Professional Documents
Culture Documents
Bus Assembly Inspection and Test Plan: Pprovals Rgon Nergy Ustomer AME Ignature ATE
Bus Assembly Inspection and Test Plan: Pprovals Rgon Nergy Ustomer AME Ignature ATE
PROJECT NAME: APPROVALS NAME SIGNATURE DATE LEGEND: A = Action; H = Hold; W = Witness, V = Verify, N/A = not required ITEM NO. 1 ITEM DESCRIPTION Earth Connection Resistance ACCEPTANCE CRITERIA < 0.5 ohm <100 micro-ohm or manufacturers specification (minimal variation between like connections) >1000 Mohm No disruptive discharge All items completed as per design specification VERIFYING DOCUMENT SP0515C01 Delete or add items as required to comply with scope of works ACTION / INSPECTION REQUIREMENT By who? Comment ERGON ENERGY PROJECT NO: ITP NO: CUSTOMER REV:
Code
Joint Resistance
SP0515C01
Secondary Systems
3 4 5 6
A A A
1. Earth
Verification by Commissioning Officer of Satisfactory Completion (sign off) 2. Joint 3. Insulation 4. HV Withstand 5. Checklist Resistance Resistance
Comment 6. N/A
Page 1 of 1
Ergon Energy Corporation Limited ABN 50 087 646 062 Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Form SP0515C03 Ver 1 Form Owner: Neil Dwyer, Manager Technical Services