Mechanical Workshop 2: LV Proposed Cable Route HV Existing Cable Route LV Existing Cable Route

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LV PROPOSED CABLE ROUTE HV EXISTING CABLE ROUTE LV EXISTING CABLE ROUTE

GROUND SLOTS

FLOODLIGHT TOWER

FIRE HYDRANT

DISTRIBUTION BOARD PILLAR BOX

INSPECTION CHAMBER

ME

CH

AN

ICA

CATHODIC PROTECTION DRAW PIT,


LW OR KSH OP 1
SUB STATION T SUB STATION Q
Existing MH
HE N

1:1.

TO IL

ET

KIT C

MANHOLE

A
Proposed layout LV pipes

A
C
MH1

MECHANICAL WORKSHOP 2

NEW RECTIFIER STATION

REEFERRACK No.1

REEFERRACK No.2

REEFERRACK No.3

REEFERRACK No.5

D
MH1

REVDETAILS REVDETAILS REVDETAILS REVDETAILS

Date:

Rev:

Revision Details:

Existing MH

1* 150 5

THIS DRAWING IS CONFIDENTIAL AND THE INFORMATION CONTAINED HEREIN IS A CONFIDENTIAL DISCLOSURE. IT IS SHOWN ON THE UNDERSTANDING THAT IT IS NOT TO BE REVEALED TO OTHERS OR USED FOR ANY OTHER PURPOSE WITHOUT THE WRITTEN CONSENT OF UTMOST CONSULTANTS.

CLIENT:

KENYA PORTS AUTHORITY KPA


8 9

CONSULTANTS:
7

UTMOST CONSULTANTS
CONSULTING CIVIL & STRUCTURAL ENGINEERS
EARTH PIT
RAIL CONNECTION RAIL CONNECTION

1OTH FLOOR AMBALAL HOUSE SOUTH WING

EMAIL: utmost@swiftmombasa.com
P.O. BOX 83660 TEL: 2229926 MOMBASA
SEABED CONNECTION

SEABED CONNECTION

PROJECT:
RAIL CONNECTION RAIL CONNECTION SEABED CONNECTION

ELECTRICAL INSTALATIONS CABLE ROUTE FROM SUB STATION Q TO REFFERS.

TITTLE:

LOCATION PLAN

Dwg By: BMW Date: JAN2014 Scale:

Checked: JMN Date: JAN2014 Drawing No:

Approved: JMN Date: DATE Rev:

UC/14/KPA/001

Chk:

Appr:

You might also like