 ####

TOTAL (Tn)

0.47

1.09

2.46

1.05

0.00

0.00

0.00

5.07

LOSA ALIGERADA
Elemento

ACERO fy=4200 Kg/cm2

1/4"

3/8"

1/2"

5/8"

3/4"

1"

Long

CANT

N PIEZAS

8.085

10

0.00

0.00

80.85

0.00

0.00

0.00

0.00

5.940

10

0.00

0.00

59.40

0.00

0.00

0.00

0.00

10.535

0.00

0.00

21.07

0.00

0.00

0.00

0.00

7.890

0.00

0.00

15.78

0.00

0.00

0.00

0.00

8.650

0.00

0.00

17.30

0.00

0.00

0.00

0.00

6.640

0.00

0.00

13.28

0.00

0.00

0.00

0.00

7.800

0.00

0.00

15.60

0.00

0.00

0.00

0.00

5.760

0.00

0.00

11.52

0.00

0.00

0.00

0.00

3.300

0.00

0.00

13.20

0.00

0.00

0.00

0.00

2.660

0.00

0.00

10.64

0.00

0.00

0.00

0.00

3.200

0.00

0.00

12.80

0.00

0.00

0.00

0.00

2.600

0.00

0.00

10.40

0.00

0.00

0.00

0.00

7.800

0.00

0.00

23.40

0.00

0.00

0.00

0.00

5.760

0.00

0.00

17.28

0.00

0.00

0.00

0.00

2.744

0.00

0.00

8.23

0.00

0.00

0.00

0.00

2.894

0.00

0.00

8.68

0.00

0.00

0.00

0.00

2.670

0.00

0.00

8.01

0.00

0.00

0.00

0.00

2.970

0.00

0.00

8.91

0.00

0.00

0.00

0.00

3.257

0.00

0.00

6.51

0.00

0.00

0.00

0.00

3.407

0.00

0.00

6.81

0.00

0.00

0.00

0.00

164.285

164.29

0.00

0.00

0.00

0.00

0.00

0.00

17.250

17.25

0.00

0.00

0.00

0.00

0.00

0.00

7.500

7.50

0.00

0.00

0.00

0.00

0.00

0.00

31.250

31.25

0.00

0.00

0.00

0.00

0.00

0.00

75.250

75.25

0.00

0.00

0.00

0.00

0.00

0.00

23.350

23.35

0.00

0.00

0.00

0.00

0.00

0.00

24.150

24.15

0.00

0.00

0.00

0.00

0.00

0.00

45.050

45.05

0.00

0.00

0.00

0.00

0.00

0.00

PRIMER PISO
BLOQUE 1
VIGUETA

BLOQUE 2
VIGUETA

BLOQUE 3
VIGUETA

BLOQUE 4
VIGUETA

BLOQUE 5
VIGUETA

BLOQUE 6
VIGUETA

BLOQUE 7
VIGUETA

BLOQUE 8
VIGUETA

BLOQUE 9
VIGUETA

BLOQUE 10
VIGUETA

TEMPERATURA

SEGUNDO PISO
BLOQUE 1
VIGUETA

8.085

10

0.00

0.00

80.85

0.00

0.00

0.00

0.00

5.940

10

0.00

0.00

59.40

0.00

0.00

0.00

0.00

10.535

0.00

0.00

21.07

0.00

0.00

0.00

0.00

7.890

0.00

0.00

15.78

0.00

0.00

0.00

0.00

8.650

0.00

0.00

17.30

0.00

0.00

0.00

0.00

6.640

0.00

0.00

13.28

0.00

0.00

0.00

0.00

7.800

0.00

0.00

15.60

0.00

0.00

0.00

0.00

5.760

0.00

0.00

11.52

0.00

0.00

0.00

0.00

3.300

0.00

0.00

13.20

0.00

0.00

0.00

0.00

2.660

0.00

0.00

10.64

0.00

0.00

0.00

0.00

3.200

0.00

0.00

12.80

0.00

0.00

0.00

0.00

2.600

0.00

0.00

10.40

0.00

0.00

0.00

0.00

7.800

0.00

0.00

23.40

0.00

0.00

0.00

0.00

5.760

0.00

0.00

17.28

0.00

0.00

0.00

0.00

2.744

0.00

0.00

8.23

0.00

0.00

0.00

0.00

2.894

0.00

0.00

8.68

0.00

0.00

0.00

0.00

2.670

0.00

0.00

8.01

0.00

0.00

0.00

0.00

2.970

0.00

0.00

8.91

0.00

0.00

0.00

0.00

3.257

0.00

0.00

6.51

0.00

0.00

0.00

0.00

3.407

0.00

0.00

6.81

0.00

0.00

0.00

0.00

164.285

164.29

0.00

0.00

0.00

0.00

0.00

0.00

17.250

17.25

0.00

0.00

0.00

0.00

0.00

0.00

7.500

7.50

0.00

0.00

0.00

0.00

0.00

0.00

31.250

31.25

0.00

0.00

0.00

0.00

0.00

0.00

75.250

75.25

0.00

0.00

0.00

0.00

0.00

0.00

23.350

23.35

0.00

0.00

0.00

0.00

0.00

0.00

24.150

24.15

0.00

0.00

0.00

0.00

0.00

0.00

45.050

45.05

0.00

0.00

0.00

0.00

0.00

0.00

BLOQUE 2
VIGUETA

BLOQUE 3
VIGUETA

BLOQUE 4
VIGUETA

BLOQUE 5
VIGUETA

BLOQUE 6
VIGUETA

BLOQUE 7
VIGUETA

BLOQUE 8
VIGUETA

BLOQUE 9
VIGUETA

BLOQUE 10
VIGUETA

TEMPERATURA

TERCER PISO
BLOQUE 1
VIGUETA

8.085

10

0.00

0.00

80.85

0.00

0.00

0.00

0.00

5.940

10

0.00

0.00

59.40

0.00

0.00

0.00

0.00

10.535

0.00

0.00

21.07

0.00

0.00

0.00

0.00

7.890

0.00

0.00

15.78

0.00

0.00

0.00

0.00

8.650

0.00

0.00

17.30

0.00

0.00

0.00

0.00

6.640

0.00

0.00

13.28

0.00

0.00

0.00

0.00

7.800

0.00

0.00

15.60

0.00

0.00

0.00

0.00

5.760

0.00

0.00

11.52

0.00

0.00

0.00

0.00

3.300

0.00

0.00

13.20

0.00

0.00

0.00

0.00

2.660

0.00

0.00

10.64

0.00

0.00

0.00

0.00

3.200

0.00

0.00

12.80

0.00

0.00

0.00

0.00

2.600

0.00

0.00

10.40

0.00

0.00

0.00

0.00

7.800

0.00

0.00

23.40

0.00

0.00

0.00

0.00

5.760

0.00

0.00

17.28

0.00

0.00

0.00

0.00

2.744

0.00

0.00

8.23

0.00

0.00

0.00

0.00

2.894

0.00

0.00

8.68

0.00

0.00

0.00

0.00

2.670

0.00

0.00

8.01

0.00

0.00

0.00

0.00

2.970

0.00

0.00

8.91

0.00

0.00

0.00

0.00

3.257

0.00

0.00

6.51

0.00

0.00

0.00

0.00

3.407

0.00

0.00

6.81

0.00

0.00

0.00

0.00

164.285

164.29

0.00

0.00

0.00

0.00

0.00

0.00

17.250

17.25

0.00

0.00

0.00

0.00

0.00

0.00

7.500

7.50

0.00

0.00

0.00

0.00

0.00

0.00

31.250

31.25

0.00

0.00

0.00

0.00

0.00

0.00

75.250

75.25

0.00

0.00

0.00

0.00

0.00

0.00

23.350

23.35

0.00

0.00

0.00

0.00

0.00

0.00

24.150

24.15

0.00

0.00

0.00

0.00

0.00

0.00

45.050

45.05

0.00

0.00

0.00

0.00

0.00

0.00

BLOQUE 2
VIGUETA

BLOQUE 3
VIGUETA

BLOQUE 4
VIGUETA

BLOQUE 5
VIGUETA

BLOQUE 6
VIGUETA

BLOQUE 7
VIGUETA

BLOQUE 8
VIGUETA

BLOQUE 9
VIGUETA

BLOQUE 10
VIGUETA

TEMPERATURA

CUARTO PISO
BLOQUE 1
VIGUETA

8.085

10

0.00

0.00

80.85

0.00

0.00

0.00

0.00

5.940

10

0.00

0.00

59.40

0.00

0.00

0.00

0.00

10.535

0.00

0.00

21.07

0.00

0.00

0.00

0.00

7.890

0.00

0.00

15.78

0.00

0.00

0.00

0.00

8.650

0.00

0.00

17.30

0.00

0.00

0.00

0.00

6.640

0.00

0.00

13.28

0.00

0.00

0.00

0.00

7.800

0.00

0.00

15.60

0.00

0.00

0.00

0.00

5.760

0.00

0.00

11.52

0.00

0.00

0.00

0.00

3.300

0.00

0.00

13.20

0.00

0.00

0.00

0.00

2.660

0.00

0.00

10.64

0.00

0.00

0.00

0.00

3.200

0.00

0.00

12.80

0.00

0.00

0.00

0.00

2.600

0.00

0.00

10.40

0.00

0.00

0.00

0.00

7.800

0.00

0.00

23.40

0.00

0.00

0.00

0.00

5.760

0.00

0.00

17.28

0.00

0.00

0.00

0.00

2.744

0.00

0.00

8.23

0.00

0.00

0.00

0.00

2.894

0.00

0.00

8.68

0.00

0.00

0.00

0.00

2.670

0.00

0.00

8.01

0.00

0.00

0.00

0.00

2.970

0.00

0.00

8.91

0.00

0.00

0.00

0.00

3.257

0.00

0.00

6.51

0.00

0.00

0.00

0.00

3.407

0.00

0.00

6.81

0.00

0.00

0.00

0.00

164.285

164.29

0.00

0.00

0.00

0.00

0.00

0.00

17.250

17.25

0.00

0.00

0.00

0.00

0.00

0.00

7.500

7.50

0.00

0.00

0.00

0.00

0.00

0.00

31.250

31.25

0.00

0.00

0.00

0.00

0.00

0.00

75.250

75.25

0.00

0.00

0.00

0.00

0.00

0.00

23.350

23.35

0.00

0.00

0.00

0.00

0.00

0.00

24.150

24.15

0.00

0.00

0.00

0.00

0.00

0.00

45.050

45.05

0.00

0.00

0.00

0.00

0.00

0.00

TOTAL (m)

1552.34

0.00

1478.72

0.00

0.00

0.00

0.00

####

Kg / m

0.25

0.56

0.99

1.55

2.24

3.04

3.97

12.60

Sub Total (Kg)

388.09

0.00

1463.94

0.00

0.00

0.00

0.00

TOTAL (Tn)

0.39

0.00

1.46

0.00

0.00

0.00

0.00

####
1.85

BLOQUE 2
VIGUETA

BLOQUE 3
VIGUETA

BLOQUE 4
VIGUETA

BLOQUE 5
VIGUETA

BLOQUE 6
VIGUETA

BLOQUE 7
VIGUETA

BLOQUE 8
VIGUETA

BLOQUE 9
VIGUETA

BLOQUE 10
VIGUETA

TEMPERATURA

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM

DESCRIPCIN

01.00.00

OBRAS PRELIMINARES

01.01.00

TRAZO, NIVELACION Y REPLANTEO

UND CANT LARGO ANCHO

MOVIMIENTO DE TIERRAS

02.01.00

EXCAVACION PARA CIMIENTOS CORRIDOS

SUB-TOTAL

M2

TERRENO
02.00.00

ALTO

METRADO

114.02
1

Area =

114.02

114.02

M3

22.40

CC-1 eje 1-1

12.78

0.40

0.80

8.18

CC-2 eje C-C

3.44

0.50

0.80

1.38

CC-2 Entre eje C-D

7.87

0.50

0.80

3.15

CC-2 Entre eje D-E

5.93

0.50

0.80

2.37

CC-2 Entre eje E-F

2.69

0.50

0.80

1.08

CC-2 eje D-D

1.73

0.50

0.80

0.69

CC-2 eje E-E

3.45

0.50

0.80

1.38

CC-2 eje F-F

2.52

0.50

0.80

1.01

CC-2 Entre eje E-F

0.47

0.50

0.80

0.19

CC-3 entre eje A-C

7.46

0.50

0.80

2.98

Z-A

1.53

1.20

1.70

3.12

Z-B

1.20

1.00

1.70

16.32

Z-B

1.53

1.00

1.70

5.20

Z-C

1.00

1.00

1.70

3.40

Z-A

1.23

1.20

0.90

1.33

Z-B

0.90

1.00

0.90

6.48

Z-B

1.23

1.00

0.90

1.11

Z-C

0.70

1.00

0.90

1.26

CC-1 eje 1-1

12.78

0.25

0.10

0.64

CC-2 eje C-C

3.44

0.35

0.10

0.12

CC-2 Entre eje C-D

7.87

0.35

0.10

0.28

CC-2 Entre eje D-E

5.93

0.35

0.10

0.21

CC-2 Entre eje E-F

2.69

0.35

0.10

0.09

CC-2 eje D-D

1.73

0.35

0.10

0.06

CC-2 eje E-E

3.45

0.35

0.10

0.12

CC-2 eje F-F

2.52

0.35

0.10

0.09

CC-2 Entre eje E-F

0.47

0.21

0.10

0.01

CC-3 entre eje A-C

7.46

0.50

0.10

0.37

Eje 3-3

02.02.00

02.03.00

EXCAVACION PARA ZAPATAS Y CISTERNA

RELLENO CON MATERIAL PROPIO

M3

28.04

M3

12.16

Eje 3-3

02.04.00

NIVELACION Y COMPACTADO DEL TERRENO

M2

Terreno
02.05.00

114.02
1

Area =

Proveniente de la excavacion de cimiento

22.40

Proveniente de la excavacion de zapatas

28.04

Relleno con material Propio

12.16

ACARRREO DE MATERIAL EXCEDENTE

114.02

114.02

M3

49.77
38.28

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM
02.06.00

DESCRIPCIN
ELIMINACION DEL MATERIAL EXCEDENTE

22.40

Proveniente de la excavacion de zapatas

28.04

Relleno con material Propio

12.16

OBRAS DE CONCRETO SIMPLE


SUB ZAPATA CONCRETO C:H; 1:10 + 30% DE P.G.

SUB-TOTAL
38.28

M3

3.30

Z-A

1.53

1.20

0.20

0.37

Z-B

1.20

1.00

0.20

1.92

Z-B

1.53

1.00

0.20

0.61

Z-C

1.00

1.00

0.20

0.40

CC-1 eje 1-1

22.85

0.40

0.80

14.62

CC-1 eje 1-1

2.13

0.10

0.80

0.34

CC-2 eje C-C

4.04

0.50

0.80

1.62

CC-2 Entre eje C-D

7.87

0.50

0.80

3.15

CC-2 Entre eje D-E

5.93

0.50

0.80

2.37

CC-2 Entre eje E-F

3.61

0.50

0.80

1.44

CC-2 Entre eje E-F

0.45

0.03

0.80

0.01

CC-2 eje D-D

2.33

0.50

0.80

0.93

CC-2 eje E-E

4.05

0.50

0.80

1.62

CC-2 eje F-F

3.57

0.36

0.80

1.03

CC-2 Entre eje E-F

0.65

0.18

0.80

0.09

CC-3 entre eje A-C

7.46

0.50

0.80

2.98

CC-1 eje 1-1

23.05

0.15

0.30

2.07

CC-2 eje C-C

2.62

0.15

0.30

0.12

CC-2 Entre eje C-D

7.64

0.15

0.30

0.34

CC-2 Entre eje D-E

5.63

0.15

0.30

0.25

CC-2 Entre eje E-F

3.97

0.15

0.30

0.18

CC-2 eje D-D

1.67

0.15

0.30

0.08

CC-2 eje E-E

3.62

0.15

0.30

0.16

CC-2 eje F-F

2.77

0.15

0.30

0.12

CC-1 eje 1-1

23.05

0.30

27.66

CC-2 eje C-C

2.62

0.30

1.57

CC-2 Entre eje C-D

7.64

0.30

4.58

CC-2 Entre eje D-E

5.63

0.30

3.38

CC-2 Entre eje E-F

3.97

0.30

2.38

CC-2 eje D-D

1.67

0.30

1.00

CC-2 eje E-E

3.62

0.30

2.17

CC-2 eje F-F

2.77

0.30

1.66

CIMIENTO CORRIDO CONCRETO C:H; 1:10 + 30% DE P.G.

METRADO
49.77

03.01.00

ALTO

M3

Proveniente de la excavacion de cimiento

03.00.00

03.02.00

UND CANT LARGO ANCHO

M3

30.21

Eje 3-3

03.03.00

SOBRECIMIENTO CONCRETO 1:8 + 25% DE P.M.

M3

3.33

Eje 3-3

03.04.00

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

M2

44.41

Eje 3-3

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM
03.05.00

DESCRIPCIN
FALSO PISO DE 4 " DE CEMENTO-HORMIGON 1:10

UND CANT LARGO ANCHO

ALTO

SUB-TOTAL

M2

102.03

Dormitorio

1 rea

12.39

12.39

Bao

1 rea

2.52

2.52

Cocina

1 rea

7.20

7.20

Pasadizo,Bao

1 rea

7.13

7.13

Bao

1 rea

1.68

1.68

Local Comercial

1 rea

32.21

32.21

Hall,Estar,Pasadizo

1 rea

35.47

35.47

1 rea

3.43

3.43

04.00.00

OBRAS DE CONCRETO ARMADO

04.01.00

ZAPATA

04.01.01

CONCRETO EN ZAPATAS FC= 210 KG/CM2

M3

11.55

Z-A

1.53

1.20

0.70

1.29

Z-B

1.20

1.00

0.70

6.72

Z-B

1.53

1.00

0.70

2.14

Z-C

1.00

1.00

0.70

1.40

04.01.02

ACERO DE REFUERZO FY = 4200 KG/CM2

KG

04.01.03

ENCOFRADO Y DESENCOFRADO NORMAL

M2

225.03
41.15

Z-A

Z-A

Z-B

Z-B

Z-B

16

Z-B

16

Z-C

04.02.00

COLUMNAS

04.02.01

CONCRETO EN COLUMNAS FC = 210 KG/CM

METRADO

1.53
1.20
1.53
1.00
1.20
1.00
1.00

0.70

2.14

0.70

1.68

0.70

4.28

0.70

2.80

0.70

13.44

0.70

11.20

0.70

5.60

M3

18.14

PRIMER PISO
C-01

16

Area =

0.09

3.40

4.90

C-02

Area =

0.18

3.40

0.61

C-01

16

Area =

0.09

2.60

3.74

C-02

Area =

0.18

2.60

0.47

C-01

16

Area =

0.09

2.60

3.74

C-02

Area =

0.18

2.60

0.47

C-01

16

Area =

0.09

2.60

3.74

C-02

Area =

0.18

2.60

0.47

SEGUNDO PISO

TERCER PISO

CUARTO

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM
04.02.02

DESCRIPCIN

UND CANT LARGO ANCHO

ALTO

SUB-TOTAL

ENCOFRADO Y DESENCOFRADO CARAVISTA COLUMNAS M2

METRADO
235.20

PRIMER PISO
C-01

64

C-02

C-02

0.30

3.40

65.28

3.40

2.04

0.60

3.40

4.08

0.30

2.60

49.92

2.60

1.56

0.60

2.60

3.12

0.30

2.60

49.92

2.60

1.56

0.60

2.60

3.12

0.30

2.60

49.92

2.60

1.56

2.60

3.12

0.30

SEGUNDO PISO
C-01

64

C-02

C-02

0.30

TERCER PISO
C-01

64

C-02

C-02

0.30

CUARTO
C-01

64

C-02

C-02

0.30
0.60

04.02.03

ACERO DE REFUERZO F'Y= 4200 KG/CM2

KG

2806.02

04.02.04

CURADO

M2

235.20

PRIMER PISO
C-01

64

C-02

C-02

0.30

3.40

65.28

3.40

2.04

0.60

3.40

4.08

0.30

2.60

49.92

2.60

1.56

0.60

2.60

3.12

0.30

2.60

49.92

2.60

1.56

0.60

2.60

3.12

0.30

2.60

49.92

2.60

1.56

2.60

3.12

0.30

SEGUNDO PISO
C-01

64

C-02

C-02

0.30

TERCER PISO
C-01

64

C-02

C-02

0.30

CUARTO
C-01

64

C-02

C-02

04.03.00

VIGAS

04.03.01

CONCRETO EN VIGAS FC=210 KG/CM2

0.30
0.60

M3

43.18

PRIMER PISO
VP-1

34.02

0.30

0.50

5.10

V-AP

17.54

0.30

0.40

4.21

V-AP1

7.52

0.15

0.40

0.45

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM

DESCRIPCIN

UND CANT LARGO ANCHO

ALTO

SUB-TOTAL

VCH-1

13.57

0.30

0.20

0.81

V-A

1.40

0.30

0.20

0.08

V-b

4.50

0.15

0.20

0.14

VP-1

34.02

0.30

0.50

5.10

V-AP

17.54

0.30

0.40

4.21

V-AP1

7.52

0.15

0.40

0.45

VCH-1

13.57

0.30

0.20

0.81

V-A

1.40

0.30

0.20

0.08

V-b

4.50

0.15

0.20

0.14

VP-1

34.02

0.30

0.50

5.10

V-AP

17.54

0.30

0.40

4.21

V-AP1

7.52

0.15

0.40

0.45

VCH-1

13.57

0.30

0.20

0.81

V-A

1.40

0.30

0.20

0.08

V-b

4.50

0.15

0.20

0.14

VP-1

34.02

0.30

0.50

5.10

V-AP

17.54

0.30

0.40

4.21

V-AP1

7.52

0.15

0.40

0.45

VCH-1

13.57

0.30

0.20

0.81

V-A

1.40

0.30

0.20

0.08

V-b

4.50

0.15

0.20

0.14

METRADO

SEGUNDO PISO

TERCER PISO

CUARTO PISO

04.03.02

ENCOFRADO Y DESENCOFRADO CARAVISTAS EN VIGAS

M2

242.16

PRIMER PISO
VP-1

30.12 Perimetro

0.90

27.11

V-AP

35.07 Perimetro

0.70

24.55

V-AP1

6.92 Perimetro

0.55

3.81

VCH-1

13.57 Perimetro

0.30

4.07

V-A

1.10 Perimetro

0.30

0.33

V-b

4.50 Perimetro

0.15

0.68

VP-1

30.12 Perimetro

0.90

27.11

V-AP

35.07 Perimetro

0.70

24.55

V-AP1

6.92 Perimetro

0.55

3.81

VCH-1

13.57 Perimetro

0.30

4.07

V-A

1.10 Perimetro

0.30

0.33

V-b

4.50 Perimetro

0.15

0.68

VP-1

30.12 Perimetro

0.90

27.11

V-AP

35.07 Perimetro

0.70

24.55

V-AP1

6.92 Perimetro

0.55

3.81

VCH-1

13.57 Perimetro

0.30

4.07

SEGUNDO PISO

TERCER PISO

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM

DESCRIPCIN

UND CANT LARGO ANCHO

ALTO

SUB-TOTAL

V-A

1.10 Perimetro

0.30

0.33

V-b

4.50 Perimetro

0.15

0.68

VP-1

30.12 Perimetro

0.90

27.11

V-AP

35.07 Perimetro

0.70

24.55

V-AP1

6.92 Perimetro

0.55

3.81

VCH-1

13.57 Perimetro

0.30

4.07

V-A

1.10 Perimetro

0.30

0.33

V-b

4.50 Perimetro

0.15

0.68

METRADO

CUARTO PISO

04.03.03

ACERO DE REFUERZO FY = 4200 KG/CM2

KG

5029.50

04.03.04

CURADO

M2

242.16

PRIMER PISO
VP-1

30.12 Perimetro

0.90

27.11

V-AP

35.07 Perimetro

0.70

24.55

V-AP1

6.92 Perimetro

0.55

3.81

VCH-1

13.57 Perimetro

0.30

4.07

V-A

1.10 Perimetro

0.30

0.33

V-b

4.50 Perimetro

0.15

0.68

VP-1

30.12 Perimetro

0.90

27.11

V-AP

35.07 Perimetro

0.70

24.55

V-AP1

6.92 Perimetro

0.55

3.81

VCH-1

13.57 Perimetro

0.30

4.07

V-A

1.10 Perimetro

0.30

0.33

V-b

4.50 Perimetro

0.15

0.68

VP-1

30.12 Perimetro

0.90

27.11

V-AP

35.07 Perimetro

0.70

24.55

V-AP1

6.92 Perimetro

0.55

3.81

VCH-1

13.57 Perimetro

0.30

4.07

V-A

1.10 Perimetro

0.30

0.33

V-b

4.50 Perimetro

0.15

0.68

VP-1

30.12 Perimetro

0.90

27.11

V-AP

35.07 Perimetro

0.70

24.55

V-AP1

6.92 Perimetro

0.55

3.81

VCH-1

13.57 Perimetro

0.30

4.07

V-A

1.10 Perimetro

0.30

0.33

V-b

4.50 Perimetro

0.15

0.68

SEGUNDO PISO

TERCER PISO

CUARTO PISO

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM

DESCRIPCIN

04.04.00

LOSA ALIGERADA

04.04.01

CONCRETO EN LOSAS ALIGERADAS FC= 200 KG/CM2

UND CANT LARGO ANCHO

ALTO

SUB-TOTAL

M3

41.50

PRIMER PISO
losa 1
losa 2
losa 3
losa 4
losa 5
losa 6
losa 7
losa 8
losa 9
losa 10
losa 11
losa 12
losa 13
losa 14

Area =

14.46

0.05

0.72

Area =

4.07

0.15

0.61

Area =

4.01

0.05

0.20

Area =

0.86

0.15

0.13

Area =

1.66

0.05

0.08

Area =

0.35

0.15

0.05

Area =

0.67

0.05

0.03

Area =

0.44

0.15

0.07

Area =

5.00

0.05

0.25

Area =

1.16

0.15

0.17

Area =

3.01

0.05

0.15

Area =

0.73

0.15

0.11

Area =

4.82

0.05

0.24

Area =

33.68

0.15

5.05

Area =

4.09

0.05

0.20

Area =

1.16

0.15

0.17

Area =

2.96

0.05

0.15

Area =

0.54

0.15

0.08

Area =

2.70

0.05

0.14

Area =

0.54

0.15

0.08

Area =

4.64

0.05

0.23

Area =

1.08

0.15

0.16

Area =

3.38

0.05

0.17

Area =

0.81

0.15

0.12

Area =

5.93

0.05

0.30

Area =

3.10

0.15

0.47

Area =

1.24

0.05

0.06

Area =

1.55

0.15

0.23

Area =

14.46

0.05

0.72

Area =

4.07

0.15

0.61

Area =

4.01

0.05

0.20

Area =

0.86

0.05

0.04

Area =

1.66

0.05

0.08

Area =

0.35

0.15

0.05

Area =

0.67

0.05

0.03

Area =

0.44

0.15

0.07

Area =

5.00

0.05

0.25

Area =

1.16

0.15

0.17

Area =

3.01

0.05

0.15

Area =

0.73

0.15

0.11

Area =

4.82

0.05

0.24

Area =

33.68

0.15

5.05

Area =

4.09

0.05

0.20

Area =

1.16

0.15

0.17

Area =

2.96

0.05

0.15

SEGUNDO PISO
losa 1
losa 2
losa 3
losa 4
losa 5
losa 6
losa 7
losa 8
losa 9

METRADO

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM

DESCRIPCIN
losa 10
losa 11
losa 12
losa 13
losa 14

UND CANT LARGO ANCHO

ALTO

SUB-TOTAL

Area =

0.54

0.15

0.08

Area =

2.70

0.05

0.14

Area =

0.54

0.15

0.08

Area =

4.64

0.05

0.23

Area =

1.08

0.15

0.16

Area =

3.38

0.05

0.17

Area =

0.81

0.15

0.12

Area =

5.93

0.05

0.30

Area =

3.10

0.15

0.47

Area =

1.24

0.05

0.06

Area =

1.55

0.15

0.23

Area =

14.46

0.05

0.72

Area =

4.07

0.15

0.61

Area =

4.01

0.05

0.20

Area =

0.86

0.05

0.04

Area =

1.66

0.05

0.08

Area =

0.35

0.15

0.05

Area =

0.67

0.05

0.03

Area =

0.44

0.15

0.07

Area =

5.00

0.05

0.25

Area =

1.16

0.15

0.17

Area =

3.01

0.05

0.15

Area =

0.73

0.15

0.11

Area =

4.82

0.05

0.24

Area =

33.68

0.15

5.05

Area =

4.09

0.05

0.20

Area =

1.16

0.15

0.17

Area =

2.96

0.05

0.15

Area =

0.54

0.15

0.08

Area =

2.70

0.05

0.14

Area =

0.54

0.15

0.08

Area =

4.64

0.05

0.23

Area =

1.08

0.15

0.16

Area =

3.38

0.05

0.17

Area =

0.81

0.15

0.12

Area =

5.93

0.05

0.30

Area =

3.10

0.15

0.47

Area =

1.24

0.05

0.06

Area =

1.55

0.15

0.23

Area =

14.46

0.05

0.72

Area =

4.07

0.15

0.61

Area =

4.01

0.05

0.20

Area =

0.86

0.05

0.04

Area =

1.66

0.05

0.08

Area =

0.35

0.15

0.05

Area =

0.67

0.05

0.03

TERCER PISO
losa 1
losa 2
losa 3
losa 4
losa 5
losa 6
losa 7
losa 8
losa 9
losa 10
losa 11
losa 12
losa 13
losa 14

CUARTO PISO
losa 1
losa 2
losa 3
losa 4

METRADO

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM

DESCRIPCIN

UND CANT LARGO ANCHO

losa 5
losa 6
losa 7
losa 8
losa 9
losa 10
losa 11
losa 12
losa 13
losa 14

04.04.02

ALTO

SUB-TOTAL

Area =

0.44

0.15

0.07

Area =

5.00

0.05

0.25

Area =

1.16

0.15

0.17

Area =

3.01

0.05

0.15

Area =

0.73

0.15

0.11

Area =

4.82

0.05

0.24

Area =

33.68

0.15

5.05

Area =

4.09

0.05

0.20

Area =

1.16

0.15

0.17

Area =

2.96

0.05

0.15

Area =

0.54

0.15

0.08

Area =

2.70

0.05

0.14

Area =

0.54

0.15

0.08

Area =

4.64

0.05

0.23

Area =

1.08

0.15

0.16

Area =

3.38

0.05

0.17

Area =

0.81

0.15

0.12

Area =

5.93

0.05

0.30

Area =

3.10

0.15

0.47

Area =

1.24

0.05

0.06

Area =

1.55

0.15

0.23

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA


M2

METRADO

308.13

PRIMER PISO
losa 1

Area =

14.46

28.92

losa 2

Area =

4.01

8.02

losa 3

Area =

1.66

1.66

losa 4

Area =

0.67

0.67

losa 5

Area =

5.00

5.00

losa 6

Area =

3.01

3.01

losa 7

Area =

4.82

4.82

losa 8

Area =

4.09

4.09

losa 9

Area =

2.96

2.96

losa 10

Area =

2.70

2.70

losa 11

Area =

4.64

4.64

losa 12

Area =

3.38

3.38

losa 13

Area =

5.93

5.93

losa 14

Area =

1.24

1.24

losa 1

Area =

14.46

28.92

losa 2

Area =

4.01

8.02

losa 3

Area =

1.66

1.66

losa 4

Area =

0.67

0.67

losa 5

Area =

5.00

5.00

losa 6

Area =

3.01

3.01

losa 7

Area =

4.82

4.82

losa 8

Area =

4.09

4.09

losa 9

Area =

2.96

2.96

losa 10

Area =

2.70

2.70

SEGUNDO PISO

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM

DESCRIPCIN

UND CANT LARGO ANCHO

ALTO

SUB-TOTAL

losa 11

Area =

4.64

4.64

losa 12

Area =

3.38

3.38

losa 13

Area =

5.93

5.93

losa 14

Area =

1.24

1.24

losa 1

Area =

14.46

28.92

losa 2

Area =

4.01

8.02

losa 3

Area =

1.66

1.66

losa 4

Area =

0.67

0.67

losa 5

Area =

5.00

5.00

losa 6

Area =

3.01

3.01

losa 7

Area =

4.82

4.82

losa 8

Area =

4.09

4.09

losa 9

Area =

2.96

2.96

losa 10

Area =

2.70

2.70

losa 11

Area =

4.64

4.64

losa 12

Area =

3.38

3.38

losa 13

Area =

5.93

5.93

losa 14

Area =

1.24

1.24

losa 1

Area =

14.46

28.92

losa 2

Area =

4.01

8.02

losa 3

Area =

1.66

1.66

losa 4

Area =

0.67

0.67

losa 5

Area =

5.00

5.00

losa 6

Area =

3.01

3.01

losa 7

Area =

4.82

4.82

losa 8

Area =

4.09

4.09

losa 9

Area =

2.96

2.96

losa 10

Area =

2.70

2.70

losa 11

Area =

4.64

4.64

losa 12

Area =

3.38

3.38

losa 13

Area =

5.93

5.93

losa 14

Area =

1.24

1.24

METRADO

TERCER PISO

CUARTO PISO

04.04.03

ACERO DE REFUERZO FY=4200 KG/CM2

KG

1852.02

04.04.04

LADRILLO HUECO DE ARCILLA 15X30X30CM PARA TECHO UND


ALIGERADO

2688.00

PRIMER PISO
losa 1

72

72.00

losa 2

240

240.00

losa 3

18.00

18.00

losa 4

6.00

6.00

losa 5

42.00

42.00

losa 6

28.00

28.00

losa 7

45.00

45.00

losa 8

42.00

42.00

losa 9

27.00

27.00

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM

DESCRIPCIN

UND CANT LARGO ANCHO

ALTO

SUB-TOTAL

losa 10

27.00

27.00

losa 11

45.00

45.00

losa 12

27.00

27.00

losa 13

48.00

48.00

losa 14

5.00

5.00

SEGUNDO PISO
losa 1

72

72.00

losa 2

240

240.00

losa 3

18.00

18.00

losa 4

6.00

6.00

losa 5

42.00

42.00

losa 6

28.00

28.00

losa 7

45.00

45.00

losa 8

42.00

42.00

losa 9

27.00

27.00

losa 10

27.00

27.00

losa 11

45.00

45.00

losa 12

27.00

27.00

losa 13

48.00

48.00

losa 14

5.00

5.00

TERCER PISO
losa 1

72

72.00

losa 2

240

240.00

losa 3

18.00

18.00

losa 4

6.00

6.00

losa 5

42.00

42.00

losa 6

28.00

28.00

losa 7

45.00

45.00

losa 8

42.00

42.00

losa 9

27.00

27.00

losa 10

27.00

27.00

losa 11

45.00

45.00

losa 12

27.00

27.00

losa 13

48.00

48.00

losa 14

5.00

5.00

CUARTO PISO
losa 1

72

72.00

losa 2

240

240.00

losa 3

18.00

18.00

losa 4

6.00

6.00

losa 5

42.00

42.00

losa 6

28.00

28.00

losa 7

45.00

45.00

losa 8

42.00

42.00

losa 9

27.00

27.00

losa 10

27.00

27.00

losa 11

45.00

45.00

METRADO

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM

04.04.05

DESCRIPCIN

UND CANT LARGO ANCHO

ALTO

SUB-TOTAL

losa 12

27.00

27.00

losa 13

48.00

48.00

losa 14

5.00

5.00

CURADO

M2

METRADO

308.13

PRIMER PISO
losa 1

Area =

14.46

28.92

losa 2

Area =

4.01

8.02

losa 3

Area =

1.66

1.66

losa 4

Area =

0.67

0.67

losa 5

Area =

5.00

5.00

losa 6

Area =

3.01

3.01

losa 7

Area =

4.82

4.82

losa 8

Area =

4.09

4.09

losa 9

Area =

2.96

2.96

losa 10

Area =

2.70

2.70

losa 11

Area =

4.64

4.64

losa 12

Area =

3.38

3.38

losa 13

Area =

5.93

5.93

losa 14

Area =

1.24

1.24

losa 1

Area =

14.46

28.92

losa 2

Area =

4.01

8.02

losa 3

Area =

1.66

1.66

losa 4

Area =

0.67

0.67

losa 5

Area =

5.00

5.00

losa 6

Area =

3.01

3.01

losa 7

Area =

4.82

4.82

losa 8

Area =

4.09

4.09

losa 9

Area =

2.96

2.96

losa 10

Area =

2.70

2.70

losa 11

Area =

4.64

4.64

losa 12

Area =

3.38

3.38

losa 13

Area =

5.93

5.93

losa 14

Area =

1.24

1.24

losa 1

Area =

14.46

28.92

losa 2

Area =

4.01

8.02

losa 3

Area =

1.66

1.66

losa 4

Area =

0.67

0.67

losa 5

Area =

5.00

5.00

losa 6

Area =

3.01

3.01

losa 7

Area =

4.82

4.82

losa 8

Area =

4.09

4.09

losa 9

Area =

2.96

2.96

losa 10

Area =

2.70

2.70

losa 11

Area =

4.64

4.64

losa 12

Area =

3.38

3.38

SEGUNDO PISO

TERCER PISO

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM

DESCRIPCIN

UND CANT LARGO ANCHO

ALTO

SUB-TOTAL

losa 13

Area =

5.93

5.93

losa 14

Area =

1.24

1.24

losa 1

Area =

14.46

28.92

losa 2

Area =

4.01

8.02

losa 3

Area =

1.66

1.66

losa 4

Area =

0.67

0.67

losa 5

Area =

5.00

5.00

losa 6

Area =

3.01

3.01

losa 7

Area =

4.82

4.82

losa 8

Area =

4.09

4.09

losa 9

Area =

2.96

2.96

losa 10

Area =

2.70

2.70

losa 11

Area =

4.64

4.64

losa 12

Area =

3.38

3.38

losa 13

Area =

5.93

5.93

losa 14

Area =

1.24

1.24

METRADO

CUARTO PISO

05.00.00

MUROS DE ALBAILERIA

05.01.00

MUROS DE LADRILLO KK DE ARCILLA DE SOGA

M2

687.57

PRIMER PISO
eje 3-3 entre eje A-C

7.28

3.25

Eje C-C

2.27

2.90

6.58

eje 3-3 entre eje C-D

3.25

2.90

18.85

entre eje C-D

8.17

2.90

23.69

eje D-D

1.30

2.90

3.77

eje 3-3 entre eje D-E

4.30

2.90

24.94

entre eje D-E

2.90

16.82

eje 3-3 entre eje D-E (ventana)

eje E-E

eje E-E (ventana)

eje 3-3 entre E-F

2.7

2.90

15.66

entre E-F

4.15

2.90

12.04

eje F'-F'

2.77

2.40

6.65

eje 2-2 entre A-C

6.99

3.25

22.72

eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre B-C

1.25

2.60

3.25

Eje C-C

2.87

2.25

6.46

eje 3-3 entre eje C-D

3.25

2.60

16.90

entre eje C-D

2.60

14.17

entre eje C-D(ventana)

area

2.60

-2.86

eje D-D

3.02

eje 3-3 entre eje D-E

eje 1-1 entre eje D-E


entre eje D-E
eje 3-3 entre eje D-E (ventana)

5.80
area

-0.72

3.27
area

47.32

-0.72
2.90

-2.408

9.48
-2.41

SEGUNDO PISO

5.45
-0.55

2.60

7.85

2.60

10.40

4.3

2.60

11.18

9.52

2.60

24.75

area

-5.88

-5.88

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL

PROPIETARIO
FECHA

:
:

CORPORACION JABE S.A.C.


ENERO DEL 2014

ITEM

DESCRIPCIN

UND CANT LARGO ANCHO

eje E-E

eje E-E (ventana)

eje 3-3 entre E-F

entre E-F
eje F'-F'

3.27

ALTO

SUB-TOTAL

2.60

8.50

2.7

2.60

14.04

4.15

2.60

10.79

2.77

2.40

6.65

eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre B-C

1.25

2.60

3.25

Eje C-C

2.87

2.25

6.46

eje 3-3 entre eje C-D

3.25

2.60

16.90

entre eje C-D

2.60

14.17

entre eje C-D(ventana)

area

2.60

-2.86

eje D-D

3.02

eje 3-3 entre eje D-E

eje 1-1 entre eje D-E


entre eje D-E
eje 3-3 entre eje D-E (ventana)

eje E-E

eje E-E (ventana)

eje 3-3 entre E-F

2.7

2.60

14.04

entre E-F

4.15

2.60

10.79

eje F'-F'

2.77

2.40

6.65

eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre B-C

1.25

2.60

3.25

Eje C-C

2.87

2.25

6.46

eje 3-3 entre eje C-D

3.25

2.60

16.90

entre eje C-D

2.60

14.17

entre eje C-D(ventana)

area

2.60

-2.86

eje D-D

3.02

eje 3-3 entre eje D-E

eje 1-1 entre eje D-E


entre eje D-E
eje 3-3 entre eje D-E (ventana)

eje E-E

eje E-E (ventana)

eje 3-3 entre E-F

2.7

2.60

14.04

entre E-F

4.15

2.60

10.79

eje F'-F'

2.77

2.40

6.65

area

-2.94

-2.94

TERCER PISO

5.45
-0.55

2.60

7.85

2.60

10.40

4.3

2.60

11.18

9.52

2.60

24.75

area

-5.88

3.27
area

-5.88
2.60

-2.94

8.50
-2.94

CUARTO PISO

5.45
-0.55

2.60

7.85

2.60

10.40

4.3

2.60

11.18

9.52

2.60

24.75

area

-5.88

3.27
area

-5.88
2.60

-2.94

8.50
-2.94

METRADO

HOJA DE METRADOS
OBRA

CONSTRUCCION HOTEL DEUSTUA N346

PROPIETARIO
FECHA

:
:

MUNICIPALIDAD DE TACNA
MARZO 2012

ITEM

DESCRIPCIN

UND CANT LARGO ANCHO

06.00.00

REVOQUES ENLUCIDOS Y MOLDURAS

06.01.00

TARRAJEO EN INTERIORES ACABADO CON CEMENTO -ARENA


M2

ALTO

SUB-TOTAL

METRADO
1233.58

PRIMER PISO
MUROS
eje 3-3 entre eje A-C

7.28

3.35

48.78

Eje C-C

4.24

3.00

12.72

eje 3-3 entre eje C-D

3.25

3.00

19.50

entre eje C-D

19.99

3.00

59.97

eje D-D

2.30

3.00

6.90

eje 3-3 entre eje D-E

4.30

3.00

25.80

entre eje D-E

9.35

3.00

28.05

eje 3-3 entre eje D-E (ventana)

eje E-E

eje E-E (ventana)

eje 3-3 entre E-F

entre E-F
eje F'-F'
eje 2-2 entre A-C

area

2.88
3.1

5.76
3.00

9.30

2.7

3.00

16.20

8.3

3.00

24.90

2.77

2.50

6.93

14.88

3.35

49.85

area

1.72

3.44

COLUMNA
C-01 Eje A-C

4.50

3.05

13.73

C-01 Eje D-F

3.60

3.05

10.98

C-02

1.34

3.05

4.09

V-AP eje A-C

2.55

5.10

VP-1 eje A-A

3.04

3.04

VP-1 eje B-B

4.56

4.56

VP-1 eje C-C

3.80

3.80

VP-1 eje D-D

3.80

3.80

VP-1 eje E-E

3.80

3.80

VP-1 eje F-F

2.86

2.86

V-AP1 eje F'-F'

1.28

1.28

V-A eje F'-F'

0.39

0.39

V-AP eje 3-3- entre C-D

1.14

2.28

V-AP eje 3-3- entre D-E

1.51

3.01

V-AP eje 3-3- entre E-F

0.95

0.95

VIGAS

SEGUNDO PISO
MUROS
eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre B-C

2.5

2.60

6.50

Eje C-C

3.02

2.25

6.80

eje 3-3 entre eje C-D

3.25

2.60

16.90

entre eje C-D

9.15

2.60

23.79

entre eje C-D(ventana)

area

2.31

eje D-D

6.04

eje 3-3 entre eje D-E

eje 1-1 entre eje D-E

4.3

entre eje D-E

eje 3-3 entre eje D-E (ventana)

eje E-E

eje E-E (ventana)

eje 3-3 entre E-F

2.7

2.60

14.04

entre E-F

8.3

2.60

21.58

eje F'-F'

2.77

2.40

6.65

12.9
area

2.60

12.01

2.60

15.70

2.60

10.40

2.60

11.18

2.60

33.54

5.82

1.55
area

5.82
2.60

2.1

4.03
2.10

COLUMNA
C-01 Eje A-C

3.00

2.30

6.90

C-01 Eje D-F

5.55

2.60

14.43

V-AP eje A-C

2.55

5.10

VP-1 eje A-A

2.28

2.28

VP-1 eje B-B

4.56

4.56

VP-1 eje C-C

3.80

3.80

VP-1 eje D-D

3.80

3.80

VP-1 eje E-E

3.80

3.80

VP-1 eje F-F

2.86

2.86

V-AP1 eje F'-F'

1.28

1.28

V-A eje F'-F'

0.39

0.39

V-AP eje 3-3- entre C-D

1.14

2.28

V-AP eje 3-3- entre D-E

1.51

3.01

V-AP eje 3-3- entre E-F

0.95

0.95

VIGAS

TERCER PISO
MUROS
eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre B-C

2.5

2.60

6.50

Eje C-C

3.02

2.25

6.80

eje 3-3 entre eje C-D

3.25

2.60

16.90

entre eje C-D

9.15

2.60

23.79

entre eje C-D(ventana)

area

2.60

12.01

eje D-D

6.04

2.60

15.70

eje 3-3 entre eje D-E

2.60

10.40

eje 1-1 entre eje D-E

4.3

2.60

11.18

entre eje D-E

12.9

2.60

33.54

eje 3-3 entre eje D-E (ventana)

eje E-E

eje E-E (ventana)

eje 3-3 entre E-F

entre E-F
eje F'-F'

2.31

area

5.82

1.55

5.82
2.60

4.03

2.7

2.60

14.04

8.3

2.60

21.58

2.77

2.40

6.65

2.30

6.90

area

2.1

2.10

COLUMNA
C-01 Eje A-C

3.00

C-01 Eje D-F

5.55

2.60

14.43

V-AP eje A-C

2.55

5.10

VP-1 eje A-A

2.28

2.28

VP-1 eje B-B

4.56

4.56

VP-1 eje C-C

3.80

3.80

VP-1 eje D-D

3.80

3.80

VP-1 eje E-E

3.80

3.80

VP-1 eje F-F

2.86

2.86

V-AP1 eje F'-F'

1.28

1.28

V-A eje F'-F'

0.39

0.39

V-AP eje 3-3- entre C-D

1.14

2.28

V-AP eje 3-3- entre D-E

1.51

3.01

V-AP eje 3-3- entre E-F

0.95

0.95

VIGAS

CUARTO PISO
MUROS
eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre B-C

2.5

2.60

6.50

Eje C-C

3.02

2.25

6.80

eje 3-3 entre eje C-D

3.25

2.60

16.90

entre eje C-D

2.60

23.79

entre eje C-D(ventana)

area

2.60

12.01

eje D-D

6.04

2.60

15.70

eje 3-3 entre eje D-E

2.60

10.40

eje 1-1 entre eje D-E

4.3

2.60

11.18

entre eje D-E

12.9

2.60

33.54

eje 3-3 entre eje D-E (ventana)

eje E-E

eje E-E (ventana)

eje 3-3 entre E-F

entre E-F
eje F'-F'

9.15
2.31

area

5.82

1.55

5.82
2.60

4.03

2.7

2.60

14.04

8.3

2.60

21.58

2.77

2.40

6.65

area

2.1

2.10

COLUMNA
C-01 Eje A-C

3.00

2.30

6.90

C-01 Eje D-F

5.55

2.60

14.43

V-AP eje A-C

2.55

5.10

VP-1 eje A-A

2.28

2.28

VP-1 eje B-B

4.56

4.56

VP-1 eje C-C

3.80

3.80

VP-1 eje D-D

3.80

3.80

VP-1 eje E-E

3.80

3.80

VP-1 eje F-F

2.86

2.86

V-AP1 eje F'-F'

1.28

1.28

V-A eje F'-F'

0.39

0.39

V-AP eje 3-3- entre C-D

1.14

2.28

V-AP eje 3-3- entre D-E

1.51

3.01

VIGAS

V-AP eje 3-3- entre E-F


06.02.00

0.95

0.95

TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA


M2

447.87

PRIMER PISO
eje 3-3 entre eje A-C

7.28

3.35

48.78

eje 3-3 entre eje C-D

3.25

3.00

19.50

eje 3-3 entre eje D-E

4.30

3.00

25.80

eje 3-3 entre E-F

2.7

3.00

16.20

eje F'-F'

2.77

2.50

6.93

COLUMNA
C-01 Eje A-C

2.40

3.05

7.32

C-01 Eje D-F

1.80

3.05

5.49

SEGUNDO PISO
eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre eje C-D

3.25

2.60

16.90

eje 3-3 entre eje D-E

4.3

2.60

22.36

eje 3-3 entre E-F

2.7

2.60

14.04

eje F'-F'

2.77

2.40

6.65

COLUMNA
C-01 Eje A-C

2.40

3.05

7.32

C-01 Eje D-F

1.80

3.05

5.49

TERCER PISO
eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre eje C-D

3.25

2.60

16.90

eje 3-3 entre eje D-E

4.3

2.60

22.36

eje 3-3 entre E-F

2.7

2.60

14.04

eje F'-F'

2.77

2.40

6.65

COLUMNA
C-01 Eje A-C

2.40

3.05

7.32

C-01 Eje D-F

1.80

3.05

5.49

CUARTO PISO
eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre eje C-D

3.25

2.60

16.90

eje 3-3 entre eje D-E

4.3

2.60

22.36

eje 3-3 entre E-F

2.7

2.60

14.04

eje F'-F'

2.77

2.40

6.65

COLUMNA

06.03.00

C-01 Eje A-C

2.40

3.05

7.32

C-01 Eje D-F

1.80

3.05

5.49

CIELO RASOS ACABADO CON CEMENTO-ARENA


PRIMER PISO

M2

361.30
Area =

93.0165

3.9825
8.6638
1.57
1.8
0.93
1.3
6.9525
2.52
12.2897
22.7175
29.723
0.5675
SEGUNDO PISO

Area =

89.4276
40.9349
3.035
2.375
10.432
2.52
17.4832
12.29
0.3575

TERCER PISO

Area =

89.4276
40.9349
3.035
2.375
10.432
2.52
17.4832
12.29
0.3575

CUARTO PISO

Area =

89.4276
40.9349
3.035
2.375
10.432
2.52
17.4832
12.29
0.3575

06.04.00

VESTIDURA DE DERRAMES E=0.15cm

283.78

PRIMER PISO
Ventanas
V-1 entre D-E

1.20

0.60

2.40

V-2 entre E-E

1.72

1.40

4.52

Puertas
P-1 entre eje A-B

3.50

3.05

9.60

P-2 entre eje A-B

1.25

3.05

7.35

P-3 eje 2-2

0.90

3.05

7.00

P-4 eje C-C

0.75

3.00

6.75

P-5 entre C-D

0.75

3.00

14.25

P-6 eje D-D

0.75

3.00

6.75

P-7 entre D-E

0.90

3.00

6.90

P-8 eje E-E

0.70

3.00

6.70

P-9 eje F'-F'

0.90

3.00

6.90

SEGUNDO PISO
Ventanas
V-1 eje A-A

5.07

1.70

8.47

V-2 entre C-D

0.55

1.40

7.25

V-3 entre D-E

1.20

0.50

2.20

V-4 entre D-E

2.10

1.60

5.30

V-5 entre D-E

1.20

1.60

4.40

V-6 eje E-E

2.10

1.40

4.90

Puertas
P-1 entre eje B-C

0.75

2.60

5.95

P-2 eje C-C

1.20

2.25

5.70

P-3 entre D-E

0.75

2.60

5.95

P-4 entre D-E

0.90

2.60

6.10

P-5 eje E-E

0.70

2.60

5.90

P-9 eje F'-F'

0.90

2.60

6.10

TERCER PISO
Ventanas
V-1 eje A-A

5.07

1.70

8.47

V-2 entre C-D

0.55

1.40

7.25

V-3 entre D-E

1.20

0.50

2.20

V-4 entre D-E

2.10

1.60

5.30

V-5 entre D-E

1.20

1.60

4.40

V-6 eje E-E

2.10

1.40

4.90

Puertas
P-1 entre eje B-C

0.75

2.60

5.95

P-2 eje C-C

1.20

2.25

5.70

P-3 entre D-E

0.75

2.60

5.95

P-4 entre D-E

0.90

2.60

6.10

P-5 eje E-E

0.70

2.60

5.90

P-9 eje F'-F'

0.90

2.60

6.10

CUARTO PISO
Ventanas
V-1 eje A-A

5.07

1.70

8.47

V-2 entre C-D

0.55

1.40

7.25

V-3 entre D-E

1.20

0.50

2.20

V-4 entre D-E

2.10

1.60

5.30

V-5 entre D-E

1.20

1.60

4.40

V-6 eje E-E

2.10

1.40

4.90

Puertas

P-1 entre eje B-C

0.75

2.60

5.95

P-2 eje C-C

1.20

2.25

5.70

P-3 entre D-E

0.75

2.60

5.95

P-4 entre D-E

0.90

2.60

6.10

P-5 eje E-E

0.70

2.60

5.90

P-9 eje F'-F'

0.90

2.60

6.10

07.00.00

PISOS Y PAVIMENTOS

07.01.00

PISO CEMENTO PULIDO


PRIMER PISO

M2

361.30
Area =

93.0165
3.9825
8.6638
1.57
1.8
0.93
1.3
6.9525
2.52
12.2897
22.7175
29.723
0.5675

SEGUNDO PISO

Area =

89.4276
40.9349
3.035
2.375
10.432
2.52
17.4832
12.29
0.3575

TERCER PISO

Area =

89.4276
40.9349
3.035
2.375
10.432
2.52
17.4832
12.29
0.3575

CUARTO PISO

Area =

89.4276
40.9349
3.035
2.375
10.432
2.52
17.4832
12.29
0.3575

08.00.00

ZOCALOS Y CONTRAZOCALOS

08.01.00

CONTRAZOCALO DE CEMENTO PULIDO PARA EXTERIORESM

08.02.00

276.98

Primer Piso

Perim.

67.61

67.61

Segundo Piso

Perim.

69.79

69.79

Tercer Piso

Perim.

69.79

69.79

Cuarto Piso

Perim.

69.79

69.79

ZOCALOS

M2

34.25

PRIMER PISO
bao

area

1.57

1.57

bao

area

1.80

1.80

bao

area

2.52

2.52

cocina

area

4.30

4.30

bao

area

3.08

3.08

bao

area

2.42

2.42

bao

area

2.52

2.52

bao

area

3.08

3.08

bao

area

2.42

2.42

bao

area

2.52

2.52

bao

area

3.08

3.08

bao

area

2.42

2.42

bao

area

2.52

2.52

SEGUNDO PISO

TERCER PISO

CUARTO PISO

09.00.00

CARPINTERIA DE MADERA

09.01.00

PUERTA DE MADERA DE DOS HOJAS TABLERO REBAJADOM2


DE 4.5 MM

60.36

PRIMER PISO
P-1 entre eje A-B

3.50

3.05

10.68

P-2 entre eje A-B

1.25

2.50

3.13

P-3 eje 2-2

0.90

2.50

2.25

P-4 eje C-C

0.75

2.10

1.58

P-5 entre C-D

0.75

2.10

3.15

P-6 eje D-D

0.75

2.10

1.58

P-7 entre D-E

0.90

2.10

1.89

P-8 eje E-E

0.70

2.10

1.47

P-9 eje F'-F'

0.90

2.10

1.89

P-1 entre eje B-C

0.75

2.10

1.58

P-2 eje C-C

1.20

2.10

2.52

P-3 entre D-E

0.75

2.10

1.58

P-4 entre D-E

0.90

2.10

1.89

P-5 eje E-E

0.70

2.10

1.47

P-9 eje F'-F'

0.90

2.10

1.89

SEGUNDO PISO

TERCER PISO
P-1 entre eje B-C

0.75

2.10

1.58

P-2 eje C-C

1.20

2.10

2.52

P-3 entre D-E

0.75

2.10

1.58

P-4 entre D-E

0.90

2.10

1.89

P-5 eje E-E

0.70

2.10

1.47

P-9 eje F'-F'

0.90

2.10

1.89

P-1 entre eje B-C

0.75

2.10

1.58

P-2 eje C-C

1.20

2.10

2.52

P-3 entre D-E

0.75

2.10

1.58

P-4 entre D-E

0.90

2.10

1.89

P-5 eje E-E

0.70

2.10

1.47

P-9 eje F'-F'

0.90

2.10

1.89

CUARTO PISO

09.02.00

VENTANA

117.15

PRIMER PISO
V-1 entre D-E

1.20

0.60

2.40

V-2 entre E-E

1.72

1.40

4.52

V-2 entre eje A-B

1.25

0.55

0.69

V-3 eje 2-2

0.90

0.55

0.50

V-4 eje C-C

0.75

0.90

0.68

V-5 entre C-D

0.75

0.90

1.35

V-6 eje D-D

0.75

0.90

0.68

V-7 entre D-E

0.90

0.90

0.81

V-8 eje E-E

0.70

0.90

0.63

V-9 eje F'-F'

0.90

0.90

0.81

SEGUNDO PISO
V-1 eje A-A

5.07

1.70

8.47

V-2 entre C-D

0.55

1.40

7.25

V-3 entre D-E

1.20

0.50

2.20

V-4 entre D-E

2.10

1.60

5.30

V-5 entre D-E

1.20

1.60

4.40

V-6 eje E-E

2.10

1.40

4.90

V-1 entre eje B-C

0.75

0.50

0.38

V-2 eje C-C

1.20

0.15

0.18

V-3 entre D-E

0.75

0.50

0.38

V-4 entre D-E

0.90

0.50

0.45

V-5 eje E-E

0.70

0.50

0.35

V-6 eje F'-F'

0.90

0.50

0.45

TERCER PISO
V-1 eje A-A

5.07

1.70

8.47

V-2 entre C-D

0.55

1.40

7.25

V-3 entre D-E

1.20

0.50

2.20

V-4 entre D-E

2.10

1.60

5.30

V-5 entre D-E

1.20

1.60

4.40

V-6 eje E-E

2.10

1.40

4.90

V-1 entre eje B-C

0.75

0.50

0.38

V-2 eje C-C

1.20

0.15

0.18

V-3 entre D-E

0.75

0.50

0.38

V-4 entre D-E

0.90

0.50

0.45

V-5 eje E-E

0.70

0.50

0.35

V-6 eje F'-F'

0.90

0.50

0.45

CUARTO PISO
V-1 eje A-A

5.07

1.70

8.47

V-2 entre C-D

0.55

1.40

7.25

V-3 entre D-E

1.20

0.50

2.20

V-4 entre D-E

2.10

1.60

5.30

V-5 entre D-E

1.20

1.60

4.40

V-6 eje E-E

2.10

1.40

4.90

V-1 entre eje B-C

0.75

0.50

0.38

V-2 eje C-C

1.20

0.15

0.18

V-3 entre D-E

0.75

0.50

0.38

V-4 entre D-E

0.90

0.50

0.45

V-5 eje E-E

0.70

0.50

0.35

V-6 eje F'-F'

0.90

0.50

0.45

12.00.00

CERRAJERIA

12.01.00

CERRADURA PUERTA DE MADERA EMBUTIR TRES GOLPES


PZA

28.00

PRIMER PISO
P-1 entre eje A-B

1.00

P-2 entre eje A-B

1.00

P-3 eje 2-2

1.00

P-4 eje C-C

1.00

P-5 entre C-D

2.00

P-6 eje D-D

1.00

P-7 entre D-E

1.00

P-8 eje E-E

1.00

P-9 eje F'-F'

1.00

P-1 entre eje B-C

1.00

P-2 eje C-C

1.00

P-3 entre D-E

1.00

P-4 entre D-E

1.00

P-5 eje E-E

1.00

P-9 eje F'-F'

1.00

P-1 entre eje B-C

1.00

P-2 eje C-C

1.00

P-3 entre D-E

1.00

P-4 entre D-E

1.00

P-5 eje E-E

1.00

P-9 eje F'-F'

1.00

SEGUNDO PISO

TERCER PISO

CUARTO PISO

12.02.00

P-1 entre eje B-C

1.00

P-2 eje C-C

1.00

P-3 entre D-E

1.00

P-4 entre D-E

1.00

P-5 eje E-E

1.00

P-9 eje F'-F'

1.00

BISAGRA ALUMINIZADA DE 3X3"

PZA

84.00

PRIMER PISO
P-1 entre eje A-B

3.00

P-2 entre eje A-B

3.00

P-3 eje 2-2

3.00

P-4 eje C-C

3.00

P-5 entre C-D

6.00

P-6 eje D-D

3.00

P-7 entre D-E

3.00

P-8 eje E-E

3.00

P-9 eje F'-F'

3.00

P-1 entre eje B-C

3.00

P-2 eje C-C

3.00

P-3 entre D-E

3.00

P-4 entre D-E

3.00

P-5 eje E-E

3.00

P-9 eje F'-F'

3.00

P-1 entre eje B-C

3.00

P-2 eje C-C

3.00

P-3 entre D-E

3.00

P-4 entre D-E

3.00

P-5 eje E-E

3.00

P-9 eje F'-F'

3.00

P-1 entre eje B-C

3.00

P-2 eje C-C

3.00

P-3 entre D-E

3.00

P-4 entre D-E

3.00

P-5 eje E-E

3.00

P-9 eje F'-F'

3.00

SEGUNDO PISO

TERCER PISO

CUARTO PISO

13.00.00

VIDRIOS, CRISTALES Y SIMILARES

13.01.00

VENTANA TIPO DE SISTEMA INC. VIDRIO GRIS 6 MM

M2

117.15

PRIMER PISO
V-1 entre D-E

1.20

0.60

2.40

V-2 entre E-E

1.72

1.40

4.52

V-2 entre eje A-B

1.25

0.55

0.69

V-3 eje 2-2

0.90

0.55

0.50

V-4 eje C-C

0.75

0.90

0.68

V-5 entre C-D

0.75

0.90

1.35

V-6 eje D-D

0.75

0.90

0.68

V-7 entre D-E

0.90

0.90

0.81

V-8 eje E-E

0.70

0.90

0.63

V-9 eje F'-F'

0.90

0.90

0.81

SEGUNDO PISO
V-1 eje A-A

5.07

1.70

8.47

V-2 entre C-D

0.55

1.40

7.25

V-3 entre D-E

1.20

0.50

2.20

V-4 entre D-E

2.10

1.60

5.30

V-5 entre D-E

1.20

1.60

4.40

V-6 eje E-E

2.10

1.40

4.90

V-1 entre eje B-C

0.75

0.50

0.38

V-2 eje C-C

1.20

0.15

0.18

V-3 entre D-E

0.75

0.50

0.38

V-4 entre D-E

0.90

0.50

0.45

V-5 eje E-E

0.70

0.50

0.35

V-6 eje F'-F'

0.90

0.50

0.45

TERCER PISO
V-1 eje A-A

5.07

1.70

8.47

V-2 entre C-D

0.55

1.40

7.25

V-3 entre D-E

1.20

0.50

2.20

V-4 entre D-E

2.10

1.60

5.30

V-5 entre D-E

1.20

1.60

4.40

V-6 eje E-E

2.10

1.40

4.90

V-1 entre eje B-C

0.75

0.50

0.38

V-2 eje C-C

1.20

0.15

0.18

V-3 entre D-E

0.75

0.50

0.38

V-4 entre D-E

0.90

0.50

0.45

V-5 eje E-E

0.70

0.50

0.35

V-6 eje F'-F'

0.90

0.50

0.45

CUARTO PISO
V-1 eje A-A

5.07

1.70

8.47

V-2 entre C-D

0.55

1.40

7.25

V-3 entre D-E

1.20

0.50

2.20

V-4 entre D-E

2.10

1.60

5.30

V-5 entre D-E

1.20

1.60

4.40

V-6 eje E-E

2.10

1.40

4.90

V-1 entre eje B-C

0.75

0.50

0.38

V-2 eje C-C

1.20

0.15

0.18

V-3 entre D-E

0.75

0.50

0.38

V-4 entre D-E

0.90

0.50

0.45

V-5 eje E-E

0.70

0.50

0.35

V-6 eje F'-F'

0.90

0.50

0.45

14.00.00

PINTURA

14.01.00

PINTURA DE CIELO RASO C/LATEX

M2

361.30

PRIMER PISO

Area =

93.0165
3.9825
8.6638
1.57
1.8
0.93
1.3
6.9525
2.52
12.2897
22.7175
29.723
0.5675

SEGUNDO PISO

Area =

89.4276
40.9349
3.035
2.375
10.432
2.52
17.4832
12.29
0.3575

TERCER PISO

Area =

89.4276
40.9349
3.035
2.375
10.432
2.52
17.4832
12.29
0.3575

CUARTO PISO

Area =

89.4276
40.9349
3.035
2.375
10.432
2.52
17.4832
12.29
0.3575

14.02.00

PINTADO DE MURO INTERIOR C/LATEX

M2

1517.36

PRIMER PISO
MUROS
eje 3-3 entre eje A-C

7.28

3.35

48.78

Eje C-C

4.24

3.00

12.72

eje 3-3 entre eje C-D

3.25

3.00

19.50

entre eje C-D

19.99

3.00

59.97

eje D-D

2.30

3.00

6.90

eje 3-3 entre eje D-E

4.30

3.00

25.80

entre eje D-E

3.00

28.05

eje 3-3 entre eje D-E (ventana)

eje E-E

eje E-E (ventana)

eje 3-3 entre E-F

2.7

3.00

16.20

entre E-F

8.3

3.00

24.90

eje F'-F'

2.77

2.50

6.93

eje 2-2 entre A-C

14.88

3.35

49.85

9.35
area

2.88
3.1

area

5.76
3.00

1.72

9.30
3.44

COLUMNA
C-01 Eje A-C

4.50

3.05

13.73

C-01 Eje D-F

3.60

3.05

10.98

C-02

1.34

3.05

4.09

V-AP eje A-C

2.55

5.10

VP-1 eje A-A

3.04

3.04

VP-1 eje B-B

4.56

4.56

VP-1 eje C-C

3.80

3.80

VP-1 eje D-D

3.80

3.80

VP-1 eje E-E

3.80

3.80

VP-1 eje F-F

2.86

2.86

V-AP1 eje F'-F'

1.28

1.28

V-A eje F'-F'

0.39

0.39

V-AP eje 3-3- entre C-D

1.14

2.28

V-AP eje 3-3- entre D-E

1.51

3.01

V-AP eje 3-3- entre E-F

0.95

0.95

VIGAS

SEGUNDO PISO
MUROS
eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre B-C

2.5

2.60

6.50

Eje C-C

3.02

2.25

6.80

eje 3-3 entre eje C-D

3.25

2.60

16.90

entre eje C-D

9.15

2.60

23.79

entre eje C-D(ventana)

area

2.60

12.01

eje D-D

6.04

2.60

15.70

eje 3-3 entre eje D-E

2.60

10.40

eje 1-1 entre eje D-E

4.3

2.60

11.18

entre eje D-E

12.9

2.60

33.54

eje 3-3 entre eje D-E (ventana)

eje E-E

eje E-E (ventana)

eje 3-3 entre E-F

entre E-F
eje F'-F'

2.31

area

5.82

1.55

5.82
2.60

4.03

2.7

2.60

14.04

8.3

2.60

21.58

2.77

2.40

6.65

area

2.1

2.10

COLUMNA
C-01 Eje A-C

3.00

2.30

6.90

C-01 Eje D-F

5.55

2.60

14.43

V-AP eje A-C

2.55

5.10

VP-1 eje A-A

2.28

2.28

VP-1 eje B-B

4.56

4.56

VP-1 eje C-C

3.80

3.80

VP-1 eje D-D

3.80

3.80

VP-1 eje E-E

3.80

3.80

VP-1 eje F-F

2.86

2.86

V-AP1 eje F'-F'

1.28

1.28

V-A eje F'-F'

0.39

0.39

V-AP eje 3-3- entre C-D

1.14

2.28

V-AP eje 3-3- entre D-E

1.51

3.01

V-AP eje 3-3- entre E-F

0.95

0.95

VIGAS

TERCER PISO
MUROS
eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre B-C

2.5

2.60

6.50

Eje C-C

3.02

2.25

6.80

eje 3-3 entre eje C-D

3.25

2.60

16.90

entre eje C-D

9.15

2.60

23.79

entre eje C-D(ventana)

area

2.60

12.01

eje D-D

6.04

2.60

15.70

eje 3-3 entre eje D-E

2.60

10.40

eje 1-1 entre eje D-E

4.3

2.60

11.18

entre eje D-E

2.60

33.54

eje 3-3 entre eje D-E (ventana)

eje E-E

eje E-E (ventana)

eje 3-3 entre E-F

2.7

2.60

14.04

entre E-F

8.3

2.60

21.58

eje F'-F'

2.77

2.40

6.65

2.31

12.9
area

5.82

1.55
area

5.82
2.60

2.1

4.03
2.10

COLUMNA
C-01 Eje A-C

3.00

2.30

6.90

C-01 Eje D-F

5.55

2.60

14.43

V-AP eje A-C

2.55

5.10

VP-1 eje A-A

2.28

2.28

VP-1 eje B-B

4.56

4.56

VP-1 eje C-C

3.80

3.80

VP-1 eje D-D

3.80

3.80

VP-1 eje E-E

3.80

3.80

VP-1 eje F-F

2.86

2.86

V-AP1 eje F'-F'

1.28

1.28

V-A eje F'-F'

0.39

0.39

VIGAS

V-AP eje 3-3- entre C-D

1.14

2.28

V-AP eje 3-3- entre D-E

1.51

3.01

V-AP eje 3-3- entre E-F

0.95

0.95

CUARTO PISO
MUROS
eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre B-C

2.5

2.60

6.50

Eje C-C

3.02

2.25

6.80

eje 3-3 entre eje C-D

3.25

2.60

16.90

entre eje C-D

9.15

2.60

23.79

entre eje C-D(ventana)

area

2.60

12.01

eje D-D

6.04

2.60

15.70

eje 3-3 entre eje D-E

2.60

10.40

eje 1-1 entre eje D-E

4.3

2.60

11.18

entre eje D-E

12.9

2.60

33.54

eje 3-3 entre eje D-E (ventana)

eje E-E

eje E-E (ventana)

eje 3-3 entre E-F

entre E-F
eje F'-F'

2.31

area

5.82

1.55

5.82
2.60

4.03

2.7

2.60

14.04

8.3

2.60

21.58

2.77

2.40

6.65

area

2.1

2.10

COLUMNA
C-01 Eje A-C

3.00

2.30

6.90

C-01 Eje D-F

5.55

2.60

14.43

V-AP eje A-C

2.55

5.10

VP-1 eje A-A

2.28

2.28

VP-1 eje B-B

4.56

4.56

VP-1 eje C-C

3.80

3.80

VP-1 eje D-D

3.80

3.80

VP-1 eje E-E

3.80

3.80

VP-1 eje F-F

2.86

2.86

V-AP1 eje F'-F'

1.28

1.28

V-A eje F'-F'

0.39

0.39

V-AP eje 3-3- entre C-D

1.14

2.28

V-AP eje 3-3- entre D-E

1.51

3.01

V-AP eje 3-3- entre E-F

0.95

0.95

Derrames de Puertas y Ventanas

VIGAS

14.03.00

PINTADO DE MURO EXTERIOR C/LATEX

283.78

M2

460.68

PRIMER PISO
eje 3-3 entre eje A-C

7.28

3.35

48.78

eje 3-3 entre eje C-D

3.25

3.00

19.50

eje 3-3 entre eje D-E

4.30

3.00

25.80

eje 3-3 entre E-F

2.7

3.00

16.20

eje F'-F'

2.77

2.50

6.93

COLUMNA
C-01 Eje A-C

2.40

3.05

7.32

C-01 Eje D-F

1.80

3.05

5.49

SEGUNDO PISO
eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre eje C-D

3.25

2.60

16.90

eje 3-3 entre eje D-E

4.3

2.60

22.36

eje 3-3 entre E-F

2.7

2.60

14.04

eje F'-F'

2.77

2.40

6.65

COLUMNA
C-01 Eje A-C

2.40

3.05

7.32

C-01 Eje D-F

1.80

3.05

5.49

TERCER PISO
eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre eje C-D

3.25

2.60

16.90

eje 3-3 entre eje D-E

4.3

2.60

22.36

eje 3-3 entre E-F

2.7

2.60

14.04

eje F'-F'

2.77

2.40

6.65

COLUMNA
C-01 Eje A-C

2.40

3.05

7.32

C-01 Eje D-F

1.80

3.05

5.49

CUARTO PISO
eje 3-3 entre eje A-C

7.13

2.60

18.54

eje 1-1 entre eje A-C

7.28

2.60

18.93

eje 3-3 entre eje C-D

3.25

2.60

16.90

eje 3-3 entre eje D-E

4.3

2.60

22.36

eje 3-3 entre E-F

2.7

2.60

14.04

eje F'-F'

2.77

2.40

6.65

COLUMNA

14.04.00

C-01 Eje A-C

2.40

3.05

7.32

C-01 Eje D-F

1.80

3.05

5.49

PINTURA EN PUERTAS CON BARNIZ 2 MANOS

M2

323.20

PRIMER PISO
P-1 entre eje A-B

3.50

3.05

22.70

P-2 entre eje A-B

1.25

2.50

13.75

P-3 eje 2-2

0.90

2.50

12.70

P-4 eje C-C

0.75

2.10

10.65

P-5 entre C-D

0.75

2.10

22.05

P-6 eje D-D

0.75

2.10

10.65

P-7 entre D-E

0.90

2.10

11.10

P-8 eje E-E

0.70

2.10

10.50

P-9 eje F'-F'

0.90

2.10

11.10

SEGUNDO PISO
P-1 entre eje B-C

0.75

2.10

10.65

P-2 eje C-C

1.20

2.10

12.00

P-3 entre D-E

0.75

2.10

10.65

P-4 entre D-E

0.90

2.10

11.10

P-5 eje E-E

0.70

2.10

10.50

P-9 eje F'-F'

0.90

2.10

11.10

P-1 entre eje B-C

0.75

2.10

10.65

P-2 eje C-C

1.20

2.10

12.00

P-3 entre D-E

0.75

2.10

10.65

P-4 entre D-E

0.90

2.10

11.10

P-5 eje E-E

0.70

2.10

10.50

P-9 eje F'-F'

0.90

2.10

11.10

P-1 entre eje B-C

0.75

2.10

10.65

P-2 eje C-C

1.20

2.10

12.00

P-3 entre D-E

0.75

2.10

10.65

P-4 entre D-E

0.90

2.10

11.10

P-5 eje E-E

0.70

2.10

10.50

P-9 eje F'-F'

0.90

2.10

11.10

TERCER PISO

CUARTO PISO

12.00.00

APARATOS Y ACCESORIOS SANITARIOS

12.01.00
INODORO TANQUE BALO COLOR INC. ACCESORIOS COMPLETOS
PZA

12

PRIMER PISO
S.H. Damas

3.00

3.00

3.00

3.00

SEGUNDO PISO
S.H. Damas
TERCER PISO
S.H. Damas
CUARTO PISO
S.H. Damas
12.02.00

LAVATORIOS DE PEDESTAL OVALIN COLOR INC. ACCESORIOS


PZA

24.00

PRIMER PISO
S.H. Damas

3.00

S.H. Varones

3.00

S.H. Damas

3.00

S.H. Varones

3.00

S.H. Damas

3.00

S.H. Varones

3.00

S.H. Damas

3.00

S.H. Varones

3.00

36

36.00

SEGUNDO PISO

TERCER PISO

CUARTO PISO

12.03.00

COLOCACION DE APARATOS CORRIENTES

PZA

Aparatos Corrientes
12.04.00

36.00

SUMINISTRO Y COLOCACION DE ACCESORIOS SANITARIOSUND

53.00

PRIMER PISO
Accesorio incluye jaboneras, Griferias

11

SEGUNDO PISO
Accesorio incluye jaboneras, Griferias

14

TERCER PISO
Accesorio incluye jaboneras, Griferias

14

CUARTO PISO
Accesorio incluye jaboneras, Griferias

14

URINARIO PARA FLUXOMETRO

4.00

S.H. Varones

4.00

4.00

FLUXOMETRO PARA URINARIO TIPO VAINSA

4.00

S.H. Varones
13.00.00

INSTALACIONES SANITARIAS

13.01.00

SALIDAS DE PVC SAL PARA DESAGUE DE 2"

PTO

40.00

13.02.00

13.03.00

13.04.00

13.05.00

13.06.00

13.07.00

PRIMER PISO

10

10.00

SEGUNDO PISO

10

10.00

TERCER PISO

10

10.00

CUARTO PISO

10

10.00

PRIMER PISO

3.00

SEGUNDO PISO

3.00

TERCER PISO

3.00

CUARTO PISO

3.00

PRIMER PISO

5.00

SEGUNDO PISO

6.00

TERCER PISO

6.00

CUARTO PISO

6.00

SALIDAS DE PVC SAL PARA DESAGUE DE 4"

SUMEDERO BRONCE 2" PROVICION Y COLOCACION

REGISTRO DE BRONCE 4"

PTO

12.00

UND

23.00

UND

15.00

PRIMER PISO

6.00

SEGUNDO PISO

3.00

TERCER PISO

3.00

CUARTO PISO

3.00

1.00

CAJA DE REGISTRO DE DESAGUE 0.45 X 0.60

SALIDAS DE PVC SAL PARA VENTILACION DE 2"

PZA

1.00

PTO

21.00

PRIMER PISO

3.00

SEGUNDO PISO

6.00

TERCER PISO

6.00

CUARTO PISO

6.00

TUBERIA PVC SAL DE DESAGUE 2"

125.17

PRIMER PISO

5.2067

33.61

SEGUNDO PISO

5.3198

30.52

TERCER PISO

5.3198

30.52

CUARTO PISO
13.08.00

TUBERIA PVC SAL DE DESAGUE 4"

5.3198

30.52

96.09

PRIMER PISO

16.031

33.78

SEGUNDO PISO

3.9709

20.77

TERCER PISO

3.9709

20.77

CUARTO PISO

3.9709

20.77

SALIDA DE PVC PARA DESAGUE 6"

ML

19.85

21.55

TRAMPA "P" PVC PARA DESAGUE 2"

23.00

PRIMER PISO

5.00

SEGUNDO PISO

6.00

TERCER PISO

6.00

CUARTO PISO

6.00

YEE SIMPLE PVC PARA DESAGUE DE 4" CON REDUCCION A 2"

25.00

PRIMER PISO

7.00

SEGUNDO PISO

6.00

TERCER PISO

6.00

CUARTO PISO

6.00

YEE SIMPLE PVC PARA DESAGUE DE 4"

7.00

PRIMER PISO

4.00

SEGUNDO PISO

1.00

TERCER PISO

1.00

CUARTO PISO

1.00

YEE SIMPLE PVC PARA DESAGUE DE 2"

5.00

PRIMER PISO

2.00

SEGUNDO PISO

1.00

TERCER PISO

1.00

CUARTO PISO

1.00

CODO DE 45 PVC PARA DESAGUE DE 2"

12

PRIMER PISO

3.00

SEGUNDO PISO

3.00

TERCER PISO

3.00

CUARTO PISO

3.00

CODO DE 45 PVC PARA DESAGUE DE 4"


PRIMER PISO

1.00

SEGUNDO PISO

1.00

TERCER PISO

1.00

CUARTO PISO

1.00

PRIMER PISO

11

11.00

SEGUNDO PISO

14

14.00

TERCER PISO

14

14.00

CUARTO PISO

14

14.00

PRIMER PISO

36.9712

72.47

SEGUNDO PISO

30.4872

58.49

TERCER PISO

30.4872

58.49

CUARTO PISO

30.4872

58.49

14.00.00

SISTEMA DE AGUA FRIA

14.01.00

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"

14.02.00

14.03.00

PTO

53

RED DE DISTRIBUCION DE AGUA FRIA TUBERIA DE 1/2" PVC-SAP


M

247.93

RED DE DISTRIBUCION AGUA CALIENTE TUBERIA DE 1/2" PVC/SAP


M
PRIMER PISO

110.12
8.369

22.57

SEGUNDO PISO

17.982

29.18

TERCER PISO

17.982

29.18

CUARTO PISO

17.982

29.18

RED DE DISTRIBUCION DE AGUA FRIA TUBERIA DE 1" PVC-SAP


PRIMER PISO

18.03
9.63

9.63

SEGUNDO PISO

2.8

2.80

TERCER PISO

2.8

2.80

CUARTO PISO

2.8

2.80

RED DE DISTRIBUCION DE AGUA FRIA TUBERIA DE 3/4" PVC-SAP


PRIMER PISO

14.00
14.00

14.00

14.04.00

VALVULA COMPUERTA DE BRONCE DE 1/2"

PZA

15.00

15.00

14.05.00

VALVULA CHECK 3/4" BRONCE

PZA

2.00

14.06.00

ACCESORIOS VARIOS TANQUE CISTERNA

GBL

1.00

ACCESORIOS VARIOS TANQUE ELEVADO

GBL

1.00

14.07.00

SISTEMA DE BOMBA HIDRAULICA

GBL

1.00

14.08.00

TANQUE ELEVADO DE ETERNIT ACCESORIOS, SUMINISTROGBL


E INSTALACION

1.00

14.09.00

MEDIDOR DE AGUA

PZA

1.00

1.00

14.10.00

CODO 90 DE PVC

PZA

81

81.00

15.00.00
15.01.00

INSTALACIONES ELECTRICAS
PTO

117

15.02.00

SALIDA DE PARED (BRAQUETES) CON PVC

SALIDA PARA CENTRO DE LUZ C/INTERRUPTOR DE COMMUTACION

PTO

12

15.03.00

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

PTO

35

15.04.00

SALIDA PARA TOMACORRIENTE PUESTA A TIERRA CON PVC

PTO

13

15.05.00

CAJA DE PASO PARA CONDUCTOR DATA 0.15x0.20x0.10

UND

RED DE INTERCOMUNICADOR 20mm PVC- P

71.88

RED DE TEVECABLE INTERNO POR PISO 20mm PVC- P

102.91

RED DE TELEFONO INTERNNO POR PISO 20mm PVC- P

135.02

TABLERO DE DISTRIBUCION GENERAL TG

PZA

TABLERO DE DISTRIBUCION TD-01

PZA

INTERRUPTOR SIMPLE

PZA

29.00

INTERRUPTOR DOBLE

PZA

4.00

TOMACORRIENTE BIPOLAR DOBLE

PTO

35

TOMACORRIENTE PUESTA A TIERRA

PTO

13

PUESTA A TIERRA

PZA

10.00

SALIDA PARA THERMA Y ELECTROBOMBA

PTO

1.00

PULSADOR Y INTERCOMUNICADOR

PZA

CAJA DE PASO

PZA

POZO PUESTA A TIERRA

PZA

MEDIDOR DE WATT HORA

PZA

CONDUCTOR SOLIDO 2.5 mm2 TW

687.54

CONDUCTOR SOLIDO 4 mm2 TW

427.88

CONDUCTOR SOLIDO THW 6 mm2 TW

27.92

TANQUE ELEVADO

INTERRUPTORES

TOMACORRIENTES

CONDUCTORES

16.00.00

SALIDA P/COMUNICACIONES Y SEALES

16.01.00

SALIDA P/TELEFONO - INTERNET

PTO

16

16.02.00

SALIDA P/CABLE

PTO

19

17.00.00

APARATOS ELECTRICOS

17.01.00

FLUORESCENTE RECTO ISPE 2X40 W INCLUYENDO EQUIPO Y PANTALLUND

17.02.00

FLUORESCENTE RECTO DE 20W, CON DIVISOR REDONDO DE ACRILICO UND


BLANCO

4.00

17.03.00

FLUORESCENTE CIRCULAR 32W CON DIFUSOR REDONDO DE ACRILICOUND


BLANCO

82.00

17

117
12
35
13
1
71.88
102.91
135.02

5.00
3.00

29.00
4.00

35
13
10.00
1.00
6.00
8.00
1.00
5.00

687.54
427.88
27.92

16.00
19.00

17.00
4.00
82.00

tuberia

ITEM

DESCRIPCIN

UND CANT

LARGO ANCHO ALTO

SUB-TOTAL

METRADO

01.00.00 MOVIMIENTO DE TIERRAS


01.01.00 Excavacion para Escalera y Cisterna

M3

Escalera
Cisterna
01.02.00 Proveniente de la excavacion de Zapata

1.00
2.70

0.50
2.00

0.80
2.57

0.40
13.88

M3

Acarreo del Material Excedente


01.03.00 Proveniente de la excavacion de Zapata

14.28
1
1

18.56
1 14.278

14.28

M3

Eliminacion del Material Excedente

18.56
1 14.278

14.28

03.00.00 OBRAS DE CONCRETO ARMADO


03.01.00 ESCALERA
03.01.01 Concreto en F'c=210 Kg/cm2

M3

Tramo 1
Tramo 2
Tramo 3
03.01.02 Encofrado y Desencofrado

1.00 area
1.00 area
1.00 area

1.06
0.71
0.52

1.06
0.71
0.52

0.18
0.25
4.51
4.85

2.88
4.00
4.51
4.85

M2

pasos
contrapaso

03.01.03 Acero de Refuerzo Fy=4200 kg/cm2

2.29
1
1
1

16.24
16
16
1
1

1.00
1.00
1.00
1.00

KG

167.90

03.02.00 CISTERNA
03.02.01 Concreto en F'c=210 Kg/cm2

03.02.02 Encofrado y Desencofrado

M3
2.70 area
1.70 area

1.18
3.33

3.19
11.32

2
2
2
2
1
3

2.70
2.00
2.40
1.70
1.25
2.40

2.57
2.57
2.27
2.27
2.40
0.15

13.88
10.28
10.90
7.72
3.00
1.08

M2

exterior
exterior
interior
interior
base

03.02.03 Acero de Refuerzo Fy=4200 kg/cm2

14.51
1
2

45.77

KG

357.98

04.00.00 REVOQUES ENLUCIDOS Y MOLDURAS


04.01.00 Revestimiento en escalera Acabado con Cemento : arena

M2

pasos
contrapaso
descanso
04.02.00 Tarrajeo con Impermeabilizante en Cisterna

Cisterna

11.73
16
16
1

1.00
1.00
1.00

0.18
0.25
4.85

2.88
4.00
4.85

M2

12.528
1 Area =

12.528

12.53

You might also like