3G RBS Acceptance Checklist

Site Name:

Site ID:

Acceptance Test Procedure For Node B


The site must pass the following criteria to allow final accepatance. The Ops engineer must visit the site with-in 48 hrs after notification from NID that the site is live. If the following criteria are not met the Ops engineer is empowered to halt the site until NID has resolved the Issues. The Ops engineer must telephonically notify the site controller before the site is halted. The N ! will halt the site. The N ! must "eep a record of all halted sites and the reasons why they are halted.

1. #
#$.# #$./ #$.#$.4 #$.7 #$.9 #$.$

OPERATIONAL TESTS & DOCU ENTATION TASK DESCRIPTION


NO %& '(') & '!TI*+ ON T,+ -. )%& 'NT+NN'0& 1 2++D+) &3&T+ ++T *&4) &5+!I2I!'TION.

PASS

FAIL

N/A

'NT+NN' &4++5 )+&6(T& ON &IT+ !ON2I) NO &4'55+D &+!TO)& ON .& 'NT+NN'0&

'!TI*+ T)6 !O6NT

++T& 4' )+86I)+ +NT

-. INT+.)'T+D (I*+ 4IT, NO '!TI*+ '(')

APPRO!ALS S"te "nspected B# $FSE% Name& S"'nature& Date&

Confidential

- 1-

Doc. No.: MTNN0-NWG-NOD-CHK-001