The Netherlands
16.300.000 persons 6.800.000 house holds
(66,0%)
(34,0%)
(100,0%)
313.359 313.359
(16,6%) (52,2%)
1.574.348 1.574.348
(83,4%) (47,8%)
1.887.707 1.887.707
(100,0%) (100,0%)
TOTAL
3.535.369
3.234.171
6.769.540
North Sea
Nuenen
Germany
Belgium
Key figures for the Nuenen project: 8000 buildings 7500 to be connected in 2004 8 contractor sites 1 main contractor and 4 sub contractors 80 handhole locations
Town of van Gogh
Emtelle deliveries: 1250km 2 fibre unit 125km 24DB3mm 170km 1DB3mm 4500 Tube Distribution closures Tube connectors, optical pigtails, etc Training, supervision, documentation
Tube distribution closure installation
Lieshout
NED
STIP
GER
River
8000 conn 450 ha
Nuenen
road Eindhoven
EEN
Telecom connections
Network names
PoP location
ODF
NetworkTransition Cabinet
Tube organizer Splice location Blowing point
C-BOX
C-BOX
Feeder
Ethernet backbone switch
Access outdoor
Tube distribution closures (TDC)
Splice closures
FibreFlow area
Nuenen project with Emtelles 3mm solution Basic layout of the OSP network and the components
2 FU bead/7318 Fibre blowing point 2 FU unit/7470
Customer box
(4 x) DB 24x3/2.1mm/6788
3x192 SM fibre Loose tube cable 3mm tube end cap/7593 6mm tube end cap/7311 TDC kit + 24/3+1/6mm connectors/7745 Heatshrink end cap 4-12mm/7060 Heatshrink endcap 15-36mm/7057 Pigtail SCA 900um, 0.5m/7753 Pigtail SC 1mm, 1m/7754 Pigtail SCPC 900um, 0.5m/7773 Tube connector 5/2.1mmstraight/7742
6
2-control unit
Dispencer 16A code 7009
3-blowing head
Guide Arm code 7851
2/4 FU bead code 7318a Toolkit code 7338B Airflow kit 820B code 7778
4-Fibre pan
From PoP location to Transition closure (Feeder network) PoP location indoor view
Electronics
Pigtail-Patch cord
Minimum bending radius 30mm Ducting available in 300, 220, 100, 100x50, 50 and 30mm Inclusive lids for complete cable protection UV Light-resistant Halogen-free UL94VO Different components such as straight ducts, tee pieces, elbows, reducing adapters, ..
9x5/3.5mm + 1x10/8mm DB
24x5/3.5mm + 1x10/8mm DB
1x 5/3.5mm DB
Coding PoP location Nuenen Cable 576/NEM8-03 Cable Tube bundle 192/NEM8-03C DB24/NEM8-03C-1 Tube BL-2
Speeding-up installations
Blowing distance 200-600m Blowing speed 35m/min Waiting time 6-17 min Blowing distance 200-600m Blowing speed 50m/min Waiting time minimal: 4-12 min Connections per day Target 50 10 min per connection
People can not find the front door key Blowing problems Indoor installation delays Testing, connections mistakes,etc
1. Disconnect blowing from indoor installation 2. Splicer and blower are waiting to long 1. At the customer 2-3m FU must be stored 2. More blowing heads in parallel on one compressor