CRUSHER
CRUSHER
CRUSHER
Crusher House Structure Variation order PGMAs not defined by competent authority. Drgs first Lot received & hardcopies handed over to package holder.(Noted-PGMA is 01-03) Second Lot of Drgs received yesterday through Aconex & also DU-Lists. As per unloading of material by Sokeo available Tonnage of Material AS ON 24-03-2014 is 144 MT locations identified (Noted PGMAs -01-03, 01-05) 5. Tools & Tcakles 6. Bed Material-- raw material i.e., ISA 40x40x4 - 1000 Mts.(for ladder material) 7. shim plates material in crusher house PGMA (01-03) the same material used to STG as per CL records. But we require 1700 kgs of shim material.
Sequence of Work:-
UG-Piping 1. Drgs available with F04191S-J1408 series but in layout of UG-Piping other series of Drgs are listed. 2. No clarity on completeness of Drgs. & DU List not available 3. 4.
Sequence of work