Constraint Management Numericals

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Roll No. 3,8,9,21,22,26,30 Home Assignment No.

5 Numericals on Constraint Management

1.

Answer a. Machine B b. All of M and as many of N as possible. c. $600 , 100 M & 30 N 2. Willard Lock Company is losing market share because of horrendous due-date performance and long delivery lead times. The company's inventory level is high and includes many finished goods that do not match the short-term orders. Material control analysis shows that purchasing has ordered on time, the vendors have delivered on time, and the scrap/rework rates have been as expected. However, the build-able mix of components and subassemblies does not generally match the short-term and past-due requirements at final assembly. End-of-month expediting and overtime are the rule, even though there is idle time early in the month. Overall efficiency figures are around 70 percent for the month. These figures are regarded as too low. You have just been hired as a consultant and must come up with recommendations. Help the firm understand its problems. Specifically state some actions that it should be taken. Answer The company can go for the following actions 1) 2) 3) 4) 5) 6) 7) 8) Go for Pull Production System JIT-Kanban System Implementation Adapting Lean Manufacturing Rationalizing Line Balancing Levelling of work releases Improving M/C reliability Splitting of Jobs Sharing transfer batches

9) 10) 11) 12) 13) 14) 15)

Synchronized finite capacity scheduling Operation Splitting Bottle neck oriented scheduling Reducing Batch Size Improving Labour Flexibility Selective Inventory Control Layout Modifications

You might also like