FTTH network Nuenen project Holland

Harry Ferguson Emtelle UK LImited

Nuenen town size: 450 ha and 8000 buildings


Privately Owned Single-Dwelling Untis Detached house Semi-detached house Corner house Terraced house Other Subtotal 715.133 726.445 484.484 994.425 301.522 3.222.010 Rented 62.186 128.196 429.637 955.428 84.377 1.659.823 Total

The Netherlands
16.300.000 persons 6.800.000 house holds

(66,0%)

(11%) (11%) (7%) (15%) (4%) (48%)

(34,0%)

(1%) (2%) (6%) (14%) (1%) (25%)

777.319 854.641 914.121 1.949.853 385.899 4.881.833

(100,0%)

(11%) (13%) (14%) (29%) (6%) (72,1%)

Multi-Dwelling Units Misc. Subtotal

313.359 313.359

(16,6%) (52,2%)

(5%) (5%) (52%)

1.574.348 1.574.348

(83,4%) (47,8%)

(23%) (23%) (48%)

1.887.707 1.887.707

(100,0%) (100,0%)

(28%) (27,9%) (100%)

TOTAL

3.535.369

3.234.171

6.769.540

North Sea

Nuenen

Germany

Belgium

Key figures for the Nuenen project: 8000 buildings 7500 to be connected in 2004 8 contractor sites 1 main contractor and 4 sub contractors 80 handhole locations
Town of van Gogh

Emtelle deliveries: 1250km 2 fibre unit 125km 24DB3mm 170km 1DB3mm 4500 Tube Distribution closures Tube connectors, optical pigtails, etc Training, supervision, documentation
Tube distribution closure installation

The Nuenen township surroundings


BRE Channel

Lieshout

NED

STIP
GER

River
8000 conn 450 ha

Nuenen
road Eindhoven
EEN

Canal Industrial area

Telecom connections

Detached Semi-detached Corner house Multi dwelling/flats

Small Medium large

Schools Sportclubs Churches Fire stations Police

Network names

PoP location
ODF

NetworkTransition Cabinet
Tube organizer Splice location Blowing point

C-BOX

C-BOX

Feeder
Ethernet backbone switch

Access outdoor
Tube distribution closures (TDC)

Splice closures

FibreFlow Transition Point

FibreFlow area

Nuenen project with Emtelles 3mm solution Basic layout of the OSP network and the components
2 FU bead/7318 Fibre blowing point 2 FU unit/7470

Customer box

DBmf 1x 5/2.1mm/6834 1DB 5/2.1mm connecting kit/7787B

Transition closure GCO


POP Z-7 handhole 1x192 SM fibre

3mm Waterblock Connector/7314

Tube connector reducer 3/2.1 to 5/2.1/7652 6way TDC Grommet/7717

576 SM fibre Loose tube cable

(4 x) DB 24x3/2.1mm/6788
3x192 SM fibre Loose tube cable 3mm tube end cap/7593 6mm tube end cap/7311 TDC kit + 24/3+1/6mm connectors/7745 Heatshrink end cap 4-12mm/7060 Heatshrink endcap 15-36mm/7057 Pigtail SCA 900um, 0.5m/7753 Pigtail SC 1mm, 1m/7754 Pigtail SCPC 900um, 0.5m/7773 Tube connector 5/2.1mmstraight/7742
6

Tube Distribution closure TDC/7514

Strech end cap and resin Pack/7762

Tube connector 3mm straight/7312 Tube connector 6mm straight /7310

Fibre unit blowing equipment


1-compressor
15 bar code 7244 10 bar code 7028 Blowing unit 2004 code 7779 Transformer 220V110V code 7286

2-control unit
Dispencer 16A code 7009

3-blowing head
Guide Arm code 7851

Fibre plate 4 FU 7584

Smooth green tyres code 7032

2/4 FU bead code 7318a Toolkit code 7338B Airflow kit 820B code 7778

4-Fibre pan

Nuenen project in progress


The Transition location The organisation: ONS NET 24DB3 at a road crossing

TDC installation Watching by Van Gogh

TDC installed for 2 houses

From PoP location to Transition closure (Feeder network) PoP location indoor view

HDPE duct for feeder cables (green)

1 handhole for feeder closure 1 handhole for transition clos.

Splices Microtube Ducts/fibre cables

Patch cord Organizer

Electronics

Pigtail-Patch cord

3/2.1mm micro tubes

Blow-in point Location

Optical Distribution Frame

Back and front access needed

PoP Ducting System

Minimum bending radius 30mm Ducting available in 300, 220, 100, 100x50, 50 and 30mm Inclusive lids for complete cable protection UV Light-resistant Halogen-free UL94VO Different components such as straight ducts, tee pieces, elbows, reducing adapters, ..

Trainsition point: handhole and closure

Handhole locations are 6 months open!

From Transition closure to the buildings (Access network)

9x5/3.5mm + 1x10/8mm DB

24x5/3.5mm + 1x10/8mm DB

1x 5/3.5mm DB

Blowing from the Transition location to the houses

Blowing and splicing at Transition location

Fixing tube, CBOX and fibre unit

House entrance connection

Coding PoP location Nuenen Cable 576/NEM8-03 Cable Tube bundle 192/NEM8-03C DB24/NEM8-03C-1 Tube BL-2

Speeding-up installations
Blowing distance 200-600m Blowing speed 35m/min Waiting time 6-17 min Blowing distance 200-600m Blowing speed 50m/min Waiting time minimal: 4-12 min Connections per day Target 50 10 min per connection

People can not find the front door key Blowing problems Indoor installation delays Testing, connections mistakes,etc

1. Disconnect blowing from indoor installation 2. Splicer and blower are waiting to long 1. At the customer 2-3m FU must be stored 2. More blowing heads in parallel on one compressor