The document provides design specifications for a pile foundation in Indonesian. It includes dimensions for the pile, column, and load values. It also lists soil properties from soil testing including density, bearing capacity, and penetration resistance. Design calculations are shown for the number of piles needed, pile dimensions, required reinforcement, and checks that the design meets requirements.
The document provides design specifications for a pile foundation in Indonesian. It includes dimensions for the pile, column, and load values. It also lists soil properties from soil testing including density, bearing capacity, and penetration resistance. Design calculations are shown for the number of piles needed, pile dimensions, required reinforcement, and checks that the design meets requirements.
The document provides design specifications for a pile foundation in Indonesian. It includes dimensions for the pile, column, and load values. It also lists soil properties from soil testing including density, bearing capacity, and penetration resistance. Design calculations are shown for the number of piles needed, pile dimensions, required reinforcement, and checks that the design meets requirements.
dimensi kolom bulat (meter) PEMBEBANAN d = 0,750 b.s. poer : 6786,00 kg L = 5,200 beban bang. atas : 68434,80 kg A = 0,442 b.s. kolom : 5513,50 kg dimensi poer (meter) S V = 80734,30 kg B = 1,300 l = 2,900 DIMENSI t = 0,750 luas sumuran yg diperlukan; A = 0,995 m 2 data lain : direncanakan jml sumuran, n = 2 buah g t = 1500 kg/m 3 luas per sumuran, Ai = 0,498 m 2 g beton cyclop = 2200 kg/m 3 diameter sumuran terhitung, d = 0,796 m S G = 68434,8 kg ambil diameter sumuran, d = 0,80 m luas sumuran total As = 1,005 m 2 tegangan tanah pd dasar poer/lapisan pasir : panjang sumuran, Ls = 5,000 m f = 20 dari tabel Terzaghi : luas poer, Ap = 3,770 m 2 c = 0 Nc = 17,7 luas poer netto , An = 2,765 m 2 Df = 1 m, Nq = 7,43 B = 1,300 m, Ng = 4,6 qu = 13836 sf = 3 DATA SONDIR q a = 4612 kg/m 2 qc pd 1.5 D ke atas = 15 kg/cm 2 0,461 kg/cm 2 qc pd ujung sumuran = 28 kg/cm 2 qc pd 1.5 D ke bawah = 30 kg/cm 2 reaksi pd dasar poer, Gp = 12750,75 kg s t = 8,1111111 kg/cm 2 kapasitas beban sumuran, Q = 81541,78 kg s t = 81111,111 kg/m 2 berat sendiri sumuran, Gs = 11058,41 kg berat yg dipikul sumuran, S W = 79041,95 kg W < Q ........ ok tegangan tanah yg timbul, s t = 78624,48 kg/m 2 sumuran aman ...ok Penulangan pd sumuran, diambil A min = 1% A luas tulangan minimum, A min = 5026,55 mm 2 diambil diameter tulangan, f = 19 mm luas = 283,53 mm 2 jumlah tulangan diperlukan = 17,728532 buah ambil jumlah tulangan = 18 buah A ada = 5103,5173 mm 2 A ada > A min ........ ok dipasang sepanjang 1/3 L = 1,67 m kontrol penempatan tulangan tulangan sengkang = 8 mm selimut beton = 50 mm diameter sumuran efektif = 665 mm keliling = 2089,16 mm keliling tulangan pokok = 342 mm jarak tulangan = 97,06 mm luas sumuran mencukupi ...ok well design 05/05/2010 14:01 elevasi 0.00 m adalah muka tanah elevasi lantai dasar -300 m elevasi dasar poer -425 m elevasi ujung sumuran - 925 m DATA SPT N = 15 q all = 26972 kg/cm 2 well design 05/05/2010 14:01