Professional Documents
Culture Documents
Mechanical Workshop 2: LV Proposed Cable Route HV Existing Cable Route LV Existing Cable Route
Mechanical Workshop 2: LV Proposed Cable Route HV Existing Cable Route LV Existing Cable Route
Mechanical Workshop 2: LV Proposed Cable Route HV Existing Cable Route LV Existing Cable Route
GROUND SLOTS
FLOODLIGHT TOWER
FIRE HYDRANT
INSPECTION CHAMBER
ME
CH
AN
ICA
1:1.
TO IL
ET
KIT C
MANHOLE
A
Proposed layout LV pipes
A
C
MH1
MECHANICAL WORKSHOP 2
REEFERRACK No.1
REEFERRACK No.2
REEFERRACK No.3
REEFERRACK No.5
D
MH1
Date:
Rev:
Revision Details:
Existing MH
1* 150 5
THIS DRAWING IS CONFIDENTIAL AND THE INFORMATION CONTAINED HEREIN IS A CONFIDENTIAL DISCLOSURE. IT IS SHOWN ON THE UNDERSTANDING THAT IT IS NOT TO BE REVEALED TO OTHERS OR USED FOR ANY OTHER PURPOSE WITHOUT THE WRITTEN CONSENT OF UTMOST CONSULTANTS.
CLIENT:
CONSULTANTS:
7
UTMOST CONSULTANTS
CONSULTING CIVIL & STRUCTURAL ENGINEERS
EARTH PIT
RAIL CONNECTION RAIL CONNECTION
EMAIL: utmost@swiftmombasa.com
P.O. BOX 83660 TEL: 2229926 MOMBASA
SEABED CONNECTION
SEABED CONNECTION
PROJECT:
RAIL CONNECTION RAIL CONNECTION SEABED CONNECTION
TITTLE:
LOCATION PLAN
UC/14/KPA/001
Chk:
Appr: